{"id":3829,"date":"2015-09-17T21:07:57","date_gmt":"2015-09-17T21:07:57","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=3829"},"modified":"2015-09-17T21:07:57","modified_gmt":"2015-09-17T21:07:57","slug":"erhc-still-hopeful-first-well-kenyas-block-11a-march-2016","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/erhc-still-hopeful-first-well-kenyas-block-11a-march-2016\/","title":{"rendered":"ERHC still hopeful of first well in Kenya\u2019s Block 11A by March 2016"},"content":{"rendered":"<p>Kenya\u2019s Block 11A joint venture partner ERHC says the contracting parties plan to spud the first well at the Tarach-1 prospect by the end of the first quarter of 2016 in its latest update.<\/p>\n<p>The Tarach-1 prospect located at the central part of the Tarach basin is a three-way structural closure trapping against a North &#8211; South trending normal fault.<\/p>\n<p>\u201cThe contracting parties plan to spud the first well at the Tarach-1 prospect by the end of the first quarter of 2016,\u201d says the company in the latest update.<\/p>\n<p>The seismic data also shows that the basin\u2019s stratigraphy which is believed to be Tertiary\/Cretaceous age could be similar to the Lokichar basin 200 km to the southeast of Block 11A, where significant discoveries have been made with over 600 million barrels of 2C contingent resources.<\/p>\n<p>&nbsp;<\/p>\n<p>The decision was based on interpretation of 1,086.6 kilometers of 2D seismic data acquired by CEPSA Kenya Limited (a wholly owned affiliate of Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U.\u00a0 CEPSA (the operating partner) and ERHC on the Block with the exploration team considering the Tarach prospect as the most robust mapped prospect.<\/p>\n<p>The mean estimate of oil prospective unrisked resources for the prospect is 65 million barrels with the mean unrisked prospective resources of all prospects and leads in Block 11A totals 645 million barrels.<\/p>\n<p>The two partners had earier said that contingent upon the results of Tarach-1, they might decide to drill a second exploratory well, the Egole-1 a four-way rollover closure onto a Northwest \u2013 Southeast trending fault plain with mean prospective resources of 101 million barrels of oil, to follow shortly thereafter.<\/p>\n<p>ERHC holds a 35 percent interest in Block 11A while CEPSA has a 55 percent interest.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kenya\u2019s Block 11A joint venture partner ERHC says the contracting parties plan to spud the first well at the Tarach-1 prospect by the end of the first quarter of 2016 &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/erhc-still-hopeful-first-well-kenyas-block-11a-march-2016\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":1455,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1],"tags":[261,431,433,495,796,1445,3621],"class_list":["post-3829","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-block-11a","tag-cepsa","tag-cepsa-kenya-limited","tag-compania-espanola-de-petroleos-cepsa","tag-erhc","tag-lokichar-basin","tag-tarachi-prospect","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-ZL","jetpack-related-posts":[{"id":2846,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-identify-drilling-location-kenyas-block-11a\/","url_meta":{"origin":3829,"position":0},"title":"CEPSA, ERHC identify drilling location in Kenya\u2019s Block 11A","author":"","date":"April 23, 2015","format":false,"excerpt":"Spanish exploration company CEPSA and Houston based explorer ERHC have said that its exploration team has identified the Tarach-1 prospect as the drilling location for the first exploration well set to be drilled in March 2016 in an announcement by ERHC. This decision was based on interpretation of 1,086.6 kilometers\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4578,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-commence-drilling-at-tarach-1-prospect-in-kenyas-block-11a\/","url_meta":{"origin":3829,"position":1},"title":"CEPSA, ERHC Commence Drilling At Tarach-1 Prospect in Kenya\u2019s Block 11A","author":"","date":"April 15, 2016","format":false,"excerpt":"The SMP drilling rig has spud at the wildcat Tarach-1 drilling prospect (situated in the central part of the Tarach basin) with the well expected to take 60 days to complete. The drilling which started at 6pm on Thursday in the north western most block in Kenya targets to drill\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4360,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tarach-1-well-in-kenyas-block-11a-drilling-date-on-schedule-as-rig-mobilization-commences\/","url_meta":{"origin":3829,"position":2},"title":"Tarach 1 well in Kenya\u2019s Block 11A Drilling Date on schedule as Rig Mobilization Commences","author":"","date":"February 17, 2016","format":false,"excerpt":"The drilling rig for the Tarach 1 well in Block 11A has being mobilized to the drill site where concreting work and installation of conductors have already been completed as the JV partners Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U.\u00a0 (CEPSA) operator* and ERHC work relentlessly toward a spud date near the\u2026","rel":"","context":"In \"Block 11A\"","block_context":{"text":"Block 11A","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/block-11a\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2013,"url":"https:\/\/www.oilnewskenya.com\/index.php\/erhc-energy-confirms-leads-in-kenya-block-11a\/","url_meta":{"origin":3829,"position":3},"title":"ERHC Energy Confirms Leads in Kenya Block 11A","author":"Samuel Kamau Mbote","date":"November 6, 2014","format":false,"excerpt":"ERHC has announced that ongoing interpretation of 2D seismic data on Kenya Block 11A reveals the presence of several viable leads, some with closures of up to 20 square kilometers. \"The possibility of existence of stacked reservoirs, as seen in the Lokichar basin, could be a significant factor in computation\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2106,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-in-kenyas-block-11a-to-begin-within-12-16-months\/","url_meta":{"origin":3829,"position":4},"title":"Drilling in Kenya\u2019s Block 11A to begin within 12-16 months","author":"Samuel Kamau Mbote","date":"December 2, 2014","format":false,"excerpt":"Block 11A partner Houston based ERHC has announced that together with the block operator CEPSA Kenya Limited (a wholly owned affiliate of Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U. (CEPSA) it plans to start drilling in Northern Kenya in Q4 2015 earliest having completed a 2D seismic survey and a full tensor\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4147,"url":"https:\/\/www.oilnewskenya.com\/index.php\/logistic-operations-begin-at-the-tarach-1-well-in-kenya-block-11a\/","url_meta":{"origin":3829,"position":5},"title":"Logistics Operations begin at the Tarach-1 well in Kenya Block 11A","author":"","date":"December 1, 2015","format":false,"excerpt":"Work towards the Tarach-1 well expected to spud at the end of the first quarter of 2016 has begun with the operating partner CEPSA having awarded drilling service contracts following the requisite tenders and logistics operations toward drilling have begun. In the meantime Block 11A venture partner has reported increased\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/12\/block-11A.jpg?fit=234%2C215&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=3829"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3829\/revisions"}],"predecessor-version":[{"id":3830,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3829\/revisions\/3830"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1455"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=3829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=3829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=3829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}