{"id":14936,"date":"2025-04-22T18:14:03","date_gmt":"2025-04-22T18:14:03","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=14936"},"modified":"2025-04-22T18:14:05","modified_gmt":"2025-04-22T18:14:05","slug":"libya-harouge-oil-operations-resumes-production-from-well-b-102-at-amal-field","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/libya-harouge-oil-operations-resumes-production-from-well-b-102-at-amal-field\/","title":{"rendered":"LIBYA: Harouge Oil Operations Resumes Production from Well B-102 at Amal Field"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Harouge Oil Operations has successfully resumed production from well B-102, located at the Amal Field (V-12), following the completion of a comprehensive maintenance program. The well is now producing at a daily rate of 1,500 barrels of crude oil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The maintenance activities included a thorough technical evaluation of the well, execution of all necessary technical analyses, and the procurement and installation of a new electric submersible pump (ESP). These measures restored the well\u2019s operational readiness and ensured stable production rates after being offline for more than a year and a half.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This initiative is part of the National Oil Corporation\u2019s strategic plan to boost national oil production. It was carried out with direct support and oversight from Harouge\u2019s Management Committee, which remains committed to reactivating idle wells and enhancing the operational readiness of oilfield infrastructure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Harouge Oil Operations has successfully resumed production from well B-102, located at the Amal Field (V-12), following the completion of a comprehensive maintenance program. The well is now producing at &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/libya-harouge-oil-operations-resumes-production-from-well-b-102-at-amal-field\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":14937,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1],"tags":[],"class_list":["post-14936","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Amal-Field.webp?fit=1200%2C800&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3SU","jetpack-related-posts":[{"id":8269,"url":"https:\/\/www.oilnewskenya.com\/index.php\/libya-noc-confirms-restart-of-production-at-sharara-oil-field\/","url_meta":{"origin":14936,"position":0},"title":"Libya: NOC confirms restart of production at Sharara oil field","author":"","date":"June 8, 2020","format":false,"excerpt":"National Oil Corporation (NOC) confirms the return of production at the Sharara oil field south of the country, after lengthy negotiations by the NOC to reopen the Hamada valve, which had been illegally closed last January- resulting in the shutdown of production and collapse of the tank (Surge Tank D101\u2026","rel":"","context":"In &quot;North Africa&quot;","block_context":{"text":"North Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/north-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Libya-NOC_LOGO2.jpg?fit=800%2C526&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Libya-NOC_LOGO2.jpg?fit=800%2C526&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Libya-NOC_LOGO2.jpg?fit=800%2C526&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Libya-NOC_LOGO2.jpg?fit=800%2C526&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9683,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-pharos-energy-provides-operational-update\/","url_meta":{"origin":14936,"position":1},"title":"EGYPT: Pharos Energy Provides Operational Update","author":"","date":"January 14, 2021","format":false,"excerpt":"El Fayum Production Production for 2020 from the El Fayum Concession averaged 5,270 bopd. This is in line with the Egypt 2020 production guidance given on 12 May 2020 of 5,000-6,000 bopd. El Fayum Development and Operations Prior to the COVID-19 pandemic and the oil price shock, three drilling rigs\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Egypt-El-Fayum.jpg?fit=806%2C585&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Egypt-El-Fayum.jpg?fit=806%2C585&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Egypt-El-Fayum.jpg?fit=806%2C585&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Egypt-El-Fayum.jpg?fit=806%2C585&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11544,"url":"https:\/\/www.oilnewskenya.com\/index.php\/libya-waha-oil-company-completes-maintenance-work-for-the-main-crude-transmission-line\/","url_meta":{"origin":14936,"position":2},"title":"LIBYA: Waha Oil Company Completes Maintenance Work for the Main Crude Transmission Line","author":"","date":"January 8, 2022","format":false,"excerpt":"The technical teams at Waha Oil Company on Wednesday completed the maintenance operations of the main 32-inch oil transmission line connecting the fields (Al-Samah - Al-Dhahra) to ESidra port at the points 70 km and 71 km, which continued over 24 hours for two consecutive days. The work was completed\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":9539,"url":"https:\/\/www.oilnewskenya.com\/index.php\/senegal-modec-awarded-operations-and-maintenance-contract-for-sangomar-field-development-fpso\/","url_meta":{"origin":14936,"position":3},"title":"SENEGAL: MODEC awarded Operations and Maintenance Contract for Sangomar Field Development FPSO","author":"","date":"December 14, 2020","format":false,"excerpt":"MODEC has announced that it has signed a contract with Woodside Energy\u00a0for the operations and maintenance of a Floating Production Storage and Offloading (FPSO) vessel for the Sangomar (formerly SNE) Field Development Phase 1 (Sangomar Field Development) project in the Sangomar Offshore and Sangomar Offshore Deep oil blocks, located offshore\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/12\/sangomar-fpso.jpg?fit=1200%2C686&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/12\/sangomar-fpso.jpg?fit=1200%2C686&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/12\/sangomar-fpso.jpg?fit=1200%2C686&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/12\/sangomar-fpso.jpg?fit=1200%2C686&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/12\/sangomar-fpso.jpg?fit=1200%2C686&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":14429,"url":"https:\/\/www.oilnewskenya.com\/index.php\/equatorial-guinea-gepetrol-assumes-operatorship-of-block-b-targets-multi-phase-development-at-zafiro\/","url_meta":{"origin":14936,"position":4},"title":"EQUATORIAL GUINEA: GEPetrol Assumes Operatorship of Block B, Targets Multi-Phase Development at Zafiro","author":"","date":"July 24, 2024","format":false,"excerpt":"Equatorial Guinea\u2019s national oil company (NOC) GEPetrol has outlined a multi-phase development plan for the Zafiro Field, located in Block B. The company will work towards increasing the flow of production at the field, leveraging its newfound position as operator of the block to bolster production and support economic growth.\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/GePetrol.jpg?fit=800%2C600&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/GePetrol.jpg?fit=800%2C600&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/GePetrol.jpg?fit=800%2C600&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/GePetrol.jpg?fit=800%2C600&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12353,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-transglobe-energy-provides-operations-update\/","url_meta":{"origin":14936,"position":5},"title":"EGYPT: TransGlobe Energy Provides Operations Update","author":"","date":"June 21, 2022","format":false,"excerpt":"Eastern Desert (100% WI) The Company continued to use the EDC-64 rig in its Eastern Desert drilling campaign, managing to drill and case four additional development wells in the K-Field during the quarter to date. The K-71 well, reported on in the previous operations update of April 6, 2022, was\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-Eastern-Desert.jpg?fit=470%2C616&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=14936"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14936\/revisions"}],"predecessor-version":[{"id":14938,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14936\/revisions\/14938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/14937"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=14936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=14936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=14936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}