{"id":1891,"date":"2014-10-09T17:00:43","date_gmt":"2014-10-09T16:00:43","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=1891"},"modified":"2015-09-07T13:29:17","modified_gmt":"2015-09-07T13:29:17","slug":"greatwall-drilling-company-to-drill-the-badada-prospect-in-kenya-block-2b","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/greatwall-drilling-company-to-drill-the-badada-prospect-in-kenya-block-2b\/","title":{"rendered":"Greatwall Drilling Company to drill the Badada Prospect in Kenya Block-2B"},"content":{"rendered":"<p>Taipan Resources Inc. the operator in block 2B has announced the signing of a Letter of Intent with the Greatwall Drilling Company of China to contract the GW-190 land rig for the planned Badada-1 well (where Tower Resources has 15% working interest) onshore Block-2B, Kenya.<\/p>\n<p>The Badada-1 well is expected to spud between mid-December 2014 and mid-January 2015 and is expected to take approximately 70 days to drill.<\/p>\n<p>The Badada-1 well is a potential play-opener as it will test the first of several prospects and leads in Block-2B that are potentially analogous to prospects in the Lokichar Basin where Tullow Oil and Africa Oil have enjoyed multiple oil discoveries in the Tertiary Rift sequence.<\/p>\n<p>The well is planned to be drilled to a total depth of between 3,000 and 4,500 metres to test primary Tertiary age reservoirs and, dependent upon results, secondary upper Cretaceous age reservoirs.<\/p>\n<p>Tower\u2019s management estimate gross unrisked prospective resources for this well range from 402mmboe (P10) to 16mmboe (P90) with a Pmean of 169mmboe which compares to Taipan\u2019s estimate of gross mean unrisked prospective resources of 251mmboe (Source: Sproule International Limited February 2014).<\/p>\n<p>Tower\u2019s says it believes this difference reflects a more conservative approach to the extent of the Badada structure, but also recognizes there is considerable upside potential in Block-2B, both in terms of additional zones within the Badada prospect and the possible extent of the trap as well as in the multiple follow-on prospects and leads in the block.<\/p>\n<p>\u201cWe are very excited by the upside potential in Block-2B and whilst this is a frontier well, if it succeeds then there is scope for repeating the success several times over. There are already a large number of leads mapped and additional seismic in 2015 could delineate these so that an aggressive exploration programme can follow in 2016\/17, \u2033 says CEO Graeme Thomson.<\/p>\n<p>If the Badada-1 well is successful it will de-risk many other prospects and leads within Block-2B and provide important information about the detailed geological evolution of the Anza Basin to aid future exploration.<\/p>\n<p>The follow-on exploration potential of just the four prospects and leads immediately adjacent to the Badada prospect is estimated to be an additional 405mmboe of gross mean unrisked prospective resources by Taipan, with a range from 890mmboe (P10) to 104mmboe (P90.<\/p>\n<p>A total of nineteen prospects and leads have been identified in the block so far with total estimated gross mean unrisked prospective resources of 1,593mmboe.<\/p>\n<p>Tower is currently updating its own view on the potential upside in the Block and will provide further guidance once this work is complete.<\/p>\n<p>Preparations at the well site are already underway with a number of auxiliary services and long-lead items already contracted. Gross well costs remain estimated at US$20 to US$25 million (US$3.0 to US$3.75 million net to Tower).<\/p>\n<p>A further update is expected upon the formal contracting of the GW-190 rig and mobilisation to the Badada-1 drill site and other operational progress in due course.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Taipan Resources Inc. the operator in block 2B has announced the signing of a Letter of Intent with the Greatwall Drilling Company of China to contract the GW-190 land rig &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/greatwall-drilling-company-to-drill-the-badada-prospect-in-kenya-block-2b\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":1129,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[166,212,274,1039,1044,1252,1418,2396,2458,2541],"class_list":["post-1891","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-anza-basin","tag-badada-1","tag-block-2b","tag-graeme-thomson","tag-greatwall-drilling-company","tag-kenya","tag-lion-petroleum","tag-sproule-international-limited","tag-taipan-resources","tag-tower-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-uv","jetpack-related-posts":[{"id":2165,"url":"https:\/\/www.oilnewskenya.com\/index.php\/taipan-resources-awards-drilling-contracts-for-badada-1-well-in-kenyas-block-2b\/","url_meta":{"origin":1891,"position":0},"title":"Taipan Resources awards drilling contracts for Badada-1 well in Kenya\u2019s Block 2B","author":"Samuel Kamau Mbote","date":"December 12, 2014","format":false,"excerpt":"Block operator in Block 2B Taipan Resources has announced that together with other joint-venture partners, have executed a contract with Greatwall for the GW-190 land rig and have also contracted Aberdeen-based Norwell Engineering to manage the drilling operations of the Badada-1 well. The GW-190 land rig recently completed the drilling\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-2b.jpg?fit=750%2C668&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2408,"url":"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-drilling-update-in-block-2b-onshore-kenya\/","url_meta":{"origin":1891,"position":1},"title":"Badada-1 Well Drilling Update in Block-2B, onshore Kenya","author":"Samuel Kamau Mbote","date":"February 4, 2015","format":false,"excerpt":"\u00a0 Taipan Resources through its Kenya-based subsidiary Lion Petroleum in its new update drilling operations for the Badada-1 well Block-2B, onshore Kenya have reached to a total depth of 1,647 metres. A 13 3\/8- inch casing has been successfully run to 1,644 metres MDBRT and cemented in the 17 1\/2-inch\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2254,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-of-badada-1-well-in-kenyas-block-2b-begins\/","url_meta":{"origin":1891,"position":2},"title":"Drilling of Badada-1 well in Kenya&#8217;s Block 2B begins","author":"Samuel Kamau Mbote","date":"January 8, 2015","format":false,"excerpt":"Block 2B operator Taipan Resources through its subsidiary Lion Petroleum has announced that the GW-190 rig has spudded Badada-1 well with the well planned to be drilled to a total depth f between 3000 and 4000 meters. The well which will take 70 days to complete will test tertiary age\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2345,"url":"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-drilling-update-in-kenyas-block-2b\/","url_meta":{"origin":1891,"position":3},"title":"Badada-1 Well Drilling Update in Kenya&#8217;s Block 2B","author":"Samuel Kamau Mbote","date":"January 21, 2015","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Taipan Resources through its Kenya-based subsidiary Lion Petroleum has provided the following update on drilling operations for the Badada-1 well, Block-2B, onshore Kenya. The Badada-1 well commenced drilling operations on 7 January 2015 and has been drilled to a total depth of 918 metres MDBRT (Measured Depth Below\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/taipan-badada-1-well1.jpg?fit=576%2C1024&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2585,"url":"https:\/\/www.oilnewskenya.com\/index.php\/taipan-resources-hits-dry-hole-kenyas-badada-1-well-block-2b\/","url_meta":{"origin":1891,"position":4},"title":"Taipan Resources hits dry hole in Kenya\u2019s Badada-1 well","author":"","date":"February 23, 2015","format":false,"excerpt":"Taipan Resources Inc Kenya-based subsidiary Lion Petroleum has announced that the Badada-1 well has been drilled to a total depth of 3,500 metres MDBRT (Measured Depth Below the Rotary Table) and following completion of logging operations will be plugged and abandoned as a dry hole. The well encountered a thick\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/badada-1.jpg?fit=238%2C212&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1723,"url":"https:\/\/www.oilnewskenya.com\/index.php\/badada-1-well-set-to-spud-in-late-2014early-2015\/","url_meta":{"origin":1891,"position":5},"title":"Badada-1 well set to spud in late 2014\/early 2015","author":"Samuel Kamau Mbote","date":"September 4, 2014","format":false,"excerpt":"Tower resources has announced that following the completion of the farm in to block 2B it is now readying to drill the badada-1 well which is\u00a0 50km to the south of Sala-1 which has already returned successful results in block 9in late 2014\/early 2013.. The badada-1 well will serve as\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/badada-1.jpg?fit=238%2C212&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1891","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=1891"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1891\/revisions"}],"predecessor-version":[{"id":3575,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1891\/revisions\/3575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1129"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=1891"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=1891"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=1891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}