{"id":14353,"date":"2024-06-07T08:00:47","date_gmt":"2024-06-07T08:00:47","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=14353"},"modified":"2024-06-07T08:00:47","modified_gmt":"2024-06-07T08:00:47","slug":"angola-aker-solutions-secures-long-term-brownfield-modification-frame-agreement-with-azule-energy","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/angola-aker-solutions-secures-long-term-brownfield-modification-frame-agreement-with-azule-energy\/","title":{"rendered":"ANGOLA: Aker Solutions Secures Long-term Brownfield &amp; Modification Frame Agreement with Azule Energy"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Aker Solutions has secured a sizeable long term frame agreement with Azule Energy to provide engineering, procurement, and construction services (EPC) for brownfield projects and modifications for two FPSOs in Angola.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is a continuation of the current frame agreement Aker Solutions has with the operator Azule Energy. The operator is Angola\u2019s largest independent equity producer of oil and gas and is an incorporated joint venture owned by Eni and bp.\u202f&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The scope of work is focused on two FPSO (floating production, storage, and offloading) units, namely Greater Plutonio and PSVM. The work comprises engineering, procurement, and construction services (EPC) of the brownfield maintenance and modifications scopes.\u202f\u202f&nbsp;<br>\u202f&nbsp;<br>The contract is a frame agreement covering maintenance and modifications activities with a duration of three years plus two one-year options. &nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contract will be executed and delivered by the Aker Solutions\u2019 team based in Luanda, Angola, and Aberdeen, UK. The project management will be based in Angola to be close to the operation and continue to develop locally. \u202f&nbsp;<br>\u202f&nbsp;<br>\u201cWe are building on our robust track record in Angola, dating back to 1998. Aker Solutions is a leading service operator and has a clear ambition to grow internationally. This new contract strengthens our global life cycle operations and is a pivotal project for our offices in Aberdeen and Luanda\u201d, said Paal Eikeseth, executive vice president and head of Life Cycle, Aker Solutions.\u202f&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Throughout the current contract period, there has been substantial growth in terms of in-country execution and the development of Aker Solutions&#8217; local workforce. Currently, over 40 percent of the total scope volume is being executed in Angola, and a significantly increased target has been set for the new contract period.\u202f\u202f&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are actively recruiting to enhance the strength and competence of our existing project team. Moving forward, our local business development efforts will focus on improving and strengthening relationships with local subcontractors, as well as hiring and training local personnel. We are pleased to have received renewed trust from Azule Energy and will continue to ensure the delivery of reliable and safe executions to safeguard the integrity of the FPSOs\u201d, said Paal Eikeseth.\u202f\u202f&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Azule Energy-contract will be booked as part of Aker Solutions&#8217; second quarter order intake in the Life Cycle segment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aker Solutions has secured a sizeable long term frame agreement with Azule Energy to provide engineering, procurement, and construction services (EPC) for brownfield projects and modifications for two FPSOs in &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/angola-aker-solutions-secures-long-term-brownfield-modification-frame-agreement-with-azule-energy\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":14354,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[6251,160,10317,918,11565,11566],"class_list":["post-14353","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-aker-solutions","tag-angola","tag-azule-energy","tag-fpso","tag-greater-plutonio","tag-psvm","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/06\/FPSO-PSVM.jpg?fit=1600%2C900&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3Jv","jetpack-related-posts":[{"id":13345,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-aker-solutions-wins-umbilicals-contract-for-the-agogo-field-development\/","url_meta":{"origin":14353,"position":0},"title":"ANGOLA: Aker Solutions Wins Umbilicals Contract for the Agogo Field Development","author":"","date":"February 28, 2023","format":false,"excerpt":"Aker Solutions has been awarded a sizeable contract by Eni Angola S.p.A. \u2013 Sucursal de Angola, a subsidiary of Azule Energy Holdings Limited, to provide the dynamic and static subsea umbilicals for the Agogo field development located offshore Angola in the West Hub Area of Block 15\/06. The contract includes\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":13366,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-aker-solutions-wins-umbilicals-contract-for-the-agogo-field-development-2\/","url_meta":{"origin":14353,"position":1},"title":"ANGOLA: Aker Solutions Wins Umbilicals Contract for the Agogo Field Development","author":"","date":"March 1, 2023","format":false,"excerpt":"Aker Solutions has been awarded a sizeable[1] contract by Eni Angola S.p.A. \u2013 Sucursal de Angola, a subsidiary of Azule Energy Holdings Limited, to provide the dynamic and static subsea umbilicals for the Agogo field development located offshore Angola in the West Hub Area of Block 15\/06. The contract includes\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Umblicals-Angola.jpg?fit=1200%2C798&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":13372,"url":"https:\/\/www.oilnewskenya.com\/index.php\/azule-energy-signs-main-contracts-for-the-agogo-integrated-west-hub-development-project\/","url_meta":{"origin":14353,"position":2},"title":"ANGOLA: Azule Energy Signs Main Contracts for the Agogo Integrated West Hub Development Project","author":"","date":"March 1, 2023","format":false,"excerpt":"Azule Energy, via its wholly owned subsidiary Eni Angola SPA (Eni), together with its Partners in the Block 15\/06, Sonangol P&P and SSI Fifteen Limited, are pleased to announce the award of the main contracts for the development of the Agogo Integrated West Hub Development Project, one of the major\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Angola-Block-15-06.jpg?fit=750%2C362&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Angola-Block-15-06.jpg?fit=750%2C362&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Angola-Block-15-06.jpg?fit=750%2C362&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Angola-Block-15-06.jpg?fit=750%2C362&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13536,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-saipem-awarded-new-offshore-epci-contract-at-the-agogo-full-field-development-project\/","url_meta":{"origin":14353,"position":3},"title":"ANGOLA: Saipem Awarded New Offshore EPCI Contract at the Agogo Full Field Development project","author":"","date":"April 4, 2023","format":false,"excerpt":"The first contract has been assigned by\u00a0Azule Energy for the Agogo Full Field Development project, a deepwater greenfield development, approximately 180 kilometres offshore Angola, about 20 kilometres west of the N\u2019Goma FPSO (West Hub), which has been in operation since November 2014. The contract encompasses the Engineering, Procurement, Construction and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Saipem-Scarabeo-9.jpg?fit=620%2C425&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Saipem-Scarabeo-9.jpg?fit=620%2C425&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Saipem-Scarabeo-9.jpg?fit=620%2C425&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11406,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-icr-secures-long-term-hire-contract-with-aker-solutions-for-bps-offshore-assets\/","url_meta":{"origin":14353,"position":4},"title":"ANGOLA: ICR Secures Long-term Hire Contract With Aker Solutions for BP\u2019s Offshore Assets","author":"","date":"December 16, 2021","format":false,"excerpt":"ICR Integrity (ICR),\u00a0global provider of specialist maintenance, integrity, and inspection solutions,\u00a0has been awarded a long-term hire contract with Aker Solutions for the provision of Quickflange\u2122 weldless connections for bp\u2019s offshore assets in Angola. The award recognizes ICR\u2019s commitment to growing the business further in West Africa having appointed Petrowork as\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/ICR-Technician-working-in-Angola.png?fit=958%2C640&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/ICR-Technician-working-in-Angola.png?fit=958%2C640&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/ICR-Technician-working-in-Angola.png?fit=958%2C640&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/ICR-Technician-working-in-Angola.png?fit=958%2C640&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14169,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-futureon-awarded-contract-to-supply-fieldtwin-to-azule-energy\/","url_meta":{"origin":14353,"position":5},"title":"ANGOLA: FutureOn Awarded Contract to Supply\u00a0FieldTwin to Azule Energy","author":"","date":"January 11, 2024","format":false,"excerpt":"FutureOn has gained its first foothold in West Africa securing a three-year contract with option to extend, to supply FieldTwin, its world-leading digital design and visualization platform, to Azule Energy. Angola-based Azule Energy \u2013 a standalone integrated energy company combining the local assets of bp and eni \u2013 will use\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/FutureOn.png?fit=1024%2C535&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/FutureOn.png?fit=1024%2C535&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/FutureOn.png?fit=1024%2C535&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/FutureOn.png?fit=1024%2C535&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=14353"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14353\/revisions"}],"predecessor-version":[{"id":14355,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14353\/revisions\/14355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/14354"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=14353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=14353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=14353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}