{"id":3091,"date":"2015-06-18T09:52:50","date_gmt":"2015-06-18T09:52:50","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=3091"},"modified":"2015-06-23T09:12:22","modified_gmt":"2015-06-23T09:12:22","slug":"maurel-et-prom-reports-promising-results-mb-4-development-well-tanzania","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-reports-promising-results-mb-4-development-well-tanzania\/","title":{"rendered":"Maurel et Prom reports Promising results of the MB-4 development well in Tanzania"},"content":{"rendered":"<p>Manzi Bay operator Maurel et Prom has announced that the MB-4 development well, drilled 800 m from the MB-2 and MB-3 wells at the Mnazi Bay gas field, has crossed Miocene gas reservoirs with net pay of 24 metres (Upper Mnazi Bay) and 43 metres (Lower Mnazi Bay) respectively, both ranked among the best of the five wells drilled at this field so far.<\/p>\n<p>According to Maurel et Prom pressure measurements have confirmed the lateral and the vertical connectivity of each reservoir with the two reservoirs having been selectively tested at different two-hour stabilised flows, with the following results:<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-3092 aligncenter\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4.png?resize=532%2C115&#038;ssl=1\" alt=\"MB-4\" width=\"532\" height=\"115\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4.png?w=532&amp;ssl=1 532w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4.png?resize=300%2C65&amp;ssl=1 300w\" sizes=\"auto, (max-width: 532px) 100vw, 532px\" \/><\/a><\/p>\n<p>The well will be connected to the production faculties currently being installed at the field, for start-up in the third quarter of 2015. MB-4 well deepening to the Oligocene was interrupted after encountering high-pressure intervals of unknown origin.<\/p>\n<p>Maurel et Prom adds that the well\u2019s results confirm the Group\u2019s ability to produce additional output over and above the initial 80 MMscfd, to deliver 110 to 130 MMscfd and based on these results and on the initial production scheduled for third quarter 2015, the next assessment of reserves at the Mnazi Bay field should confirm the previously accepted gas volumes.<\/p>\n<p>The MB-4 development well spud in <a href=\"http:\/\/ow.ly\/OtxPv%20\">March<\/a> and is ongoing with drilling operations expected to be completed in 90 days.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Manzi Bay operator Maurel et Prom has announced that the MB-4 development well, drilled 800 m from the MB-2 and MB-3 wells at the Mnazi Bay gas field, has crossed &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-reports-promising-results-mb-4-development-well-tanzania\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":3100,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[1534,3058,1608,2974,2466,2719],"class_list":["post-3091","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-maurel-et-prom","tag-mb-4-development-well","tag-mnazi-bay","tag-mnazi-bay-field","tag-tanzania","tag-wentworth-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4-well-Tanzania-photo.png?fit=435%2C329&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-NR","jetpack-related-posts":[{"id":4412,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-mnazi-bay-reserves-up-20-in-new-evaluation\/","url_meta":{"origin":3091,"position":0},"title":"Tanzania\u2019s Mnazi Bay Reserves Up 20% in New Evaluation","author":"","date":"February 29, 2016","format":false,"excerpt":"A new independent RPS Energy Canada Ltd. Calgary, Canada on behalf of Maurel et Prom (Operator) and Wentworth Resources has increased the (2P) reserves increased by 20%. According to JV partner Wentworth Resources the results follow favourable data from the MB-4 well drilled during 2015 and which was drilled to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/01\/Mnazi-Bay-Concession.png?fit=448%2C554&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1656,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-on-tanzanias-mnazi-bay-concession-set-to-be-complete-in-q3\/","url_meta":{"origin":3091,"position":1},"title":"2D seismic on Tanzania\u2019s Mnazi Bay Concession set to be complete in Q3","author":"Samuel Kamau Mbote","date":"August 21, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] The acquisition of 315km of conventional 2D onshore seismic data over the prospective areas of the Mnazi Bay Concession Tanzania is on program and is expected to be completed in Q3 according to Wentworth resources in its latest financial statements. The acquisition of the 2D onshore seismic data\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/mnazi-bay.png?fit=315%2C417&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2939,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-ongoing-mb-4-development-well-mnazi-bay-block-tanzania\/","url_meta":{"origin":3091,"position":2},"title":"Drilling ongoing at MB-4 Development Well in Mnazi Bay Block Tanzania","author":"","date":"May 19, 2015","format":false,"excerpt":"Wentworth Resources has reported that the MB-4 development well that spud in March is ongoing with drilling operations expected to be completed in June or in 90 days as announced during the last update. The well which is expected to initially produce 20mmscf\/day (gross) is expected to be ready to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Wentworth-Resources.png?fit=375%2C286&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3263,"url":"https:\/\/www.oilnewskenya.com\/index.php\/first-gas-delivery-new-transnational-pipeline-commence-tanzania\/","url_meta":{"origin":3091,"position":3},"title":"First gas delivery to the new transnational pipeline commence in Tanzania","author":"","date":"August 21, 2015","format":false,"excerpt":"Wentworth Resources has announced that gas deliveries have now commenced to the new transnational pipeline from the the Mnazi Bay joint venture in Tanzania. Currently two wells are now producing and the remaining three wells will be put on production in the coming months according to the company. \"We are\u2026","rel":"","context":"In &quot;Profile&quot;","block_context":{"text":"Profile","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/profile\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2772,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mtwara-dar-es-salaam-pipeline-now-complete-first-gas-delivery-expected-july-2015\/","url_meta":{"origin":3091,"position":4},"title":"Mtwara to Dar es Salaam pipeline now complete, first gas delivery expected in July 2015","author":"","date":"March 31, 2015","format":false,"excerpt":"East Africa-focused oil & gas company has announced that the construction of the Government owned and operated Mtwara to Dar es Salaam pipeline is now 100% complete and the two associated processing facilities are approximately 96% complete. Wentworth Resources today provides an operational update in the lead up to the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentwirth-logo.png?fit=376%2C285&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7611,"url":"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-to-carry-out-maintenance-in-mnazi-bay-to-accommodate-future-demand\/","url_meta":{"origin":3091,"position":5},"title":"Maurel et Prom to Carry Out Maintenance in Mnazi Bay to Accommodate Future Demand","author":"","date":"March 8, 2019","format":false,"excerpt":"Maurel et Prom has scheduled a slick line campaign towards the end of March 2019 which will include opening the sliding-sleeves of various well completions and acquiring static pressures in the Lower MB sand interval. The campaign involves opening sliding sleeves, which shut off or open flow from one or\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/mnazi-bay-pipeline.png?fit=437%2C531&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3091","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=3091"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3091\/revisions"}],"predecessor-version":[{"id":3094,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/3091\/revisions\/3094"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/3100"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=3091"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=3091"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=3091"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}