{"id":3165,"date":"2015-07-20T08:29:36","date_gmt":"2015-07-20T08:29:36","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=3165"},"modified":"2015-07-20T09:00:56","modified_gmt":"2015-07-20T09:00:56","slug":"ramboll-carry-onshore-pipeline-study-uganda","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/ramboll-carry-onshore-pipeline-study-uganda\/","title":{"rendered":"Ramboll To Carry-out Onshore Pipeline Study In Uganda"},"content":{"rendered":"<p>Uganda\u2019s Ministry of Energy and Mineral Development has awarded United Kingdom&#8217;s Ramboll a contract to conduct an early-phase study for the \u201cHoima\u2013Kampala Refined Petroleum Products Pipeline\u201d in Uganda, East Africa.<\/p>\n<p>The project concerns a proposed pipeline to be constructed to transport products of crude oil refinement from Uganda Oil <a href=\"http:\/\/ow.ly\/POTZA%20\">Refinery<\/a> in Hoima to a distribution terminal to be constructed in Buloba, app. 17 km west of Kampala with the total length of the pipeline\/corridor is app. 210 km.<\/p>\n<p>The Hoima-Kampala pipeline is to be developed as part of a refinery project supporting the establishment of a domestic oil and gas industry in Uganda.<\/p>\n<p>Ramboll\u2019s main scope of work is to carry out:<\/p>\n<ul>\n<li>A utility corridor study including detailed pipeline routing<\/li>\n<li>An environmental baseline study (EBS)<\/li>\n<\/ul>\n<p>The utility corridor of about 110 m wide is required for construction of vital infrastructure comprising refined petroleum products pipeline, Information and Communication Technology (ICT) cables, a dual-carriage highway, and power transmission lines between Hoima and Kampala.<\/p>\n<p>Ramboll is thus required to study and advise on how the planned infrastructure and auxiliary utilities will share the common corridor without compromising the safety, reliability, and integrity of each infrastructure. The pipeline routing will include challenging river and swamp crossings.<\/p>\n<p>Ramboll teamed up with local partner Newplan to win the project. Newplan is also sub-consultant to Ramboll on the greenfield project \u2018Kabaale International Airport\u2019 in the Hoima District, which is a new airport intended to service the oil industry and local communities in Western Uganda.<\/p>\n<p>Newplan is performing most of the field work for the Hoima\u2013Kampala pipeline such as topographical survey, geological and geotechnical investigations, EBS and ESIA (Environmental and Social Impact Assessment)<\/p>\n<p>S\u00f8ren Skovg\u00e5rd M\u00f8ller, Director of Engineering and Onshore Gas &amp; LNG, in Ramboll Oil &amp; Gas, envisions good opportunities for other projects in East Africa including in Rwanda and Burundi.<\/p>\n<p>\u201cWe are using the two ongoing projects in Uganda to actively pursue the East African market for more onshore and offshore projects. We are monitoring the market opportunities in Rwanda, Burundi and Uganda for interesting projects within oil, gas projects as well as industrial master planning,\u201d says M\u00f8ller.<\/p>\n<p>Ramboll adds that it is following the big development projects in Tanzania and Mozambique where its\u2019s multidisciplinary skills set could be of great value to the developers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uganda\u2019s Ministry of Energy and Mineral Development has awarded United Kingdom&#8217;s Ramboll a contract to conduct an early-phase study for the \u201cHoima\u2013Kampala Refined Petroleum Products Pipeline\u201d in Uganda, East Africa. &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/ramboll-carry-onshore-pipeline-study-uganda\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":3168,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[3431,1586,3432,1827,2042,3433,3434,2129,2603],"class_list":["post-3165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-hoima-kampala-pipeline","tag-ministry-of-energy-and-mineral-development","tag-newplan","tag-oil","tag-pipeline","tag-ramboll","tag-ramboll-oil-gas","tag-refinery","tag-uganda","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/ramboll.jpg?fit=2560%2C1440&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-P3","jetpack-related-posts":[{"id":3221,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-uganda-agree-crude-oil-pipeline-route\/","url_meta":{"origin":3165,"position":0},"title":"Kenya, Uganda agree on crude oil pipeline route","author":"","date":"August 9, 2015","format":false,"excerpt":"The governments of Kenya and Uganda have announced that they have agreed on the route to be taken by the crude oil pipeline that will transport oil from the Albertine and Lokichar basins. The announcement comes as Kenya\u2019s president Uhuru Kenyatta continues his visit in Uganda where he has signed\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Crude-Oil-Pipeline-Map.png?fit=456%2C551&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2439,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-begins-evaluations-of-bids-for-hoima-kampala-pipeline\/","url_meta":{"origin":3165,"position":1},"title":"Uganda begins evaluations of bids for Hoima-Kampala pipeline","author":"Samuel Kamau Mbote","date":"January 2, 2015","format":false,"excerpt":"The Ugandan government has announced that it has started evaluating bids from a number of international firms for the construction of the export pipeline from Hoima (refinery site) to Kampala (distribution terminal) stretching over 200 kilometers. The companies will be charged with the responsibility of generating a blueprint for the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/uganda-oil-001.jpg?fit=460%2C276&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5087,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ugandas-petrochemical-industrial-park-master-plan-to-be-complete-by-february-2017\/","url_meta":{"origin":3165,"position":2},"title":"Uganda\u2019s Petrochemical Industrial Park Master Plan to be complete by February 2017","author":"","date":"August 28, 2016","format":false,"excerpt":"A master plan for the development of the petrochemical industrial park in Hoima, Uganda is expected to be completed by February 2017 according to the country\u2019s Prime Minister Dr. Ruhakana Rugunda. Speaking at the opening of the 6th joint sector review for the energy and mineral development sector Dr Ruhakana\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":1201,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-refinery-lead-advisor-expected-to-be-known-by-july-2014\/","url_meta":{"origin":3165,"position":3},"title":"Uganda Refinery lead advisor expected to be known by July 2014","author":"Samuel Kamau Mbote","date":"June 11, 2014","format":false,"excerpt":"Uganda has received detailed proposals for the role of lead investor for the development of 60,000 barrels per day oil refinery in Hoima. The proposals submitted by four of six shortlisted firms for the project including China Petroleum Pipeline Bureau (CPPB)\u00a0from China, Marubeni Corporation\u00a0from Japan, \u2013 Global Resources\u00a0from Russia and\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":5491,"url":"https:\/\/www.oilnewskenya.com\/index.php\/sbc-presents-proposal-for-new-airport-near-uganda-oilfields\/","url_meta":{"origin":3165,"position":4},"title":"SBC presents proposal for new airport near Uganda Oilfields","author":"","date":"December 16, 2016","format":false,"excerpt":"SBC - a joint venture between UK company Colas and local company SBI Uganda - has formally presented its proposal for the Kabaale International Airport project to the Ministry of Works and Transport which is expected to offer immediate benefits in facilitating the movement of materials and manpower for the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/12\/uganda-airport-masterplan.jpg?fit=500%2C273&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4745,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-allocates-funds-for-national-petroleum-authority-national-oil-company\/","url_meta":{"origin":3165,"position":5},"title":"Uganda Allocates Funds For National Petroleum Authority &#038; National Oil Company","author":"","date":"June 9, 2016","format":false,"excerpt":"The ministry of finance in Uganda has allocated $56.2 million towards Oil, Gas and Mineral Development and institutional and skills development including operationalizing the National Petroleum Authority and establishment of the National Oil Company in a budget speech read yesterday. The allocation of the funds towards the establishment of the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda.jpg?fit=595%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda.jpg?fit=595%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda.jpg?fit=595%2C400&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=3165"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3165\/revisions"}],"predecessor-version":[{"id":3167,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3165\/revisions\/3167"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/3168"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=3165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=3165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=3165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}