{"id":2597,"date":"2015-02-24T10:24:10","date_gmt":"2015-02-24T10:24:10","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=2597"},"modified":"2015-05-20T12:49:58","modified_gmt":"2015-05-20T12:49:58","slug":"mozambiques-kifaru-1-well-plugged-abandoned-disappointment","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/mozambiques-kifaru-1-well-plugged-abandoned-disappointment\/","title":{"rendered":"Mozambique\u2019s Kifaru-1 well plugged and abandoned after disappointment"},"content":{"rendered":"<p>Onshore Rovuma block operator through its joint venture partner Wentworth Resources that it has plugged and abandoned the Kifaru-1 well in Mozambique.<\/p>\n<p>The well that begun drilling in mid January was drilled to a final total depth of 3,100 meters in Eocene age rocks encountering all targeted zones in the Miocene, Oligocene and Eocene formations but failed to find an economic reservoir and as a result the well has been plugged and abandoned.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kifaru-1.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2070 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kifaru-1.png?resize=849%2C426&#038;ssl=1\" alt=\"Kifaru-1\" width=\"849\" height=\"426\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kifaru-1.png?w=849&amp;ssl=1 849w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kifaru-1.png?resize=300%2C151&amp;ssl=1 300w\" sizes=\"auto, (max-width: 849px) 100vw, 849px\" \/><\/a><\/p>\n<p>According to Wentworth Managing Director Geoff Bury the partners will go ahead and evaluate the collected data so as to determine the way forward.<\/p>\n<p>&#8220;Whilst the results from this well did not meet our expectations, we are working with Anadarko and our partners to evaluate all data collected to determine the next steps in the exploration phase of the onshore Rovuma block,&#8221; says Geoff.<\/p>\n<p>Prior to the drilling of Kifaru-1 the partners had experienced tough luck in Mozambique\u2019s <a href=\"http:\/\/ow.ly\/Jz2ex\">Tembo-1<\/a> well which despite delays encountered only 11 meters of natural gas net pay before being also plugged and abandoned.<\/p>\n<p>With the drilling of Kifaru-1 to the final total depth, the consortium led by Anadarko has satisfied all of its drilling obligations under the terms of the Exploration and Production Concession Contract\u00a0for the Onshore Rovuma Block in Northern Mozambique.<\/p>\n<p>Wentworth holds a 13.64% participation interest in exploration operations and an 11.59% participation interest in development and production operations of the Rovuma Onshore Concession in Mozambique. Anadarko Petroleum Corporation is operator while other partners include Maurel et Prom, ENH and PTTEP.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Onshore Rovuma block operator through its joint venture partner Wentworth Resources that it has plugged and abandoned the Kifaru-1 well in Mozambique. The well that begun drilling in mid January &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/mozambiques-kifaru-1-well-plugged-abandoned-disappointment\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":2315,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[147,766,1313,1534,1636,2096,2194,2718,2719],"class_list":["post-2597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-anadarko","tag-enh","tag-kifaru-1","tag-maurel-et-prom","tag-mozambique","tag-pttep","tag-rovuma-onshore-concession","tag-wentworth","tag-wentworth-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-FT","jetpack-related-posts":[{"id":2435,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tembo-1-well-plugged-and-abandoned-after-minimal-success\/","url_meta":{"origin":2597,"position":0},"title":"Tembo 1 well plugged and abandoned after minimal success","author":"Samuel Kamau Mbote","date":"December 29, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] After a number of delays Wentworth Resources has announced that drilling operations of the Tembo-1 well have now completed and with the well having reached to a total depth of 4,553 meters (4,401 meters True Vertical Depth Sub Sea) and reached TD in Jurassic aged sediments with petrophysical\u2026","rel":"","context":"In &quot;New Discoveries&quot;","block_context":{"text":"New Discoveries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/new-discoveries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/tembo-1.png?fit=460%2C327&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2314,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-of-kifaru-1-well-in-mozambique-begins\/","url_meta":{"origin":2597,"position":1},"title":"Drilling of Kifaru-1 well in Mozambique begins","author":"Samuel Kamau Mbote","date":"January 15, 2015","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Wentworth Resources has announced the beginning of drilling operations on the Kifaru-1 exploration well by the Helmerich & Payne rig #243 in the Rovuma Onshore Concession in northern Mozambique. The Kifaru-1 exploration well is targeting Miocene sands, similar to the reservoirs in the Mnazi Bay and Msimbati gas\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4127,"url":"https:\/\/www.oilnewskenya.com\/index.php\/anadarko-maurel-et-prom-pttep-exit-mozambique-rovuma-onshore-concession\/","url_meta":{"origin":2597,"position":2},"title":"Anadarko, Maurel et Prom, PTTEP exit Mozambique Rovuma Onshore Concession","author":"","date":"November 23, 2015","format":false,"excerpt":"Oslo and AIM listed explorer Wentworth Resources is currently holding discussions with state owned Empresa Nacional de Hidrocarbonetos de Mocambique (ENH) to assume operatorship of the Rovuma onshore concession after former operator Anadarko and joint venture partners\u00a0 and Maurel et Prom and PTTEP relinquished their participation interest effective 31 August\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Wentworth-Resources.png?fit=375%2C286&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2069,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tembo-1-well-drilling-yet-to-complete-5-months-later\/","url_meta":{"origin":2597,"position":3},"title":"Tembo-1 well drilling yet to complete 5 months later","author":"Samuel Kamau Mbote","date":"November 19, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] The Tembo-1 well that spud on June 19th is yet to be complete 5 months later according to the latest financial statement by Wentworth Resources despite having been projected to take between 60 and 90 days. According to the statement from the company the frontier exploration well located\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/tembo-1.png?fit=460%2C327&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2715,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-resources-operational-update-east-africa-acreage\/","url_meta":{"origin":2597,"position":4},"title":"Wentworth Resources Operational Update on its East Africa Acreage","author":"","date":"March 17, 2015","format":false,"excerpt":"Wentworth Resources plans the commenced planning for drilling operations of the fifth (MB-4) development well which is expected to spud in March. The well which will complete in 90 days or June is expected to initially produce 20mmscf\/day (gross). Meanwhile the explorer has commenced design and construction of field infrastructure\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentworth-resources.jpg?fit=690%2C340&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentworth-resources.jpg?fit=690%2C340&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentworth-resources.jpg?fit=690%2C340&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":1650,"url":"https:\/\/www.oilnewskenya.com\/index.php\/start-up-and-equipment-challenges-delay-completion-of-tembo-1-well-in-mozambique\/","url_meta":{"origin":2597,"position":5},"title":"Start-up and Equipment challenges delay completion of Tembo-1 well in Mozambique","author":"Samuel Kamau Mbote","date":"August 20, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Wentworth resources has reported a 45 day delay in its drilling operations on the Tembo-1 exploration well in the Rovuma Onshore Concession encountered start-up and equipment challenges. The company says the well which is situated in the Rovuma Onshore Concession in Northern Mozambique commenced operations on June 19,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/tembo-1.png?fit=460%2C327&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2597"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2597\/revisions"}],"predecessor-version":[{"id":2598,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2597\/revisions\/2598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/2315"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}