{"id":2258,"date":"2015-01-09T10:59:56","date_gmt":"2015-01-09T09:59:56","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=2258"},"modified":"2015-09-07T12:50:34","modified_gmt":"2015-09-07T12:50:34","slug":"oil-and-gas-industry-showing-better-appreciation-for-local-content-participation-sbc","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/oil-and-gas-industry-showing-better-appreciation-for-local-content-participation-sbc\/","title":{"rendered":"Oil and Gas industry showing better appreciation for local content participation &#8211; SBC"},"content":{"rendered":"<p>A research by Schlumberger\u2019s strategic management consulting arm Schlumberger Business Consulting (SBC) says there is a better appreciation by the oil and gas industry of the need for local content participation.<\/p>\n<p>This follows the outcome of a local content forum by SBC dubbed \u201cOptimizing Local Benefits from Oil &amp; Gas Projects\u201d \u00a0\u00a0that brought together E&amp;P operators, regulatory bodies, EPC contractors, tertiary educational institutions and financial institutions convened to share best practice regarding local content initiatives.<\/p>\n<p>The research narrows down discussions into four pillars \u00a0to local content development towards sustainable socio-economic growth namely developing a national talent pool, enhancing the local supply chain, pioneering approaches to fund social infrastructure and local content regulation governance.<\/p>\n<p>Under developing a national talent pool SBC says research has shown that local content has had a bigger impact than earlier thought on employment with one direct job generating 2 to 3 jobs indirectly and up to eight jobs can also be generated by increased local economic activities induced by the spending of oil and gas staff.<\/p>\n<p>To develop the talent pool the research calls for coordinated planning and close collaboration amongst a large variety of stakeholders with competency requirements needed to be formulated determined based on expected activity levels of oil and gas operations in the short, medium and long term.<\/p>\n<p>Under enhancing local supply chain capabilities, the research notes that vendor prequalification requirements have inhibited the participation of local suppliers in the oil and gas industry. SBC then calls for close working between local suppliers and oil and gas players where the latter can help prepare the suppliers by in advance informing them about future demand and required standard.<\/p>\n<p>In the third pillar the research calls on governments, petroleum development funds and industry players to work close with financial institutions in deploying various instruments to promote local participation and thus increase the impact of oil and gas investments.<\/p>\n<p>Lastly SBC says a balance between promoting both rapid and efficient project delivery and supporting development of local content is necessary provide a stable platform for industry growth.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A research by Schlumberger\u2019s strategic management consulting arm Schlumberger Business Consulting (SBC) says there is a better appreciation by the oil and gas industry of the need for local content &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/oil-and-gas-industry-showing-better-appreciation-for-local-content-participation-sbc\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":2259,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[663,783,889,1208,1434,1844,2132,2133,2253,2437,2510],"class_list":["post-2258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-ep-operators","tag-epc-contractors","tag-financial-institutions","tag-jobs-2","tag-local-content","tag-oil-and-gas-industry","tag-regulations","tag-regulatory-bodies","tag-schlumberger-business-consulting","tag-suppliers","tag-tertiary-educational-institutions","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/local-content.jpg?fit=640%2C427&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-Aq","jetpack-related-posts":[{"id":10654,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-local-and-foreign-contractors-eye-tilenga-project-deals\/","url_meta":{"origin":2258,"position":0},"title":"UGANDA: Local and Foreign Contractors Eye Tilenga Project Deals","author":"","date":"July 29, 2021","format":false,"excerpt":"Dozens of companies from Uganda and internationally attended the Total E&P Uganda Supplier Development dialogue virtual workshop held today under the theme \"Enhancing Awareness and Participation in Upcoming Opportunities in the Tilenga project\". The workshop targeting suppliers interested in the Tilenga project and East Africa crude oil pipeline informed participants\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/UGANDA-TILENGA-PROJECT-DEVELOPMENT-STAGE-EAST-AFRICA-CRUDE-OIL-PIPELINE-EACOP-OUTLOOK-2021-%E2%80%93-2025.jpg?fit=408%2C519&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10672,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-local-contractors-could-earn-up-to-1-5bn-from-development-phase\/","url_meta":{"origin":2258,"position":1},"title":"UGANDA: Local Contractors Could Earn Up to $1.5Bn From Development Phase","author":"","date":"August 4, 2021","format":false,"excerpt":"Ugandan contractors could earn more than USD 1.5 billion from contracts associated with the development phase in the Kingfisher and Tilenga oil projects as well as the EACOP and Kabaale Petrochemical city estimated to cost over USD 15 billion. This follows the country's local content laws which require that not\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":8499,"url":"https:\/\/www.oilnewskenya.com\/index.php\/european-travel-bans-are-counter-productive-and-hurting-the-oil-gas-sectors-ability-to-support-africas-economic-recovery\/","url_meta":{"origin":2258,"position":2},"title":"European Travel Bans Are Counter-Productive And Hurting The Oil &#038; Gas Sector\u2019s Ability To Support Africa\u2019s Economic Recovery","author":"","date":"July 2, 2020","format":false,"excerpt":"The continuation of travel restrictions and suspension of visas and travel between Africa and Europe is heavily restraining the oil & gas industry\u2019s recovery efforts. Because of its international nature, the oil & gas sector relies on global value-chains and successful cooperation and movement of people, goods and services between\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/02\/EY-Oil-Check.jpg?fit=927%2C617&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/02\/EY-Oil-Check.jpg?fit=927%2C617&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/02\/EY-Oil-Check.jpg?fit=927%2C617&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/02\/EY-Oil-Check.jpg?fit=927%2C617&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5801,"url":"https:\/\/www.oilnewskenya.com\/index.php\/6th-east-africa-oil-and-gas-week-set-for-nairobi-next-week\/","url_meta":{"origin":2258,"position":3},"title":"6th East Africa Oil And Gas Week Set For Nairobi Next Week","author":"","date":"March 21, 2017","format":false,"excerpt":"The 6th\u00a0East Africa Oil and Gas Week takes place on the 28th\u00a0\u2013 29th\u00a0March at the luxurious Fairmont, Norfolk Hotel in Nairobi. The annual East Africa Oil & Gas Week has established itself as a leading and vital event for mapping the very latest developments, challenges and opportunities in Oil &\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/events\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/EAOGS-2017.png?fit=596%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/EAOGS-2017.png?fit=596%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/EAOGS-2017.png?fit=596%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5703,"url":"https:\/\/www.oilnewskenya.com\/index.php\/oil-and-gas-to-employ-160000-ugandans-during-peak-construction-phase\/","url_meta":{"origin":2258,"position":4},"title":"Oil and Gas to employ 160,000 Ugandans during peak construction phase","author":"","date":"February 21, 2017","format":false,"excerpt":"The oil and gas industry will indirectly employ\u00a0up to 160,000 Ugandans during the development phase peak including 13000 direct jobs according to the petroleum directorate. Speaking during the Stanbic Uganda 4th Local Content Conference on Oil and Gas 2017 head of petroleum at the directorate Bernard Ongodia told delegates that\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/events\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/uganda-oil-001.jpg?fit=460%2C276&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":11908,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-content-intervention-fund-exceeds-500m-wabote\/","url_meta":{"origin":2258,"position":5},"title":"NIGERIA: Content Intervention Fund exceeds $500m-Wabote","author":"","date":"February 25, 2022","format":false,"excerpt":"The Nigerian Content Intervention (NCI) Fund has exceeded half a billion dollars, the Executive Secretary of the Nigerian Content Development and Monitoring Board (NCDMB), Engr. Simbi Kesiye Wabote has said. He spoke recently at the Sub-Saharan African International Petroleum Conference (SAIPEC) organised in Lagos by the Petroleum Technology Association of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Nigeria-Wabote.jpg?fit=720%2C540&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Nigeria-Wabote.jpg?fit=720%2C540&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Nigeria-Wabote.jpg?fit=720%2C540&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Nigeria-Wabote.jpg?fit=720%2C540&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=2258"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2258\/revisions"}],"predecessor-version":[{"id":3536,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/2258\/revisions\/3536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/2259"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=2258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=2258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=2258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}