{"id":3895,"date":"2015-10-12T18:25:00","date_gmt":"2015-10-12T18:25:00","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=3895"},"modified":"2017-01-27T12:53:51","modified_gmt":"2017-01-27T12:53:51","slug":"tanzania-to-generate-2000mw-electricity-from-natural-gas-by-2018","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-to-generate-2000mw-electricity-from-natural-gas-by-2018\/","title":{"rendered":"Tanzania to Generate 2000MW Electricity from Natural Gas by 2018"},"content":{"rendered":"<p>Tanzania hopes to generate 2000 megawatts from natural gas in the next three years as the country hopes to increase its power generation capacity to 10,000 megawatts by 2025.<\/p>\n<p>Already the country has launched a 532 kilometre from Mtwara through Songo Songo to Dar es Salaam pipeline last weekend will utilize gas from four onshore wells at the Kiliwani North Development license.<\/p>\n<p>The 24-36 inch pipeline which was financed by the Export Import Bank of China through a $1.25 billion concessional loan began construction in 2013 with corks being undertaken by the China Petroleum Technology and Development Corporation (CPTDC), a subsidiary of China National Petroleum Company (CNPC).<\/p>\n<p>The pipeline launched last weekend began at amounts of<br \/>\n60 MMcf\/day from three production wells each producing 20MMcf\/day with the fourth well also expected to produce 20MMcf\/day is expected to come online by the end of October making the daily total output 80MMcf\/day.<\/p>\n<p>The pipeline has a total capacity of 784 MMcf\/d of gas, to be used for the production of 3,900 MW of electricity.<\/p>\n<p>Tanzanian President Jakaya Kikwete during the launch said utilization of natural gas for generation of electricity would help end power shortages that continue to plague the East African country due to the overreliance on the weather independent hydropower which contributes 57 % of total power.<br \/>\nAlready six dams used for power generation have been shut down as water levels continue to drop.<\/p>\n<p>Tanzania has been generating power from natural gas since 2008 through the Ubungo Gas Plant which has a total installed capacity of 104 MW from twelve generating units each with a capacity of 8.73MW.<\/p>\n<p>Other than natural gas Tanzania hopes to utilize its coal reserves as well as wind and geothermal.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tanzania hopes to generate 2000 megawatts from natural gas in the next three years as the country hopes to increase its power generation capacity to 10,000 megawatts by 2025. Already &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-to-generate-2000mw-electricity-from-natural-gas-by-2018\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":3896,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[730,3681,1195,1321,3682,1696,2365,2466],"class_list":["post-3895","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-electricity","tag-generation","tag-jakaya-kikwete","tag-kiliwani-north","tag-mtwara-dar-es-salaam-pipeline","tag-natural-gas","tag-songo-songo","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/tanzania-pipeline.jpg?fit=600%2C450&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-10P","jetpack-related-posts":[{"id":3884,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-president-set-to-launch-gas-processing-facility-and-pipeline-at-mtwara\/","url_meta":{"origin":3895,"position":0},"title":"Tanzania President set to launch Gas Processing Facility and Pipeline at Mtwara","author":"","date":"October 6, 2015","format":false,"excerpt":"Tanzania President Jakaya Kikwete is this week expected to launch gas processing facility and pipeline from Mtwara through Songo songo to Dar es Salaam according to Tanzania Petroleum Development Corporation (TPDC) managing director Dr. James Mataragio. According to Mataragio construction works are already complete with pumping of gas already ongoing\u2026","rel":"","context":"In &quot;Profile&quot;","block_context":{"text":"Profile","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/profile\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/Songo-Songo-Orca-exploration.png?fit=302%2C417&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2343,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mtwara-to-dar-es-salaam-gas-pipeline-project-update\/","url_meta":{"origin":3895,"position":1},"title":"Mtwara to Dar Es Salaam Gas Pipeline Project update","author":"Samuel Kamau Mbote","date":"January 21, 2015","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Source:\u00a0Tanzania Petroleum Development Corporation a) Completion and the commissioning of treatment plants natural gas - February 2015; b) Construction of Valve Stations 16 required for the entire pipeline will be completed\u00a0at the end of January 2015; c) Construction of facilities receiving natural gas Mtwara, Somanga, Vote, Kilwa, Kinyerezi\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/songo-songo2.png?fit=465%2C546&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1912,"url":"https:\/\/www.oilnewskenya.com\/index.php\/solo-oil-acquires-interest-in-kiliwani-north-gas-field-tanzania\/","url_meta":{"origin":3895,"position":2},"title":"Solo Oil acquires interest in Kiliwani North Gas Field, Tanzania","author":"Samuel Kamau Mbote","date":"October 15, 2014","format":false,"excerpt":"Solo Oil plc has announced that it has signed binding heads of agreement to acquire an initial 6.5%\u00a0 interest in the soon to be producing Kiliwani North Development License in Tanzania from Ndovu Resources Ltd. for a total consideration of US$3.5 million (\"Initial Acquisition\"). Solo also has a 45 day\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4613,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-madimba-songo-songo-to-dar-es-salaam-gas-pipeline-costs-1-3-billion\/","url_meta":{"origin":3895,"position":3},"title":"Tanzania\u2019s Madimba, Songo Songo to Dar es Salaam Gas Pipeline Cost $1.3 Billion","author":"","date":"April 25, 2016","format":false,"excerpt":"The Tanzania Petroleum Development Corporation has released a statement on costs involved in the Madimba, Songo Songo to Dar es Salaam gas pipeline since construction commenced in 2013 to completion date in 2015. The project which cost $1.225 billion was financed by the Chinese Government to the tune of $1.16\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/songo-songo2.png?fit=465%2C546&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4496,"url":"https:\/\/www.oilnewskenya.com\/index.php\/commissioning-of-tanzanias-songo-songo-island-gas-set-for-april-2016\/","url_meta":{"origin":3895,"position":4},"title":"Commissioning of Tanzania\u2019s Songo Songo Island gas plant Set for April 2016","author":"","date":"March 15, 2016","format":false,"excerpt":"The Tanzania Petroleum Development Corporation (TPDC) has provided a revised work schedule in the \u00a0Kiliwani North license and informed the operator Aminex that the commissioning of the Songo Songo Island gas plant is expected to commence in early April. Aminex which concluded the final well integrity testing of the Kiliwani\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kiliwani-north-1-well.png?fit=493%2C556&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2577,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-draws-closer-gas-production-kiliwani-north-1-well\/","url_meta":{"origin":3895,"position":5},"title":"Tanzania draws closer to gas production from the Kiliwani North 1 well","author":"","date":"February 19, 2015","format":false,"excerpt":"Aminex has notified shareholders that the Tanzanian Petroleum Development Corporation (TPDC), through its contractors, has now begun constructing the Skid Metering Unit within the boundaries of the Kiliwani North Development Licence (KNDL) and have completed laying pipe to the KNDL boundary. Once construction is complete the Kiliwani North 1 well\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=3895"}],"version-history":[{"count":4,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3895\/revisions"}],"predecessor-version":[{"id":3976,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3895\/revisions\/3976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/3896"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=3895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=3895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=3895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}