{"id":14438,"date":"2024-07-25T07:09:44","date_gmt":"2024-07-25T07:09:44","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=14438"},"modified":"2024-07-25T07:09:44","modified_gmt":"2024-07-25T07:09:44","slug":"ivory-coast-fpso-petrojarl-kong-and-fso-yamoussoukro-ready-to-leave-for-phase-2-of-baleine-project","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/ivory-coast-fpso-petrojarl-kong-and-fso-yamoussoukro-ready-to-leave-for-phase-2-of-baleine-project\/","title":{"rendered":"IVORY COAST: FPSO Petrojarl Kong and FSO Yamoussoukro ready to leave for Phase 2 of Baleine project"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">&nbsp;Eni announces that the naming ceremony of the Floating Production, Storage and Offloading Unit (FPSO) Petrojarl Kong and the Floating Storage and Offloading Unit (FSO) Yamoussoukro was held today in Dubai. The two vessels will significantly increase production from the Baleine field, located offshore C\u00f4te d&#8217;Ivoire, the largest discovery ever made in the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ceremony was attended by C\u00f4te d&#8217;Ivoire&#8217;s Minister of Petroleum, Mines and Energy Mamadou Sangafowa Coulibaly, Petroci CEO Fatoumata Sanogo, and Eni&#8217;s Chief Operating Officer Natural Resources Guido Brusco.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the christening of the vessels, phase 2 of the Baleine project is now in full swing, in line with the record timing of phase 1. After just 12 months on site in a challenging market environment, the refurbished units are preparing to set sail for the Ivory Coast, where they will be anchored about 50km from the coast, alongside the FPSO Baleine that entered operation in August 2023.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the startup of Phase 2, scheduled for December 2024, total production from the Baleine field will rise to 60,000 barrels of oil per day and 70 million cubic feet of associated gas (equivalent to 2 million cubic meters of associated gas), significantly increasing current production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Baleine project strengthens C\u00f4te d&#8217;Ivoire&#8217;s role in the regional and international energy market. In addition, through the adoption of cutting-edge technologies and industry-leading initiatives designed in collaboration with institutions and already underway, it will be the first net zero-emission Upstream (Scope 1 and 2) development on the African continent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Eni has been operating in C\u00f4te d&#8217;Ivoire since 2015 where it has an equity production of about 22,000 barrels of oil equivalent per day and participates in six blocks in Ivorian deepwater: CI-101, CI-205, CI-401, CI-501, CI-801 and CI- 802, all with the same partner Petroci Holding. The company is active in the country with initiatives ranging from hydrocarbon production to vegetable oil production for biorefining, as well as projects to improve access to health, education and training, contributing to the country&#8217;s economic, social and energy development.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp;Eni announces that the naming ceremony of the Floating Production, Storage and Offloading Unit (FPSO) Petrojarl Kong and the Floating Storage and Offloading Unit (FSO) Yamoussoukro was held today in &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/ivory-coast-fpso-petrojarl-kong-and-fso-yamoussoukro-ready-to-leave-for-phase-2-of-baleine-project\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":14440,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,11,7444],"tags":[11525,10643,9562,11422,9563,11424,9565,420,768,11622,11623],"class_list":["post-14438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-top-news","category-west-africa","tag-baleine-project","tag-ci-101","tag-ci-205","tag-ci-401","tag-ci-501","tag-ci-801","tag-ci-802","tag-cote-divoire","tag-eni","tag-fpso-petrojarl-kong","tag-fso-yamoussoukro","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/Baleine.png?fit=800%2C500&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3KS","jetpack-related-posts":[{"id":14224,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cote-divoire-dof-group-award-baleine-project-contract\/","url_meta":{"origin":14438,"position":0},"title":"COTE d&#8217;IVOIRE: DOF Group Award Baleine Project Contract","author":"","date":"February 13, 2024","format":false,"excerpt":"DOF has been awarded a contract by Altera Infrastructure to install one FPSO (Floating Production, Storage and Offloading unit) and one FSO (Floating Storage unit) for the phase 2 development of the Baleine field in Cote d'Ivoire, West Africa, operated by Eni with Petroci Holding as partner. The project includes\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/02\/Skandi-Skassen.jpg?fit=557%2C346&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/02\/Skandi-Skassen.jpg?fit=557%2C346&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/02\/Skandi-Skassen.jpg?fit=557%2C346&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13981,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ivory-coast-altera-awarded-contracts-with-eni-for-the-baleine-field\/","url_meta":{"origin":14438,"position":1},"title":"IVORY COAST: Altera Awarded Contracts with Eni for the Baleine Field","author":"","date":"October 4, 2023","format":false,"excerpt":"Voyageur Spirit FPSO to be redeployed and Shuttle Tanker Nordic Brasilia to be converted into FSO Altera Infrastructure has been awarded contracts for redeployment of the FPSO Voyageur Spirit and the shuttle tanker Nordic Brasilia for the Baleine Phase 2 project, located offshore\u00a0C\u00f4te d'Ivoire. The vessels are set for deployment\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Cote-d-Iviore-Baleine-scaled.jpg?fit=1200%2C387&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Cote-d-Iviore-Baleine-scaled.jpg?fit=1200%2C387&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Cote-d-Iviore-Baleine-scaled.jpg?fit=1200%2C387&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Cote-d-Iviore-Baleine-scaled.jpg?fit=1200%2C387&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Cote-d-Iviore-Baleine-scaled.jpg?fit=1200%2C387&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":15804,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cote-divoire-eni-and-partners-approve-investment-for-baleine-phase-3\/","url_meta":{"origin":14438,"position":2},"title":"C\u00f4te d\u2019Ivoire: Eni and Partners approve investment for Baleine Phase 3","author":"Samuel Kamau Mbote","date":"May 26, 2026","format":false,"excerpt":"During a ceremony held yesterday in Abidjan in the presence of the Minister of Mines, Petroleum and Energy of C\u00f4te d\u2019Ivoire, Mamadou Sangafowa-Coulibaly, Eni and its partners Petroci and Vitol approved the final investment decision (FID) for the Baleine Phase 3 project, marking a significant milestone in the development of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2026\/05\/Eni_Baleine-01_horizontal-16-9.webp?fit=840%2C473&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2026\/05\/Eni_Baleine-01_horizontal-16-9.webp?fit=840%2C473&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2026\/05\/Eni_Baleine-01_horizontal-16-9.webp?fit=840%2C473&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2026\/05\/Eni_Baleine-01_horizontal-16-9.webp?fit=840%2C473&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13559,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cote-divoire-eni-celebrates-sail-away-of-fpso-firenze-to-baleine-field\/","url_meta":{"origin":14438,"position":3},"title":"COTE d&#8217;IVOIRE: Eni celebrates sail away of FPSO Firenze to Baleine field","author":"","date":"April 12, 2023","format":false,"excerpt":"The FPSO Firenze will allow production start-up of the Baleine field, which is the largest hydrocarbon discovery in C\u00f4te d'Ivoire. Eni, in partnership with\u00a0PetroCi, celebrated the sail away of the\u00a0FPSO Firenze to the Baleine field offshore C\u00f4te d'Ivoire\u00a0in Dubai. The event was attended by Mamadou Sangafowa-Coulibaly, Minister of Mines, Petroleum\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/FPSO-FIRENZE.jpg?fit=768%2C523&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/FPSO-FIRENZE.jpg?fit=768%2C523&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/FPSO-FIRENZE.jpg?fit=768%2C523&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/FPSO-FIRENZE.jpg?fit=768%2C523&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11941,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-energy-provides-update-on-etame-field-reconfiguration-and-fso-deployment\/","url_meta":{"origin":14438,"position":4},"title":"GABON: VAALCO Energy Provides Update on Etame Field Reconfiguration and FSO Deployment","author":"","date":"March 1, 2022","format":false,"excerpt":"VAALCO Energy has provided an update on the Etame field reconfiguration in conjunction with the replacement of the existing Floating Production, Storage and Offloading unit (FPSO) with a Floating Storage and Offloading vessel (FSO) offshore Gabon. VAALCO anticipates that all of the associated engineering, long-lead equipment and significant contracts are\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/10\/GABON-ETAME.jpg?fit=376%2C485&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":15863,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cote-divoire-technipfmc-awarded-subsea-contract-for-enis-baleine-phase-3-development\/","url_meta":{"origin":14438,"position":5},"title":"Cote d&#8217;Ivoire: TechnipFMC Awarded Subsea Contract for Eni\u2019s Baleine Phase 3 Development","author":"Samuel Kamau Mbote","date":"July 13, 2026","format":false,"excerpt":"TechnipFMC has been awarded a significant contract by Eni SpA for Baleine Phase 3, a fast-track development to expand production from the largest hydrocarbon discovery offshore C\u00f4te d\u2019Ivoire. TechnipFMC will design and manufacture flexible flowlines and risers to connect wells in water depths of approximately 1,200 meters to a new\u2026","rel":"","context":"In \"Baleine\"","block_context":{"text":"Baleine","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/baleine\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/Baleine.png?fit=800%2C500&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/Baleine.png?fit=800%2C500&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/Baleine.png?fit=800%2C500&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/07\/Baleine.png?fit=800%2C500&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=14438"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14438\/revisions"}],"predecessor-version":[{"id":14441,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14438\/revisions\/14441"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/14440"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=14438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=14438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=14438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}