{"id":15600,"date":"2026-01-30T08:48:42","date_gmt":"2026-01-30T08:48:42","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=15600"},"modified":"2026-01-30T08:50:02","modified_gmt":"2026-01-30T08:50:02","slug":"tanzania-mnazi-bay-mobilises-rig-for-three-well-drilling-campaign-to-boost-gas-production","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mnazi-bay-mobilises-rig-for-three-well-drilling-campaign-to-boost-gas-production\/","title":{"rendered":"Tanzania: Mnazi Bay Mobilises Rig for Three-Well Drilling Campaign to Boost Gas Production"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Operators at Tanzania\u2019s Mnazi Bay gas field have mobilised a drilling rig to site, marking the start of a three-well drilling campaign aimed at materially increasing gas production and strengthening supply reliability for the domestic market.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The drilling programme, which had initially been scheduled to spud in December, is now expected to commence in the first half of February, following the successful mobilisation of the rig and completion of preparatory works on location. The campaign represents a key upstream investment designed to unlock additional gas volumes from the Mnazi Bay permit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to project details, the new wells are expected to <strong>s<\/strong>ustainably lift the gross production potential of the field beyond its current level of approximately 100 million cubic feet per day (mmcfd). This increase will take advantage of existing surface infrastructure, which has a nameplate capacity exceeding 130 mmcfd, allowing incremental volumes to be brought onstream without major new facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While Maurel &amp; Prom\u2019s working interest gas production (60%) from Mnazi Bay averaged 59.7 mmcfd in 2025, a marginal 3 percent decline compared to 2024, the upcoming drilling campaign is expected to reverse this trend by adding new production points and enhancing reservoir deliverability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The three-well programme is strategically important for Tanzania\u2019s gas sector, as Mnazi Bay plays a critical role in supplying natural gas for power generation and industrial consumption, particularly in the southern regions of the country. Additional wells are expected to improve production resilience, reduce pressure drawdown on existing wells, and support rising domestic gas demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Industry observers note that the drilling campaign signals continued operator confidence in the Mnazi Bay reservoir and underscores the importance of incremental brownfield developments in maximising value from existing gas assets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Successful execution of the February spud and subsequent well completions could see Mnazi Bay production move closer to facility capacity in the medium term, reinforcing Tanzania\u2019s position as a key natural gas producer in East Africa.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Operators at Tanzania\u2019s Mnazi Bay gas field have mobilised a drilling rig to site, marking the start of a three-well drilling campaign aimed at materially increasing gas production and strengthening &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mnazi-bay-mobilises-rig-for-three-well-drilling-campaign-to-boost-gas-production\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":9802,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[1533,6503,2466],"class_list":["post-15600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-maurel-prom","tag-mnazi-bay-gas-field","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/Mnazi-Bay-Field.png?fit=478%2C561&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-43C","jetpack-related-posts":[{"id":2772,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mtwara-dar-es-salaam-pipeline-now-complete-first-gas-delivery-expected-july-2015\/","url_meta":{"origin":15600,"position":0},"title":"Mtwara to Dar es Salaam pipeline now complete, first gas delivery expected in July 2015","author":"","date":"March 31, 2015","format":false,"excerpt":"East Africa-focused oil & gas company has announced that the construction of the Government owned and operated Mtwara to Dar es Salaam pipeline is now 100% complete and the two associated processing facilities are approximately 96% complete. Wentworth Resources today provides an operational update in the lead up to the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/03\/wentwirth-logo.png?fit=376%2C285&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2314,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-of-kifaru-1-well-in-mozambique-begins\/","url_meta":{"origin":15600,"position":1},"title":"Drilling of Kifaru-1 well in Mozambique begins","author":"Samuel Kamau Mbote","date":"January 15, 2015","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Wentworth Resources has announced the beginning of drilling operations on the Kifaru-1 exploration well by the Helmerich & Payne rig #243 in the Rovuma Onshore Concession in northern Mozambique. The Kifaru-1 exploration well is targeting Miocene sands, similar to the reservoirs in the Mnazi Bay and Msimbati gas\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/kifaru-1-new.png?fit=633%2C616&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2939,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-ongoing-mb-4-development-well-mnazi-bay-block-tanzania\/","url_meta":{"origin":15600,"position":2},"title":"Drilling ongoing at MB-4 Development Well in Mnazi Bay Block Tanzania","author":"","date":"May 19, 2015","format":false,"excerpt":"Wentworth Resources has reported that the MB-4 development well that spud in March is ongoing with drilling operations expected to be completed in June or in 90 days as announced during the last update. The well which is expected to initially produce 20mmscf\/day (gross) is expected to be ready to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Wentworth-Resources.png?fit=375%2C286&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1656,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-on-tanzanias-mnazi-bay-concession-set-to-be-complete-in-q3\/","url_meta":{"origin":15600,"position":3},"title":"2D seismic on Tanzania\u2019s Mnazi Bay Concession set to be complete in Q3","author":"Samuel Kamau Mbote","date":"August 21, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] The acquisition of 315km of conventional 2D onshore seismic data over the prospective areas of the Mnazi Bay Concession Tanzania is on program and is expected to be completed in Q3 according to Wentworth resources in its latest financial statements. The acquisition of the 2D onshore seismic data\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/mnazi-bay.png?fit=315%2C417&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3091,"url":"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-reports-promising-results-mb-4-development-well-tanzania\/","url_meta":{"origin":15600,"position":4},"title":"Maurel et Prom reports Promising results of the MB-4 development well in Tanzania","author":"","date":"June 18, 2015","format":false,"excerpt":"Manzi Bay operator Maurel et Prom has announced that the MB-4 development well, drilled 800 m from the MB-2 and MB-3 wells at the Mnazi Bay gas field, has crossed Miocene gas reservoirs with net pay of 24 metres (Upper Mnazi Bay) and 43 metres (Lower Mnazi Bay) respectively, both\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4-well-Tanzania-photo.png?fit=435%2C329&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12357,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-wentworth-resources-provides-operational-update\/","url_meta":{"origin":15600,"position":5},"title":"TANZANIA: Wentworth Resources Provides Operational Update","author":"","date":"June 22, 2022","format":false,"excerpt":"Following record production achieved in 2021,\u00a0Wentworth and its joint venture partners\u00a0continued to realize\u00a0strong production\u00a0rates\u00a0throughout 2022,recording an average production rate\u00a0of 92 MMscf\/d year to date. The five producing wells in the Mnazi Bay field and the associated joint venture operated facilities continued to perform well and without issues. Furthermore, the reductions\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/15600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=15600"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/15600\/revisions"}],"predecessor-version":[{"id":15601,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/15600\/revisions\/15601"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/9802"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=15600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=15600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=15600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}