{"id":2681,"date":"2015-03-10T18:47:43","date_gmt":"2015-03-10T18:47:43","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=2681"},"modified":"2015-09-07T12:24:39","modified_gmt":"2015-09-07T12:24:39","slug":"call-comments-draft-uganda-standards-oil-gas-upstream-equipment-materials","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/call-comments-draft-uganda-standards-oil-gas-upstream-equipment-materials\/","title":{"rendered":"Call for Comments on Draft Uganda Standards for Oil and Gas Upstream Equipment and Materials"},"content":{"rendered":"<p style=\"text-align: justify;\">Uganda National Bureau of Standards (UNBS) in collaboration with the Ministry of Energy and Mineral Development (MEMD), through the Technical Committee (UNBS\/ TC 16\/ SC2\/WG1) is developing Standards for the oil and gas upstream equipment and materials.<\/p>\n<p style=\"text-align: justify;\">The committee has completed discussions and adopted the following draft standards.<\/p>\n<p>1.\u00a0\u00a0\u00a0 DUS ISO 13085:2014 Petroleum and natural gas industries &#8212; Aluminium alloy pipe for use as tubing for wells<br \/>\n2.\u00a0\u00a0\u00a0 DUS ISO 15546:2011 Petroleum and natural gas industries &#8212; Aluminium alloy drill pipe<br \/>\n3.\u00a0\u00a0\u00a0 DUS ISO 20312:2011 Petroleum and natural gas industries &#8212; Design and operating limits of drill strings with aluminium alloy components<br \/>\n4.\u00a0\u00a0\u00a0 DUS ISO 27627:2014 Petroleum and natural gas industries &#8212; Aluminium alloy drill pipe thread connection gauging<br \/>\n5.\u00a0\u00a0\u00a0 DUS ISO 10424-1:2004, Petroleum and natural gas industries \u2014 Rotary drilling equipment \u2014 Part 1: Rotary drill stem elements<br \/>\n6.\u00a0\u00a0\u00a0 DUS ISO 10424-2:2007Petroleum and natural gas industries &#8212; Rotary drilling equipment &#8212; Part 2: Threading and gauging of rotary shouldered thread connections<br \/>\n7.\u00a0\u00a0\u00a0 DUS ISO 10405:2000 Petroleum and natural gas industries &#8212; Care and use of casing and tubing<br \/>\n8.\u00a0\u00a0\u00a0 DUS ISO 13678:2010 Petroleum and natural gas industries &#8212; Evaluation and testing of thread compounds for use with casing, tubing, line pipe and drill stem elements<br \/>\n9.\u00a0\u00a0\u00a0 DUS ISO 15463:2003 Petroleum and natural gas industries &#8212; Field inspection of new casing, tubing and plain-end drill pipe<br \/>\n10.\u00a0\u00a0\u00a0 DUS ISO 13679:2002 Petroleum and natural gas industries &#8212; Procedures for testing casing and tubing connections<br \/>\n11.\u00a0\u00a0\u00a0 DU ISO 16070:2005 Petroleum and natural gas industries &#8212; Downhole equipment &#8212; Lock mandrels and landing nipples<br \/>\n12.\u00a0\u00a0\u00a0 DUS ISO 17078-4:2010 Petroleum and natural gas industries &#8212; Drilling and production equipment &#8212; Part 4: Practices for side-pocket mandrels and related equipment<\/p>\n<p>The draft standards are International Standards (ISO) being proposed for adoption as Uganda Standards. They are now being presented to the general public to provide comments on their suitability for implementation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uganda National Bureau of Standards (UNBS) in collaboration with the Ministry of Energy and Mineral Development (MEMD), through the Technical Committee (UNBS\/ TC 16\/ SC2\/WG1) is developing Standards for the &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/call-comments-draft-uganda-standards-oil-gas-upstream-equipment-materials\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":805,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1],"tags":[2939,623,637,955,1586,1827,2943,2941,2938,2942,2940,2606,2650],"class_list":["post-2681","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-casing","tag-downhole-equipment","tag-drilling","tag-gas","tag-ministry-of-energy-and-mineral-development","tag-oil","tag-piping","tag-plain-end-drill-pipe","tag-production-equipment","tag-rotary-drilling-equipment","tag-tubing","tag-uganda-national-bureau-of-standards","tag-upstream","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda1.jpg?fit=340%2C573&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-Hf","jetpack-related-posts":[{"id":3871,"url":"https:\/\/www.oilnewskenya.com\/index.php\/call-for-comments-on-draft-uganda-standards-for-oil-and-gas-upstream-equipment-and-materials-2\/","url_meta":{"origin":2681,"position":0},"title":"Call for Comments on Draft Uganda Standards for Oil and Gas Upstream Equipment and Materials","author":"","date":"October 4, 2015","format":false,"excerpt":"Uganda National Bureau of Standards (UNBS) in collaboration with the Ministry of Energy and Mineral Development (MEMO), through the Technical Committee (UNBS\/ TC 16\/ SC2) is developing Standards for the oil and gas upstream equipment and materials. The committee has completed discussions and adopted the following draft standards. DUS ISO\u2026","rel":"","context":"In \"drilling fluids\"","block_context":{"text":"drilling fluids","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/drilling-fluids\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/01\/uganda_3.jpg?fit=280%2C260&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1654,"url":"https:\/\/www.oilnewskenya.com\/index.php\/call-for-comments-on-draft-uganda-standards-for-oil-and-gas-upstream-equipment-and-materials\/","url_meta":{"origin":2681,"position":1},"title":"Call for Comments on Draft Uganda Standards for Oil and Gas Upstream Equipment and Materials","author":"Samuel Kamau Mbote","date":"August 21, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Courtesy:\u00a0petroleum.go.ug Uganda National Bureau of Standards (UNBS) in collaboration with the Ministry of Energy and Mineral Development (MEMD), through the Technical Committee (UNBS\/ TC 16\/ SC2\/WG1) on Drilling, Development and Production equipments and materials, is developing Standards for the oil and gas sector. The committee has completed discussions\u2026","rel":"","context":"In &quot;News by others&quot;","block_context":{"text":"News by others","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/news-by-others\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/uganda-oil.jpg?fit=460%2C276&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":8857,"url":"https:\/\/www.oilnewskenya.com\/index.php\/deepsea-stavanger-drilling-arrives-in-cape-town\/","url_meta":{"origin":2681,"position":2},"title":"DeepSea Stavanger Drilling Arrives in Cape Town","author":"","date":"August 14, 2020","format":false,"excerpt":"Mineral Resources and Energy Minister Gwede Mantashe has welcomed the arrival of the oil and gas drill rig - DeepSea Stavanger in Cape Town. The rig has been commissioned by petroleum giant Total and its partners to drill the Luiperd prospect in Block 11B\/12B off the Mossel Bay coast, Western\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/Deepsea-Stavanger.jpg?fit=700%2C525&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/Deepsea-Stavanger.jpg?fit=700%2C525&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/Deepsea-Stavanger.jpg?fit=700%2C525&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/Deepsea-Stavanger.jpg?fit=700%2C525&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2922,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-oil-gas-upstream-sector-fact-file-shortened\/","url_meta":{"origin":2681,"position":3},"title":"Kenya Oil and Gas (upstream) sector fact file &#8211; shortened","author":"","date":"May 15, 2015","format":false,"excerpt":"Source: Ministry of Energy and Petroleum 1950-1992: \u00a030 wells drilled by international oil companies in Kenya\u2019s sedimentary basins. Two more wells drilled in the period stretching to 2010. None of them was a discovery. Basically 1992 to 2005 was a dormant period that saw zero wells drilled. 2012: Ngamia 1\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/human-rights.jpg?fit=668%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/human-rights.jpg?fit=668%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/human-rights.jpg?fit=668%2C444&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3210,"url":"https:\/\/www.oilnewskenya.com\/index.php\/preview-ugandas-oil-gas-sector\/","url_meta":{"origin":2681,"position":4},"title":"Preview into Uganda\u2019s Oil and Gas Sector","author":"","date":"August 5, 2015","format":false,"excerpt":"Uganda\u2019s oil and gas sector has since the discovery of oil in 2006 transitioned from the exploration and appraisal phase to the development phase as the country prepares for sustainable production of the petroleum resources. A number of oil companies are currently licensed in the country to undertake petroleum exploration,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/uganda-oil-001.jpg?fit=460%2C276&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6007,"url":"https:\/\/www.oilnewskenya.com\/index.php\/new-entrant-zu-lais-a-one-stop-shop-kenyas-upstream-sector\/","url_meta":{"origin":2681,"position":5},"title":"SPONSORED: New Entrant Zu-Lais A One Stop Shop for Kenya\u2019s Upstream Sector","author":"","date":"May 25, 2017","format":false,"excerpt":"Zu-Lais Oil & Gas Logistics and Consultancy Co. Ltd (Zu-Lais) was founded as a one stop for companies in the exploration & production environment in Oil & Gas, Renewable Energy and Mining Industries offering a wide range of services ranging from logistics, advisory, oilfield services as well as arbitration and\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Zu-Lais.png?fit=693%2C302&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Zu-Lais.png?fit=693%2C302&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Zu-Lais.png?fit=693%2C302&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2681","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2681"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2681\/revisions"}],"predecessor-version":[{"id":3523,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2681\/revisions\/3523"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/805"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2681"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2681"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2681"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}