{"id":2635,"date":"2015-02-26T13:33:06","date_gmt":"2015-02-26T13:33:06","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=2635"},"modified":"2015-05-20T12:45:26","modified_gmt":"2015-05-20T12:45:26","slug":"orca-considering-first-phase-offshore-development-tanzania","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/orca-considering-first-phase-offshore-development-tanzania\/","title":{"rendered":"Orca considering first phase of offshore development in Tanzania"},"content":{"rendered":"<p>Orca exploration has said it is contemplating a first phase of offshore development consisting of working over two existing wells (SS-5 and SS-9) that are currently suspended in order to fill the existing Songas infrastructure to capacity and provide operational redundancy.<\/p>\n<p>This follows under-utilization of the existing infrastructure with the Songo Songo field currently producing approx. 91 million standard cubic feet per day (&#8216;MMcfd&#8217;), which is less than the existing Songas infrastructure capacity of approx. 102 MMcfd.<\/p>\n<p>The works that will involve working over an existing production well (SS-7) and drilling a new offshore development well SS-12 will use the existing infrastructure (platform and flow-lines).<\/p>\n<p>Orca adds that should the work-overs be deemed unfeasible or prove to be unsuccessful during the work-over operation, it is expected that the wells will be either side-tracked or abandoned and new wells drilled to replace the old wells.<\/p>\n<p>The Company estimates the cost of the first phase of Songo Songo field development to be approx. US$120 million. Additional drilling resulting from unsuccessful workovers could cost from US$20 million to US$40 million depending on whether one or two new wellbores are required.<\/p>\n<p>The development programme also includes the installation of a refrigeration unit at the Songo Songo Processing plant expected to occur from Q3 2015 to Q1 2016.<\/p>\n<p>Additional productive capacity would be available to supply some volumes to the National Natural Gas Infrastructure Project &#8216;NNGIP&#8217; if as and when the Company concludes a gas sales agreement with TPDC.<\/p>\n<p>This first phase of Songo Songo development is not dependent upon concluding a gas sales agreement with TPDC, and additional gas volumes could be sold through the existing Songas infrastructure to industrial and\/or power markets.<\/p>\n<p>The NNGIP pipeline is approx. 98% completed and associated plants and facilities are approximately 83% complete, with commissioning expected by the end of Q2 2015.<\/p>\n<p>Given the new scope of the project Orca adds that the IFC is in the process of receiving its internal approvals to provide approximately half the capital cost, or US$60 million, in quasi-equity financing to Orca&#8217;s operating subsidiary, PanAfrican Energy Tanzania Limited.<\/p>\n<p>Orca Exploration has also announced that it signed a non-binding letter of intent with a drilling company regarding the mobilisation of a jack-up rig which would be capable of undertaking the development programme. The Company has no current commitments with respect to the development programme or the financing thereof.<\/p>\n<p>Orca estimates that the total recoverable Mid Case reserves (Protected Gas and Additional Gas) from the Songo Songo Field and the Songo Songo North discovery is 1,079 Bcf at 31 December 2011.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Orca exploration has said it is contemplating a first phase of offshore development consisting of working over two existing wells (SS-5 and SS-9) that are currently suspended in order to &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/orca-considering-first-phase-offshore-development-tanzania\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":2636,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[1696,1931,2884,2883,2365,2466],"class_list":["post-2635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-natural-gas","tag-orca-exploration-group","tag-panafrican-energy-tanzania-limited","tag-songas","tag-songo-songo","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/Songo-Songo-Orca-exploration.png?fit=302%2C417&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-Gv","jetpack-related-posts":[{"id":4386,"url":"https:\/\/www.oilnewskenya.com\/index.php\/orca-exploration-completes-offshore-workover-drilling-program-phase-at-songo-songo\/","url_meta":{"origin":2635,"position":0},"title":"Orca Exploration completes offshore workover &#038; drilling program phase at Songo Songo","author":"","date":"February 22, 2016","format":false,"excerpt":"Orca Exploration Group Inc announces the successful completion of its offshore workover and drilling program and the release of the Paragon M826 mobile drilling workover rig from the Songo Songo Main Field. The Off-Shore Programme of the Songo Songo Main Field development programme included workovers on three existing wells (SS-5,\u2026","rel":"","context":"In \"Dar es Salaam\"","block_context":{"text":"Dar es Salaam","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/dar-es-salaam\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/orca-exploration.gif?fit=400%2C553&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3966,"url":"https:\/\/www.oilnewskenya.com\/index.php\/orca-exploration-closes-60-million-financing-for-tanzanias-songo-songo-development-from-ifc\/","url_meta":{"origin":2635,"position":1},"title":"Orca Exploration Closes $60 million financing for Tanzania\u2019s Songo Songo development from IFC","author":"","date":"October 30, 2015","format":false,"excerpt":"Orca Exploration has announced that it has entered into a loan agreement with International Finance Corporation (IFC), a member of the World Bank Group, for a US$60 million investment in the Company's operating subsidiary, PanAfrican Energy Tanzania Limited (PAET). According to Orca Exploration the proceeds of the Loan will be\u2026","rel":"","context":"In \"International Finance Corporation\"","block_context":{"text":"International Finance Corporation","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/international-finance-corporation\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/09\/Paragon-Offshore-jack-up-rig-M826.jpg?fit=356%2C213&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6201,"url":"https:\/\/www.oilnewskenya.com\/index.php\/orca-exploration-receives-government-approval-additional-gas-plan-2-songo-songo-field\/","url_meta":{"origin":2635,"position":2},"title":"Orca Exploration Receives Government approval of Additional Gas Plan 2 from the Songo Songo Field","author":"","date":"July 29, 2017","format":false,"excerpt":"Orca Exploration Group has announced the approval of the Second Additional Gas Plan (AGP-2) by the Government of Tanzania, more than doubling the available volume of Additional Gas for sale from the Songo Songo Field. Under the Production Sharing Agreement for the Songo Songo gas field, production is identified as\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/08\/PanAfrican-Energy-Tanzania-Ltd-East-Africa-.jpg?fit=645%2C331&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/08\/PanAfrican-Energy-Tanzania-Ltd-East-Africa-.jpg?fit=645%2C331&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/08\/PanAfrican-Energy-Tanzania-Ltd-East-Africa-.jpg?fit=645%2C331&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":8815,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-orca-energy-provides-operational-update\/","url_meta":{"origin":2635,"position":3},"title":"TANZANIA: Orca Energy Provides Operational Update","author":"","date":"August 11, 2020","format":false,"excerpt":"Orca has reported that on August 3, 2020 signed a contract with China Petroleum and Technology Development Company (CPTDC) for the design, supply, installation and commissioning of natural gas compressors within the Songas gas processing facility on Songo Songo Island. Orca says the compressors will work in harmony with the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/KinyereziI1.jpg?fit=700%2C525&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":7494,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pan-african-energy-supplies-extra-gas-to-tanzania-in-new-short-term-sales-agreement\/","url_meta":{"origin":2635,"position":4},"title":"Pan African Energy Supplies Extra Gas To Tanzania in New Short Term Sales Agreement","author":"","date":"January 14, 2019","format":false,"excerpt":"Orca has announced that shortly before the year ended its Tanzania subsidiary Pan African Energy Tanzania Limited signed a short-term sales agreement with the Tanzania Petroleum Development Corporation (TPDC) and the Tanzania Electric Supply Company (TANESCO) for the immediate supply of gas to TANESCO of up to 35 million standard\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/01\/songosongo.png?fit=401%2C555&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3077,"url":"https:\/\/www.oilnewskenya.com\/index.php\/orca-exploration-receives-60-million-financing-songo-songo-development-programme\/","url_meta":{"origin":2635,"position":5},"title":"Orca Exploration Receives $60 million financing for the Songo Songo development programme","author":"","date":"June 16, 2015","format":false,"excerpt":"Orca Exploration has announced that it is proceeding with the first phase of the Songo Songo development programme following World Bank board approval of the International Finance Corporation financing. Through its operating subsidiary, PanAfrican Energy Tanzania Limited the World Bank board approved an investment of $60 million by IFC currently\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/songo-songo2.png?fit=465%2C546&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2635"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2635\/revisions"}],"predecessor-version":[{"id":2637,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2635\/revisions\/2637"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/2636"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}