{"id":2902,"date":"2015-05-11T13:57:31","date_gmt":"2015-05-11T13:57:31","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=2902"},"modified":"2015-05-18T16:12:44","modified_gmt":"2015-05-18T16:12:44","slug":"uganda-use-international-events-promote-new-licensing-round","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-use-international-events-promote-new-licensing-round\/","title":{"rendered":"Uganda to use international events to promote its First Licensing Round for Petroleum Exploration"},"content":{"rendered":"<p>The Ministry of Energy and Mineral Development has said it will be holding promotional Events for Uganda\u2019s First Licensing Round for Petroleum Exploration, 2015.<\/p>\n<p><a href=\"http:\/\/www.petroleum.go.ug\/news\/29\/Promotional-Events-for-Ugandas-First-Licensing-Round-for-Petroleum-Exploration-2015\">\u00a0<\/a>Potential investors will receive presentations and an exhibition on the licensing round for petroleum exploration at the following International events;<\/p>\n<p>1.The 12th\u00a0\u00a0Africa Independents Forum 2015; 26th\u00a0to 27th\u00a0May, 2015;\u00a0Adelphi Suites, The Waldorf Hilton, London United Kingdom<\/p>\n<p>2.American Association of Petroleum Geologists (AAPG) Annual Convention and Exhibition, 2015; 31st\u00a0May to 3rd\u00a0June, 2015, International Convention Center, Denver, Colorado, USA.<\/p>\n<p>3.Global Petroleum Show 2015; 9th\u00a0to 11th\u00a0June, 2015;\u00a0Stampede Park &#8211; Big 4 Building;\u00a0Calgary, Alberta, Canada<\/p>\n<p>Uganda\u2019s first open competitive licensing round for petroleum exploration will cover six blocks in the Albertine Graben which is a proven prospective sedimentary basin including: Ngassa (410 Km2) in Hoima District, Taitai &amp; Karuka (565 Km2) in Buliisa District, Ngaji (895 Km2), Rukungiri &amp; Kanungu Districts, Mvule (344 Km2) in Moyo and Yumbe Districts together with Turaco (425 Km2)\u00a0 and Kanywantaba (344 Km2) in Ntoroko District.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2905\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?resize=446%2C628&#038;ssl=1\" alt=\"Uganda oil blocks\" width=\"446\" height=\"628\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?w=446&amp;ssl=1 446w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?resize=213%2C300&amp;ssl=1 213w\" sizes=\"auto, (max-width: 446px) 100vw, 446px\" \/><\/a><\/p>\n<p>These blocks have both seismic and well data which were acquired by oil companies previously licensed in these areas. Stratigraphic Licensing will be applicable to some of these blocks.<\/p>\n<p>Uganda has already undertaken resource and risk assessment of the areas proposed for licensing, developed a data room and is now making available data packages to prospective investors in preparation for this licensing round.<\/p>\n<p>Uganda\u2019s first licensing round is guided by the National Oil and Gas Policy for Uganda (2008) and the Petroleum (Exploration, Development and Production) Act 2013.\u00a0 The announcement follows approval of Cabinet and submission of a report on the Licensing round to Parliament.<\/p>\n<p>The Ministry invites all interested firms to visit its exhibition booth during these events to get more information on Uganda\u2019s First Licensing Round for Petroleum Exploration and other investment opportunities in Uganda\u2019s emerging oil and\u00a0gas sector.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Energy and Mineral Development has said it will be holding promotional Events for Uganda\u2019s First Licensing Round for Petroleum Exploration, 2015. \u00a0Potential investors will receive presentations and &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/uganda-use-international-events-promote-new-licensing-round\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":97,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[3184,24,118,3185,364,3186,1084,1239,3193,3191,3190,3188,3187,3194,1855,3189,3195,2603,3192],"class_list":["post-2902","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-12th-africa-independents-forum-2015","tag-24","tag-albertine-region","tag-american-association-of-petroleum-geologists-aapg-annual-convention-and-exhibition","tag-buliisa","tag-global-petroleum-show-2015","tag-hoima","tag-kanungu","tag-kanywantaba","tag-moyo","tag-mvule","tag-ngaji","tag-ngassa","tag-ntoroko","tag-oil-blocks","tag-rukungiri","tag-turaco","tag-uganda","tag-yumbe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/uganda-oil.jpg?fit=447%2C192&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-KO","jetpack-related-posts":[{"id":3005,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-extends-deadline-submission-applications-qualification-first-petroleum-licensing-round\/","url_meta":{"origin":2902,"position":0},"title":"Uganda Extends Deadline for Submission of Applications for Qualification for First Petroleum Licensing Round","author":"","date":"May 21, 2015","format":false,"excerpt":"The ministry of energy and mineral development has announced that it extended the closing date for receipt of applications for qualification has been extended by a month from 29th May to 30th June 2015. In the announcement by permanent secretary Kabagambe-Kaliisa the extension will to allow interested applicants more time\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Uganda oil blocks","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3041,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-hold-london-road-show-promote-first-licensing-round\/","url_meta":{"origin":2902,"position":1},"title":"Uganda to Hold London Road Show to Promote First licensing Round","author":"","date":"June 2, 2015","format":false,"excerpt":"The Minister for Energy and Mineral Development Hon. Eng. Irene Muloni has said Uganda will be holding a licensing round road show which will be held at the Montcalm Shoreditch London Tech City Hotel on 17th June 2015. The road show is to promote the first competitive bidding round which\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/events\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/kingfisher-uganda.jpg?fit=451%2C413&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3125,"url":"https:\/\/www.oilnewskenya.com\/index.php\/17-companies-shortlisted-ugandas-first-licensing-round-petroleum-exploration-development-production\/","url_meta":{"origin":2902,"position":2},"title":"17 companies shortlisted for Uganda&#8217;s First Licensing Round for Petroleum Exploration, Development and Production","author":"","date":"July 2, 2015","format":false,"excerpt":"Following the end of a deadline for the Process of receiving the Request for Qualification ended on 30th June, 2015 the Ministry has said it has registered\u00a0seventeen valid applicants\u00a0out of the nineteen applicants\u00a0that had registered for licenses in six blocks in the Albertine Basin. The six blocks on offer are;\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Uganda oil blocks","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3892,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-issues-bid-documents-to-16-companies-under-the-first-licensing-round\/","url_meta":{"origin":2902,"position":3},"title":"Uganda issues bid documents to 16 companies under the First licensing round","author":"","date":"October 8, 2015","format":false,"excerpt":"The Government of Uganda (GOU) through the Ministry of Energy and Mineral Development has issued the bidding document to the 16 Qualified Applicants which were successful following the evaluation of applications from 19 companies that had applied in the Request for Qualification stage. The bidding document comprise of Request for\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/08\/oil-discoveries-Uganda.png?fit=436%2C614&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3228,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-government-shortlists-16-firms-first-petroleum-licensing-round\/","url_meta":{"origin":2902,"position":4},"title":"Uganda Government Shortlists 16 firms in First Petroleum Licensing Round","author":"","date":"August 11, 2015","format":false,"excerpt":"The government of Uganda has announced that it has concluded the evaluation of Applications for Qualification from the 17 firms that submitted the Applications following a successful First Licensing Round for Petroleum Exploration, Development and Production. According to Permanent Secretary of the Ministry of Energy & Mineral Development Dr. F.A\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/08\/uganda-with-flag.jpg?fit=400%2C400&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13137,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-unoc-granted-exploration-license-for-kasuruban-block\/","url_meta":{"origin":2902,"position":5},"title":"UGANDA: UNOC, DGR Energy Granted Exploration License for Kasuruban, Turaco Blocks","author":"","date":"January 12, 2023","format":false,"excerpt":"Uganda's Cabinet in its sitting of 9th January 2023 has approved the signing of Production Sharing Agreements (PSAs) and issuance of an Exploration license to UNOC for the Kasuruban block and Turaco block to Australia's DGR Energy LR2_2019_Block03 (Kasuruban) with an area coverage of 1285km2\u00a0 and LR2_2019_Block04 (Turaco); Area coverage\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/05\/2nd-LICENSING-ROUND-OF-UGANDA.jpg?fit=1200%2C615&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/05\/2nd-LICENSING-ROUND-OF-UGANDA.jpg?fit=1200%2C615&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/05\/2nd-LICENSING-ROUND-OF-UGANDA.jpg?fit=1200%2C615&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/05\/2nd-LICENSING-ROUND-OF-UGANDA.jpg?fit=1200%2C615&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/05\/2nd-LICENSING-ROUND-OF-UGANDA.jpg?fit=1200%2C615&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2902","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2902"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2902\/revisions"}],"predecessor-version":[{"id":2907,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2902\/revisions\/2907"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/97"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2902"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2902"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}