{"id":1749,"date":"2014-09-10T08:04:04","date_gmt":"2014-09-10T07:04:04","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=1749"},"modified":"2015-09-07T13:49:20","modified_gmt":"2015-09-07T13:49:20","slug":"afren-plans-2d-seismic-in-h2-2014-in-kenyas-block-1","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/afren-plans-2d-seismic-in-h2-2014-in-kenyas-block-1\/","title":{"rendered":"Afren plans 2D seismic in H2 2014 in Kenya\u2019s block 1"},"content":{"rendered":"<p>Afren plans to carry a 290 km 2D seismic in block 1 as it prepares to drill an exploration well late 2015.<\/p>\n<p>The block which is located in Kenya\u2019s north eastern border is connected to the Ogaden basin with an oil seep close to the Tarbaj-1 well in the south-west corner of the block confirming the presence of hydrocarbons.<\/p>\n<p>In this block where Afren is the operator with 10,696 km airborne high resolution gravity and magnetic survey already having been carried out with another 1,900 km 2D seismic completed.<\/p>\n<p>The latest seismic follows six leads and prospects identified by Afren in the 1900km\u00a0 of 2D seismic in 2013 with the largest of these leads covering in excess of 350 km squared being subject of the programme.<\/p>\n<p>\u201cThe decision on where to drill will be made following the interpretation of this new dataset which is expected to conclude in early 2015,\u201d Afren says in a statement on the company\u2019s website.<\/p>\n<p>Last week the Business Daily reported that Afren had filed environmental disclosures with the National Environment Management Authority (NEMA) as it plans exploratory drilling in El Wak (Mandera County) and at Konton in Wajir County.<\/p>\n<p>\u201cBlock-1 has some positive hydrocarbon history\u2026an oil seep and tar staining was observed in a water well and in an adjacent 52-metre borehole cored by Total at Tarbaj in the south of the block which demonstrates that oil has been generated at some point in the basin\u2019s history,\u201d the daily quotes the filing by Afren to the environmental body.<\/p>\n<p>Apart from block 1 Afren has 100 percent interest and is the operator in Blocks L17 &amp; L18 where it also plans a new 2D seismic in 2H 2014 with two exploration wells planned in 2015.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Afren plans to carry a 290 km 2D seismic in block 1 as it prepares to drill an exploration well late 2015. The block which is located in Kenya\u2019s north &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/afren-plans-2d-seismic-in-h2-2014-in-kenyas-block-1\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":1750,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[59,253,300,301,1252,1493,1683,1715,1823,2488,2695],"class_list":["post-1749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-afren","tag-block-1","tag-block-l17","tag-block-l18","tag-kenya","tag-mandera","tag-national-environment-management-authority","tag-nema","tag-ogaden-basin","tag-tarbaj-1-well","tag-wajir","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/afren-block-1.png?fit=422%2C271&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-sd","jetpack-related-posts":[{"id":1072,"url":"https:\/\/www.oilnewskenya.com\/index.php\/afren-taipan-to-start-2d-seismic-in-kenyas-block-1-in-q2\/","url_meta":{"origin":1749,"position":0},"title":"Afren to start 2D Seismic in Kenya\u2019s Block 1 in Q2","author":"Samuel Kamau Mbote","date":"May 21, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Afren has announced that the company together with partners plans to shoot 150-250 km of additional 2D seismic in Block 1 in Q2 2014 followed by an exploration well a postponement from the earlier scheduled date in Q1 earlier. Block 1 is situated in North Eastern Kenya bordering\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/block-1.jpg?fit=679%2C267&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/block-1.jpg?fit=679%2C267&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/block-1.jpg?fit=679%2C267&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3030,"url":"https:\/\/www.oilnewskenya.com\/index.php\/afren-receives-15-month-extension-kenyas-block-1\/","url_meta":{"origin":1749,"position":1},"title":"Afren Receives 15 Month Extension in Kenya\u2019s Block 1","author":"","date":"May 29, 2015","format":false,"excerpt":"The government of Kenya through the Ministry of Energy has granted Afren through its subsidiary East African Exploration (EAX) a 15 month extension to the current Second Additional Exploration Period as a result of security concerns in the area. EAX and its JV partner Taipan Resources through its subsidiary Lion\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1660,"url":"https:\/\/www.oilnewskenya.com\/index.php\/afren-set-to-drill-2-wells-in-the-lamu-coastal-basin-in-2015\/","url_meta":{"origin":1749,"position":2},"title":"Afren set to drill 2 wells in the Lamu coastal basin in 2015","author":"Samuel Kamau Mbote","date":"August 22, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Afren plans to drill two wells in 2015 after completing an airborne gravity and magnetic survey and additional 2D seismic to help define closures across the Mombasa High. The wells are set to be drilled in blocks L17 and L18 offshore south-east Kenya covers an area of approximately\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/afren-block-l1718.jpg?fit=679%2C267&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/afren-block-l1718.jpg?fit=679%2C267&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/afren-block-l1718.jpg?fit=679%2C267&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6592,"url":"https:\/\/www.oilnewskenya.com\/index.php\/octant-energy-plans-4-wells-one-seismic-kenyas-mandera-lamu-basin-blocks\/","url_meta":{"origin":1749,"position":3},"title":"Octant Energy Plans 4 wells, 2D Seismic in Kenya\u2019s Mandera and Lamu Basin Blocks","author":"","date":"November 30, 2017","format":false,"excerpt":"Octant Energy which took over from Afren operated Blocks 1, L17 and L18 plans to carry on with already identified drill ready prospects in the three blocks as well as 2D seismic in south Eastern part of the Mandera basin to futher provide more information at El Wak. This is\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Octant-Energy-Kenya.jpg?fit=370%2C416&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1606,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simbas-ftg-survey-narrows-2d-seismic-acquisition-areas-in-kenyas-block-2a\/","url_meta":{"origin":1749,"position":4},"title":"Simba\u2019s FTG Survey narrows 2D seismic acquisition areas in Kenya\u2019s Block 2A","author":"Samuel Kamau Mbote","date":"August 13, 2014","format":false,"excerpt":"Simba Energy Inc.\u00a0has announced it is in receipt of Bell Geospace\u2019s final report and results from their aerial FTG (Full Tensor Gradiometry) survey analysis and interpretation at it\u2019s 100% interest Block 2A concession in Kenya. Simba says the results have identified five structural features with independent closures varying in size\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"simba1","src":"https:\/\/i0.wp.com\/oilnewskenya.com\/wp-content\/uploads\/2014\/08\/simba1.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1666,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-reopens-discussions-with-interested-parties-in-kenyas-block-2a\/","url_meta":{"origin":1749,"position":5},"title":"Simba Energy reopens discussions with interested parties in Kenya\u2019s block 2A","author":"Samuel Kamau Mbote","date":"August 25, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Canadian explorer Simba Energy has reported that following positive results of the Company\u2019s most recent FTG (Full Tensor Gradiometry) survey and final report by Bell Geospace, the Company has reopened its data room and, with the assistance of Ernst & Young\u2019s Corporate Finance Oil & Gas division in\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=1749"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1749\/revisions"}],"predecessor-version":[{"id":3598,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1749\/revisions\/3598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1750"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=1749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=1749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=1749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}