{"id":1656,"date":"2014-08-21T12:10:24","date_gmt":"2014-08-21T09:10:24","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=1656"},"modified":"2015-09-04T09:59:22","modified_gmt":"2015-09-04T09:59:22","slug":"2d-seismic-on-tanzanias-mnazi-bay-concession-set-to-be-complete-in-q3","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-on-tanzanias-mnazi-bay-concession-set-to-be-complete-in-q3\/","title":{"rendered":"2D seismic on Tanzania\u2019s Mnazi Bay Concession set to be complete in Q3"},"content":{"rendered":"<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;]<\/p>\n<p>The acquisition of 315km of conventional 2D onshore seismic data over the prospective areas of the Mnazi Bay Concession Tanzania is on program and is expected to be completed in Q3 according to Wentworth resources in its latest financial statements.<\/p>\n<p>The acquisition of the 2D onshore seismic data had earlier been expected to be completed during Q2 as per the Q1 financial statements.<\/p>\n<p>The concession which is located in gas rich South-Eastern Tanzania region has seen increased activity\u00a0 since 2005 after a 25 year abandoning by Eni (which drilled a shallow water, offshore well and discovered the Mnazi Bay Gas Field) with the drilling of two appraisal wells (MB-2 and MB-3) and one exploration well (MS-1X), all of which encountered hydrocarbons.<\/p>\n<p>Another well which discovered gas was also drilled at the Msibati gas field resulting to the construction of two gas processing plants, 27km of 8\u201d pipeline, and an 18MW gas-fired power plant.<\/p>\n<p>Wentworth Resources says processing and interpretation of this new seismic data during 2014 is expected to support future appraisal, development and exploration drilling which is anticipated to commence in 2015.<\/p>\n<p>The Mnazi Bay Concession covers a 756km\u00b2 with Wentworth owning a 41.78% working interest in operations other than exploration on the block together with the operator, Maurel et Prom 38.22%, and TPDC 20%.<\/p>\n<p>Wentworth also owns a 52.225%\u00a0working interest in exploration operations on the block together with Maurel et Prom\u2019s 47.775% working interest.<\/p>\n<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[twitter-follow screen_name=&#8217;oilnewskenya&#8217;] The acquisition of 315km of conventional 2D onshore seismic data over the prospective areas of the Mnazi Bay Concession Tanzania is on program and is expected to be &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-on-tanzanias-mnazi-bay-concession-set-to-be-complete-in-q3\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":1657,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[768,1534,1609,1646,1706,2466,2719],"class_list":["post-1656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-eni","tag-maurel-et-prom","tag-mnazi-bay-concession","tag-msibati-gas-field","tag-nazi-bay-gas-field","tag-tanzania","tag-wentworth-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/mnazi-bay.png?fit=315%2C417&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-qI","jetpack-related-posts":[{"id":2715,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-resources-operational-update-east-africa-acreage\/","url_meta":{"origin":1656,"position":0},"title":"Wentworth Resources Operational Update on its East Africa Acreage","author":"","date":"March 17, 2015","format":false,"excerpt":"Wentworth Resources plans the commenced planning for drilling operations of the fifth (MB-4) development well which is expected to spud in March. The well which will complete in 90 days or June is expected to initially produce 20mmscf\/day (gross). Meanwhile the explorer has commenced design and construction of field infrastructure\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentworth-resources.jpg?fit=690%2C340&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentworth-resources.jpg?fit=690%2C340&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentworth-resources.jpg?fit=690%2C340&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3101,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-resources-estimates-3-5m-tanzania-monthly-gas-sales\/","url_meta":{"origin":1656,"position":1},"title":"Wentworth Resources Estimates $3.5m in Tanzania Monthly Gas Sales","author":"","date":"June 23, 2015","format":false,"excerpt":"Wentworth Resources says it estimates that monthly gas sales in Tanzania into new government owned pipeline Q3 2015 could reach an estimated $3.5m monthly. Initially Mnazi Bay will be the only supplier of gas in Tanzania into new pipeline from 5 wells which will be producing in the field by\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5862,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tembo-1-appraisal-well-drilling-planned-for-in-2018\/","url_meta":{"origin":1656,"position":2},"title":"Tembo-1 Appraisal well Drilling planned for in 2018","author":"","date":"April 10, 2017","format":false,"excerpt":"Rovuma onshore block operator Wentworth Resources has said it plans to drill Tembo-1 appraisal well in 2018 in the latest operational update. According to Wentworth Resources the reprocessing of approx. 1,000 km of existing seismic data is complete, interpretation is being finalized and results from the\u00a0Tembo-1 discovery well\u00a0have been fully\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/tembo-1.png?fit=460%2C327&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2939,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-ongoing-mb-4-development-well-mnazi-bay-block-tanzania\/","url_meta":{"origin":1656,"position":3},"title":"Drilling ongoing at MB-4 Development Well in Mnazi Bay Block Tanzania","author":"","date":"May 19, 2015","format":false,"excerpt":"Wentworth Resources has reported that the MB-4 development well that spud in March is ongoing with drilling operations expected to be completed in June or in 90 days as announced during the last update. The well which is expected to initially produce 20mmscf\/day (gross) is expected to be ready to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Wentworth-Resources.png?fit=375%2C286&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2667,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-resources-gets-5-6m-credit-facility-finance-ongoing-mnazi-bay-concession-development\/","url_meta":{"origin":1656,"position":4},"title":"Wentworth Resources gets $5.6m credit facility to finance ongoing Mnazi Bay Concession development","author":"","date":"March 5, 2015","format":false,"excerpt":"Wentworth Resources has announced that the Company has subsequently drawn an amount of $5.6 million on an existing $20 million credit facility with a Tanzania-based bank, TIB Development Bank Limited. The credit facility relates to the Mnazi Bay Concession development and operating costs that were incurred and paid for by\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/Mnazi-Bay-Concession.png?fit=805%2C440&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/Mnazi-Bay-Concession.png?fit=805%2C440&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/Mnazi-Bay-Concession.png?fit=805%2C440&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/Mnazi-Bay-Concession.png?fit=805%2C440&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":3110,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-resources-raises-7-6-million-finance-tanzanias-mnazi-bay-developments\/","url_meta":{"origin":1656,"position":5},"title":"Wentworth Resources raises $7.6 million to finance Tanzania\u2019s Mnazi Bay developments","author":"","date":"June 29, 2015","format":false,"excerpt":"Wentworth Resources has announced that it has successfully raised gross proceeds of USD 7.6 million (GBP 4.9 million, NOK 59.7 million) with institutional investors and certain Directors and members of the Executive Management through a private placement of 15,412,269 new shares. The private placement saw no discount to market price\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Wentworth-Resources.png?fit=375%2C286&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=1656"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1656\/revisions"}],"predecessor-version":[{"id":3439,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/1656\/revisions\/3439"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1657"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=1656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=1656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=1656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}