{"id":2577,"date":"2015-02-19T08:46:29","date_gmt":"2015-02-19T08:46:29","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=2577"},"modified":"2015-05-20T12:54:15","modified_gmt":"2015-05-20T12:54:15","slug":"tanzania-draws-closer-gas-production-kiliwani-north-1-well","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-draws-closer-gas-production-kiliwani-north-1-well\/","title":{"rendered":"Tanzania draws closer to gas production from the Kiliwani North 1 well"},"content":{"rendered":"<p>Aminex has notified shareholders that the Tanzanian Petroleum Development Corporation (TPDC), through its contractors, has now begun constructing the Skid Metering Unit within the boundaries of the Kiliwani North Development Licence (KNDL) and have completed laying pipe to the KNDL boundary.<\/p>\n<p>Once construction is complete the Kiliwani North 1 well (KN-1) will be connected to the new Songo Songo processing plant where the gas, once produced, will be processed prior to being transported and sold in the new Dar es Salaam to Mnazi Bay pipeline.<\/p>\n<p>The KNDL joint venture has been notified by TPDC that pressure testing of the pipeline is expected to commence during the first half of 2015 and the final construction of equipment to connect is expected within this timeframe in order for commissioning to occur.<\/p>\n<p>\u201cAs the Dar es Salaam to Mnazi Bay pipeline nears completion and the final stages of construction are now occurring on the Kiliwani North-1 well, we look forward to first commercial gas production from the field which will place the Company in the position of being the first new Tanzanian gas producer in recent times,\u201d says Aminex CEO, Jay Bhattacherjee.<\/p>\n<p>The board has also said the delays in finalizing the Gas Sales Agreement is largely because of Tanzanian authorities long approval process.<\/p>\n<p>The Board says it expects the GSA to be signed prior to any gas being delivered for pressure testing or commissioning and the Company will accordingly continue to keep the market informed on progress.<\/p>\n<p>The KNDL includes the KN-1 well, which is expected to produce at approximately 20 mmcfd as soon as the well is brought on stream and will represent a major milestone for Aminex by providing first revenues from Tanzania.<\/p>\n<p>Independently verified resources at Kiliwani North are estimated to be 45 billion cubic feet of gas in place.<\/p>\n<p>Aminex is the Operator at Kiliwani North Development License with about 59.5% withholding interest after selling 6.5% interest to Solo Oil with an option to acquire another similar stake once the GSA is signed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aminex has notified shareholders that the Tanzanian Petroleum Development Corporation (TPDC), through its contractors, has now begun constructing the Skid Metering Unit within the boundaries of the Kiliwani North Development &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-draws-closer-gas-production-kiliwani-north-1-well\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":1913,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[137,961,2856,2855,2857,2342,2369,2481,2543],"class_list":["post-2577","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-aminex","tag-gas-sales-agreement","tag-kiliwani-north-1-well","tag-kiliwani-north-development-license","tag-mnazi-bay-pipeline","tag-solo-oil","tag-songo-songo-processing-plant","tag-tanzanian-petroleum-development-corporation","tag-tpdc","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-Fz","jetpack-related-posts":[{"id":3873,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tpdc-to-acquire-5-interest-in-the-kiliwani-north-license\/","url_meta":{"origin":2577,"position":0},"title":"TPDC to acquire 5% interest in the Kiliwani North License","author":"","date":"October 5, 2015","format":false,"excerpt":"Aminex has said that the Tanzania Petroleum Development Corporation (TPDC) has notified the Company of its intention to acquire a 5% working interest in the Kiliwani North Development (KNDL) and will become a full working interest partner going forward. Under the terms of the Nyuni East Songo-Songo Production Sharing Agreement\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4496,"url":"https:\/\/www.oilnewskenya.com\/index.php\/commissioning-of-tanzanias-songo-songo-island-gas-set-for-april-2016\/","url_meta":{"origin":2577,"position":1},"title":"Commissioning of Tanzania\u2019s Songo Songo Island gas plant Set for April 2016","author":"","date":"March 15, 2016","format":false,"excerpt":"The Tanzania Petroleum Development Corporation (TPDC) has provided a revised work schedule in the \u00a0Kiliwani North license and informed the operator Aminex that the commissioning of the Songo Songo Island gas plant is expected to commence in early April. Aminex which concluded the final well integrity testing of the Kiliwani\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kiliwani-north-1-well.png?fit=493%2C556&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2393,"url":"https:\/\/www.oilnewskenya.com\/index.php\/solo-acquires-kiliwani-north-development-licence-in-tanzania\/","url_meta":{"origin":2577,"position":2},"title":"Solo acquires Kiliwani North Development Licence in Tanzania","author":"Samuel Kamau Mbote","date":"February 3, 2015","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Solo has announced it has now signed the Asset Purchase Agreement with Aminex plc for the first 6.5% interest in the Kiliwani North Development Licence (KNDL) at a total consideration of US$3,500,000. The announcement \u00a0follows prior statements in October and December last year where the company said it\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4343,"url":"https:\/\/www.oilnewskenya.com\/index.php\/solo-oil-invests-additional-equity-in-kiliwani-north-tanzania\/","url_meta":{"origin":2577,"position":3},"title":"Solo Oil Invests Additional Equity in Kiliwani North, Tanzania","author":"","date":"February 11, 2016","format":false,"excerpt":"Solo Oil has announced that it has acquired a further interest in the Kiliwani North Development Licence from concession operator Aminex to reach 10% from the current 6.175% interest in the KNDL where the Kiliwani North-1 well is located and will pay Aminex US$2.16 million. The increase in ownership follows\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/solo-oil.jpg?fit=320%2C320&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2037,"url":"https:\/\/www.oilnewskenya.com\/index.php\/solo-oil-provides-update-on-acquisition-of-interest-in-tanzania\/","url_meta":{"origin":2577,"position":4},"title":"Solo Oil provides update on acquisition of interest in Tanzania","author":"Samuel Kamau Mbote","date":"November 12, 2014","format":false,"excerpt":"Solo Oil plc has announced that, further to the announcement of 14 October 2014, it has been advised by Aminex PLC that the conditions precedent which are remaining to close the acquisition of an initial 6.5% of the Tanzania\u2019s Kiliwani North Development Licence (KNDL) are the formal approval from the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kiliwani-north-1-well.png?fit=493%2C556&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3271,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-kiliwani-north-gas-agreement-signed-q3-2015\/","url_meta":{"origin":2577,"position":5},"title":"Tanzania\u2019s Kiliwani North Gas Agreement to be Signed in Q3 2015","author":"","date":"August 26, 2015","format":false,"excerpt":"Production from the Kiliwani North Field could start in 2015 with the Tanzanian authorities having advised that production should start within Q3 2015 now that the main pipeline has been pressure tested and with the Gas Agreement expected to be signed this quarter. The completion of a Gas Sales Agreement\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2577"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2577\/revisions"}],"predecessor-version":[{"id":2578,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2577\/revisions\/2578"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1913"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}