{"id":2345,"date":"2015-01-21T16:26:20","date_gmt":"2015-01-21T15:26:20","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=2345"},"modified":"2015-05-20T13:24:51","modified_gmt":"2015-05-20T13:24:51","slug":"badada-1-well-drilling-update-in-kenyas-block-2b","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-drilling-update-in-kenyas-block-2b\/","title":{"rendered":"Badada-1 Well Drilling Update in Kenya&#8217;s Block 2B"},"content":{"rendered":"<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;]<\/p>\n<p>Taipan Resources through its Kenya-based subsidiary Lion Petroleum has provided the following update on drilling operations for the Badada-1 well, Block-2B, onshore Kenya.<\/p>\n<p>The Badada-1 well <a href=\"http:\/\/ow.ly\/HJjVH%20\">commenced<\/a> drilling operations on 7 January 2015 and has been drilled to a total depth of 918 metres MDBRT (Measured Depth Below the Rotary Table) intersecting a Neogene sequence.<\/p>\n<p>A 20-inch casing has been set at 298 metres MDBRT and the well is currently drilling ahead with the 17 1\/2-inch section to the next casing point.<\/p>\n<p>The plan is to drill the well to a total depth of between 3,000 and 4,000 metres in order to test primary targets in Tertiary age reservoirs. Lion, the operator on Block-2B, expects the well to take up to 70 days to complete.<\/p>\n<p>The Company will provide further operational updates as the Badada-1 well progresses. A comprehensive update will also be provided once operations on the Badada-1 well have been fully completed and analysed.<\/p>\n<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;] Taipan Resources through its Kenya-based subsidiary Lion Petroleum has provided the following update on drilling operations for the Badada-1 well, Block-2B, onshore Kenya. The Badada-1 well commenced drilling &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-drilling-update-in-kenyas-block-2b\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":2308,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[213,274,1045,1059,1418,1917,2071,2458,2541],"class_list":["post-2345","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-badada-1-well","tag-block-2b","tag-greatwall-drilling-rig","tag-gw-190-rig","tag-lion-petroleum","tag-onshore-kenya","tag-premier-oil","tag-taipan-resources","tag-tower-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-BP","jetpack-related-posts":[{"id":2408,"url":"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-drilling-update-in-block-2b-onshore-kenya\/","url_meta":{"origin":2345,"position":0},"title":"Badada-1 Well Drilling Update in Block-2B, onshore Kenya","author":"Samuel Kamau Mbote","date":"February 4, 2015","format":false,"excerpt":"\u00a0 Taipan Resources through its Kenya-based subsidiary Lion Petroleum in its new update drilling operations for the Badada-1 well Block-2B, onshore Kenya have reached to a total depth of 1,647 metres. A 13 3\/8- inch casing has been successfully run to 1,644 metres MDBRT and cemented in the 17 1\/2-inch\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2165,"url":"https:\/\/www.oilnewskenya.com\/index.php\/taipan-resources-awards-drilling-contracts-for-badada-1-well-in-kenyas-block-2b\/","url_meta":{"origin":2345,"position":1},"title":"Taipan Resources awards drilling contracts for Badada-1 well in Kenya\u2019s Block 2B","author":"Samuel Kamau Mbote","date":"December 12, 2014","format":false,"excerpt":"Block operator in Block 2B Taipan Resources has announced that together with other joint-venture partners, have executed a contract with Greatwall for the GW-190 land rig and have also contracted Aberdeen-based Norwell Engineering to manage the drilling operations of the Badada-1 well. The GW-190 land rig recently completed the drilling\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":1891,"url":"https:\/\/www.oilnewskenya.com\/index.php\/greatwall-drilling-company-to-drill-the-badada-prospect-in-kenya-block-2b\/","url_meta":{"origin":2345,"position":2},"title":"Greatwall Drilling Company to drill the Badada Prospect in Kenya Block-2B","author":"Samuel Kamau Mbote","date":"October 9, 2014","format":false,"excerpt":"Taipan Resources Inc. the operator in block 2B has announced the signing of a Letter of Intent with the Greatwall Drilling Company of China to contract the GW-190 land rig for the planned Badada-1 well (where Tower Resources has 15% working interest) onshore Block-2B, Kenya. The Badada-1 well is expected\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2254,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-of-badada-1-well-in-kenyas-block-2b-begins\/","url_meta":{"origin":2345,"position":3},"title":"Drilling of Badada-1 well in Kenya&#8217;s Block 2B begins","author":"Samuel Kamau Mbote","date":"January 8, 2015","format":false,"excerpt":"Block 2B operator Taipan Resources through its subsidiary Lion Petroleum has announced that the GW-190 rig has spudded Badada-1 well with the well planned to be drilled to a total depth f between 3000 and 4000 meters. The well which will take 70 days to complete will test tertiary age\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2585,"url":"https:\/\/www.oilnewskenya.com\/index.php\/taipan-resources-hits-dry-hole-kenyas-badada-1-well-block-2b\/","url_meta":{"origin":2345,"position":4},"title":"Taipan Resources hits dry hole in Kenya\u2019s Badada-1 well","author":"","date":"February 23, 2015","format":false,"excerpt":"Taipan Resources Inc Kenya-based subsidiary Lion Petroleum has announced that the Badada-1 well has been drilled to a total depth of 3,500 metres MDBRT (Measured Depth Below the Rotary Table) and following completion of logging operations will be plugged and abandoned as a dry hole. The well encountered a thick\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/badada-1.jpg?fit=238%2C212&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1723,"url":"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-set-to-spud-in-late-2014early-2015\/","url_meta":{"origin":2345,"position":5},"title":"Badada-1 well set to spud in late 2014\/early 2015","author":"Samuel Kamau Mbote","date":"September 4, 2014","format":false,"excerpt":"Tower resources has announced that following the completion of the farm in to block 2B it is now readying to drill the badada-1 well which is\u00a0 50km to the south of Sala-1 which has already returned successful results in block 9in late 2014\/early 2013.. The badada-1 well will serve as\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/badada-1.jpg?fit=238%2C212&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2345"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2345\/revisions"}],"predecessor-version":[{"id":2958,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2345\/revisions\/2958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/2308"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}