{"id":4044,"date":"2015-11-04T10:24:30","date_gmt":"2015-11-04T10:24:30","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4044"},"modified":"2015-11-09T18:08:05","modified_gmt":"2015-11-09T18:08:05","slug":"tanzania-mnazi-bay-production-volume-at-33-mmscfday-in-october","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mnazi-bay-production-volume-at-33-mmscfday-in-october\/","title":{"rendered":"Tanzania Mnazi Bay Production Volume at 33 mmscf\/day in October"},"content":{"rendered":"<p>Production volumes to the new transnational pipeline in October to production facilities at Madimba, the Mtwara to Dar es Salaam pipeline and the Kinyerezi Gas Receiving Facility stood at 33 mmscf\/day.<\/p>\n<p>This is from three of the five existing gas wells at Mnazi Bay that have been successfully brought on-stream with the fourth well expected to be tied in during the month of November 2015 and the fifth well is expected to be tied in and ready to produce into the new pipeline in Q1 2016.<\/p>\n<p>Production volumes into the Mtwara to Dar es Salaam pipeline are expected to reach 80 mmscf\/day in Q4 2015.<\/p>\n<p>Sales gas volumes of 1,032 mmscf were delivered to the <a href=\"http:\/\/ht.ly\/Ue6xT\">new pipeline<\/a> during October 2015 (an average of 33 mmscf\/day) and a gross payment of $3.8 million to the Mnazi Bay Joint Venture Partners has been received from the buyer of the gas, Tanzania Petroleum Development Corporation (TPDC).<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" wp-image-4046 size-medium alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-300x250.png?resize=300%2C250&#038;ssl=1\" alt=\"Mnazi Bay wells\" width=\"300\" height=\"250\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells.png?resize=300%2C250&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells.png?resize=100%2C83&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells.png?w=515&amp;ssl=1 515w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Under the Gas Sales Agreement signed on 12 September 2014, the sale price has been set at US$3.00 per million BTU, approximately US$3.07 per thousand cubic feet, rising in line with the US CPI industrial index commencing in 2016.<\/p>\n<p>&#8220;We are\u00a0pleased with the progress that has been made by the Government during the start-up and commissioning phases and we are delighted about how well the new pipeline system is working. We, along with our Joint Venture Partners, feel confident that our existing wells will be capable of delivering the initial target production volumes of 80mmscf\/d while we expect the Government owned power plants to be ready to take the full amount of these volumes during the last quarter of 2015. The Mnazi Bay Concession gas plays a vital role in reducing the cost and improving the reliability of power generation in Tanzania,&#8221; commented Wentworth Resources Managing Director Geoff Bury.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-2.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4066 \" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-2.png?resize=827%2C442&#038;ssl=1\" alt=\"Mnazi Bay wells 2\" width=\"827\" height=\"442\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-2.png?w=951&amp;ssl=1 951w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-2.png?resize=100%2C53&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-2.png?resize=300%2C160&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Mnazi-Bay-wells-2.png?resize=768%2C410&amp;ssl=1 768w\" sizes=\"auto, (max-width: 827px) 100vw, 827px\" \/><\/a><\/p>\n<p>Mnazi Bay Gas is currently being used to generate power in Dar es Salaam at the existing Ubungo-II and Symbian power plants, as well as at the 150MW new Kinyerezi-I power plant.<\/p>\n<p>New infrastructure combined with Mnazi Bay gas expected to reduce average cost of power generation from $0.20\/kWhr to $0.08\/kWhr. The current selling price is $0.16\/kWhr.<\/p>\n<p>Maurel et Prom is the operator at the Concession with 48.06 percent through production, Wentworth 31.94 percent\u00a0 while the Tanzania Petroleum Development Corporation holds the remaining 20 percent.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Production volumes to the new transnational pipeline in October to production facilities at Madimba, the Mtwara to Dar es Salaam pipeline and the Kinyerezi Gas Receiving Facility stood at 33 &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mnazi-bay-production-volume-at-33-mmscfday-in-october\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4045,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[3776,3778,1534,1608,3057,3779,2472,3777,2719],"class_list":["post-4044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-kinyerezi-gas-receiving-facility","tag-kinyerezi-i-power-plant","tag-maurel-et-prom","tag-mnazi-bay","tag-mtwara-to-dar-es-salaam-pipeline","tag-symbian-power-plant","tag-tanzania-petroleum-development-corporation","tag-ubungo-ii-power-plant","tag-wentworth-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Production-operations-at-Mnazi-Bay-MB-3-development-well.png?fit=850%2C477&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-13e","jetpack-related-posts":[{"id":4251,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mnazi-bay-production-volume-to-reach-70-mmscfday-q1-2016\/","url_meta":{"origin":4044,"position":0},"title":"Mnazi Bay Production Volume To Reach 70 MMscf\/day in Q1 2016","author":"","date":"January 14, 2016","format":false,"excerpt":"Gas deliveries to the new transnational pipeline and directly to a power plant in Mtwara averaged 55 MMscf\/d production \u00a0during the month of December 2015 up from 46 MMscf\/d in November. To date, growing gas demand from the power sector has been impacted by delays experienced in commissioning the new\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/01\/Mnazi-Bay-Concession.png?fit=448%2C554&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2343,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mtwara-to-dar-es-salaam-gas-pipeline-project-update\/","url_meta":{"origin":4044,"position":1},"title":"Mtwara to Dar Es Salaam Gas Pipeline Project update","author":"Samuel Kamau Mbote","date":"January 21, 2015","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Source:\u00a0Tanzania Petroleum Development Corporation a) Completion and the commissioning of treatment plants natural gas - February 2015; b) Construction of Valve Stations 16 required for the entire pipeline will be completed\u00a0at the end of January 2015; c) Construction of facilities receiving natural gas Mtwara, Somanga, Vote, Kilwa, Kinyerezi\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/songo-songo2.png?fit=465%2C546&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4527,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-gas-demand-to-outstrip-supply-by-2018\/","url_meta":{"origin":4044,"position":2},"title":"Tanzania\u2019s Gas Demand To Outstrip Supply by 2018","author":"","date":"March 29, 2016","format":false,"excerpt":"Tanzania is expected to surpass its current supply in the next two years with the current demand being 80mmscf\/d mainly from existing power plants as the country continues to experience chronic power shortages according to Wentworth Resources. Next year the demand is expected to surge to 120mmscf\/d with the new\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kinyerezi-Gas-Receiving-Station.png?fit=455%2C217&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1934,"url":"https:\/\/www.oilnewskenya.com\/index.php\/exclusive-mtwara-to-dar-es-salaam-gas-pipeline-project-update\/","url_meta":{"origin":4044,"position":3},"title":"Exclusive: Mtwara to Dar Es Salaam Gas Pipeline Project update","author":"Samuel Kamau Mbote","date":"October 21, 2014","format":false,"excerpt":"The construction of the Mtwara to Dar Es Salaam Gas Pipeline Project is almost complete with 504 km welded pipes of 505 km complete with 499 km trenched at Dar es Salaam Mkuranga, Lindi and Mtwara sections leaving less than 7 km to be done. This is according to the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/songo-songo2.png?fit=465%2C546&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2772,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mtwara-dar-es-salaam-pipeline-now-complete-first-gas-delivery-expected-july-2015\/","url_meta":{"origin":4044,"position":4},"title":"Mtwara to Dar es Salaam pipeline now complete, first gas delivery expected in July 2015","author":"","date":"March 31, 2015","format":false,"excerpt":"East Africa-focused oil & gas company has announced that the construction of the Government owned and operated Mtwara to Dar es Salaam pipeline is now 100% complete and the two associated processing facilities are approximately 96% complete. Wentworth Resources today provides an operational update in the lead up to the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentwirth-logo.png?fit=376%2C285&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6641,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gas-delivery-begin-kinyerezi-2-gas-fired-power-plant-tanzania\/","url_meta":{"origin":4044,"position":5},"title":"Gas Delivery Begin at Kinyerezi 2 Gas Fired Power Plant in Tanzania","author":"","date":"December 20, 2017","format":false,"excerpt":"Gas delivery has commenced to Tanzania\u2019s newest power facility, Kinyerezi-2 for commissioning of the first two of six gas turbines to the national grid according to Mnazi Bay jv partner Wentworth Resources in its latest update. The project which worth approximately $432 million USD in the Kinyerezi area in Dar\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/12\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/12\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/12\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/12\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4044"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4044\/revisions"}],"predecessor-version":[{"id":4067,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4044\/revisions\/4067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4045"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}