{"id":2382,"date":"2015-02-02T00:01:38","date_gmt":"2015-02-01T23:01:38","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=2382"},"modified":"2015-09-07T12:46:29","modified_gmt":"2015-09-07T12:46:29","slug":"emas-amc-secures-contracts-worth-over-65-million","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/emas-amc-secures-contracts-worth-over-65-million\/","title":{"rendered":"EMAS AMC secures  contracts worth over $65 million"},"content":{"rendered":"<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;]<\/p>\n<p>Leading contractor and provider of integrated offshore solutions to the oil and gas industry Ezra Holdings has announced that the Group\u2019s Subsea Services division, EMAS AMC, has secured multiple contracts from various energy companies valued at more than US$65 million (including options).<\/p>\n<p>Scope of work includes project management, engineering, and transportation and installation works for a floating production storage offloading (FPSO) vessel in Africa, as well as various engineering and offshore construction support contracts.<\/p>\n<p>Work on the various project activities has commenced with offshore execution taking place in 2015 and 2016.<\/p>\n<p>According to Ezra\u2019s Group CEO and Managing Director Lionel Lee following the contracts the company\u2019s tendering activities remain healthy despite the current headwinds faced by the oil and gas industry thanks to its position in the value chain that is more resilient.<\/p>\n<p>\u201cSince the beginning of 2015, the Group has announced contract wins totalling more than US$355 million. I am delighted that we are consistently being recognised for our track record and engineering capabilities across the development and support of offshore oilfields by our clients,\u201d says Lee.<\/p>\n<p>Meanwhile the Group has also announced that it successfully closed the increased loan facility to finance the construction of the Lewek Constellation vessel up to its completion.<\/p>\n<p>The Group has secured a healthy backlog of approximately US$2.5 billion with a majority of the contracts expected to be executed over the next 12 to 18 months.<\/p>\n<p>Lewek Constellation is the Group\u2019s ice-classed, DP3 multi-lay construction vessel with heavy lift capabilities and is on track to turn fully operational by March 2015. Prior to her completion, she has secured a backlog of nearly US$0.5 billion, and is fully committed through to the middle of 2016.<\/p>\n<p>\u201cWe have seen Ezra grow and transform since the early 2000s as a ship charterer to becoming a full-fledged subsea engineering services provider, and we would like to congratulate Ezra on achieving yet another milestone with the Lewek Constellation,\u201d said Ms Joyce Tee, Managing Director, Head of Shipping, Aviation &amp; Transportation, Institutional Banking Group of DBS Bank, the co-lead arranger for the loan facility for the Lewek Constellation.\u201d<\/p>\n<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;] Leading contractor and provider of integrated offshore solutions to the oil and gas industry Ezra Holdings has announced that the Group\u2019s Subsea Services division, EMAS AMC, has secured &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/emas-amc-secures-contracts-worth-over-65-million\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":2383,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[570,624,733,764,863,903,918,1224,1401,1808,2088,2555],"class_list":["post-2382","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-dbs-bank","tag-dp3-multi-lay-construction-vessel","tag-emas-amc","tag-engineering","tag-ezra-holdings","tag-floating-production-storage-offloading-vessel","tag-fpso","tag-joyce-tee","tag-lewek-constellation","tag-offshore-construction-support","tag-project-management","tag-transportation","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/lewek-constellation.jpg?fit=284%2C177&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-Cq","jetpack-related-posts":[{"id":14335,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-saipem-awarded-3-new-contracts-by-totalenergies-block-20-for-the-kaminho-project\/","url_meta":{"origin":2382,"position":0},"title":"ANGOLA: Saipem Awarded 3 New Contracts by TotalEnergies Block 20 for the Kaminho project","author":"","date":"May 29, 2024","format":false,"excerpt":"Saipem has been awarded three new contracts by TotalEnergies EP Angola Block 20, a subsidiary of TotalEnergies, for the Kaminho project relating to the development of Cameia and Golfinho oil fields, located approximately 100 km off the coast of Angola. The overall amount of the contracts is 3.7 billion USD.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":12881,"url":"https:\/\/www.oilnewskenya.com\/index.php\/senegal-sangomar-fpso-construction-phase-completed\/","url_meta":{"origin":2382,"position":1},"title":"SENEGAL: Sangomar FPSO Construction Phase Completed","author":"","date":"November 29, 2022","format":false,"excerpt":"Woodside Energy has passed another important milestone for the Sangomar Field Development Phase 1 with the completion of the construction phase for the floating production storage and offloading (FPSO) facility which will be deployed at the field offshore Senegal. Woodside awarded the contract for supply of the FPSO to MODEC,\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/sangomar-field.jpg?fit=600%2C599&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/sangomar-field.jpg?fit=600%2C599&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/sangomar-field.jpg?fit=600%2C599&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14224,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cote-divoire-dof-group-award-baleine-project-contract\/","url_meta":{"origin":2382,"position":2},"title":"COTE d&#8217;IVOIRE: DOF Group Award Baleine Project Contract","author":"","date":"February 13, 2024","format":false,"excerpt":"DOF has been awarded a contract by Altera Infrastructure to install one FPSO (Floating Production, Storage and Offloading unit) and one FSO (Floating Storage unit) for the phase 2 development of the Baleine field in Cote d'Ivoire, West Africa, operated by Eni with Petroci Holding as partner. The project includes\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/02\/Skandi-Skassen.jpg?fit=557%2C346&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/02\/Skandi-Skassen.jpg?fit=557%2C346&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/02\/Skandi-Skassen.jpg?fit=557%2C346&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":15064,"url":"https:\/\/www.oilnewskenya.com\/index.php\/subsea7-awarded-contract-offshore-west-africa\/","url_meta":{"origin":2382,"position":3},"title":"Subsea7 awarded contract offshore West Africa","author":"","date":"May 22, 2025","format":false,"excerpt":"Subsea7 will be responsible for transporting and installing flexible pipelines, umbilicals, and associated subsea components for the connection of a floating production, storage and offloading (FPSO) vessel as well as the pre-laying activities for an upcoming drilling campaign. Project management and engineering work will begin immediately at Subsea7\u2019s offices in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/Subsea7.jpg?fit=1200%2C515&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/Subsea7.jpg?fit=1200%2C515&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/Subsea7.jpg?fit=1200%2C515&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/Subsea7.jpg?fit=1200%2C515&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/Subsea7.jpg?fit=1200%2C515&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11941,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-energy-provides-update-on-etame-field-reconfiguration-and-fso-deployment\/","url_meta":{"origin":2382,"position":4},"title":"GABON: VAALCO Energy Provides Update on Etame Field Reconfiguration and FSO Deployment","author":"","date":"March 1, 2022","format":false,"excerpt":"VAALCO Energy has provided an update on the Etame field reconfiguration in conjunction with the replacement of the existing Floating Production, Storage and Offloading unit (FPSO) with a Floating Storage and Offloading vessel (FSO) offshore Gabon. VAALCO anticipates that all of the associated engineering, long-lead equipment and significant contracts are\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/10\/GABON-ETAME.jpg?fit=376%2C485&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":15310,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-mcdermott-delivers-first-subsea-project-for-totalenergies-block-17-06\/","url_meta":{"origin":2382,"position":5},"title":"ANGOLA: McDermott Delivers First Subsea Project for TotalEnergies&#8217; Block 17\/06","author":"","date":"October 23, 2025","format":false,"excerpt":"McDermott has announced the safe and successful completion of engineering, procurement, construction, installation, pre-commissioning and commissioning activities for TotalEnergies' Begonia field development. Located in Block 17\/06, approximately 150 kilometers off the coast of\u00a0Angola, Begonia marks McDermott's first subsea project in the country. Awarded in 2022, the project followed the company's\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/10\/North-Ocean-102.jpg?fit=1200%2C554&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/10\/North-Ocean-102.jpg?fit=1200%2C554&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/10\/North-Ocean-102.jpg?fit=1200%2C554&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/10\/North-Ocean-102.jpg?fit=1200%2C554&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/10\/North-Ocean-102.jpg?fit=1200%2C554&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2382"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2382\/revisions"}],"predecessor-version":[{"id":3529,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2382\/revisions\/3529"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/2383"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}