{"id":14314,"date":"2024-05-10T11:58:38","date_gmt":"2024-05-10T11:58:38","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=14314"},"modified":"2024-05-10T11:58:38","modified_gmt":"2024-05-10T11:58:38","slug":"tanzania-aminex-provides-update-on-ntorya-to-madimba-pipeline","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-aminex-provides-update-on-ntorya-to-madimba-pipeline\/","title":{"rendered":"TANZANIA: Aminex Provides Update on Ntorya to Madimba Pipeline"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Aminex has announce that during a recent operations meeting in\u00a0Muscat, Oman\u00a0with ARA Petroleum Tanzania (APT) and\u00a0Aminex, the\u00a0Tanzania Petroleum Development Corporation (TPDC)\u00a0updated the joint venture partners on its progress to construct a pipeline spur from Ntorya to the Madimba gas processing plant (the Pipeline). The TPDC told\u00a0Aminex\u00a0and APT that:\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;It has acquired the land required for the Pipeline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;It has completed all front-end engineering and design works required for the construction of a 35km pipeline to connect to the TPDC&#8217;s existing processing and transmission infrastructure at Madimba.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;It is in the process of completing the necessary Environmental Impact Study in relation to the construction of the Pipeline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;It expects to issue a tender for the construction of the Pipeline in&nbsp;July 2024.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The TPDC is responsible for the Pipeline&#8217;s construction. At the meeting with&nbsp;Aminex&nbsp;and ARA, it reiterated its, and the Tanzanian Government&#8217;s, firm commitment to achieving first gas as soon as possible, with a deadline of no later than mid-2025.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Charles Santos, Executive Chairman of&nbsp;Aminex&nbsp;commented:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>&#8220;We are very appreciative of the TPDC&#8217;s update on the Pipeline, the construction of which is a critical milestone in bringing Ntorya gas to the people of&nbsp;Tanzania. We wish to note the professionalism and commitment of the TPDC and highlight the importance the Tanzanian Government attaches to completing the Pipeline as soon as possible. This commitment is rooted in Ntorya&#8217;s importance in helping to relieve energy poverty and improve energy security for the people of&nbsp;Tanzania. Although this construction is outside our control, we will endeavour to keep shareholders updated as we receive information from the TPDC as construction proceeds&#8221;.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aminex has announce that during a recent operations meeting in\u00a0Muscat, Oman\u00a0with ARA Petroleum Tanzania (APT) and\u00a0Aminex, the\u00a0Tanzania Petroleum Development Corporation (TPDC)\u00a0updated the joint venture partners on its progress to construct &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-aminex-provides-update-on-ntorya-to-madimba-pipeline\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":14315,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[137,6954,1473,1784,2042,2466,2543],"class_list":["post-14314","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-aminex","tag-ara-petroleum","tag-madimba","tag-ntorya","tag-pipeline","tag-tanzania","tag-tpdc","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/05\/Tanzania-Aminex.jpg?fit=1357%2C1841&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3IS","jetpack-related-posts":[{"id":14761,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-award-of-the-epc-contract-for-the-ntorya-to-madimba-pipeline-expected-soon\/","url_meta":{"origin":14314,"position":0},"title":"TANZANIA: Award of the EPC Contract for the Ntorya to Madimba Pipeline Expected Soon","author":"","date":"March 18, 2025","format":false,"excerpt":"Aminex reports that the process for the award of the Ntorya to Madimba Pipeline EPC contract is almost complete and the company expects to receive further news from the TPDC shortly. This results from the\u00a0Tanzania Petroleum Development Corporation (TPDC) restrictive tender for the procurement of an engineering, procurement and construction\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/Tanzania-Aminex-2.jpg?fit=885%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/Tanzania-Aminex-2.jpg?fit=885%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/Tanzania-Aminex-2.jpg?fit=885%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/Tanzania-Aminex-2.jpg?fit=885%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14160,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ruvuma-gas-sales-agreement-signed\/","url_meta":{"origin":14314,"position":1},"title":"TANZANIA: Ruvuma Gas Sales Agreement Signed","author":"","date":"January 11, 2024","format":false,"excerpt":"Aminex PLC has announce that a gas sales agreement (GSA) for the sale of gas from the Ntorya location was signed by the Company\u2019s subsidiary, Ndovu Resources Limited, together with the operator, ARA Petroleum Tanzania Limited (APT) and the Tanzania Petroleum Development Corporation (TPDC). Key terms of the GSA include:\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13379,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ara-petroleum-to-delay-spudding-of-chikumbi-1-as-3d-seismic-processing-interpretation-continues\/","url_meta":{"origin":14314,"position":2},"title":"TANZANIA: ARA Petroleum to Delay Spudding of Chikumbi-1 as 3D Seismic Processing &#038; Interpretation Continues","author":"","date":"March 2, 2023","format":false,"excerpt":"Aminex reports that has been informed by ARA Petroleum Tanzania Limited (APT), theOperator of the Ruvuma PSA, of a further delay to the spudding of the Chikumbi-1 well (CH-1). Aminexis pleased to announce that plans to accelerate gas production, as outlined in our announcement of 1November 2022, have been further\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12868,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ruvuma-psa-jv-signed-an-addendum-to-the-psa\/","url_meta":{"origin":14314,"position":3},"title":"TANZANIA: Ruvuma PSA JV Signs an Addendum to the PSA","author":"","date":"November 28, 2022","format":false,"excerpt":"On 25 November 2022, at the Tanzania Petroleum Development Corporation (TPDC) headquarters in Dar es Salaam, the parties to the Ruvuma PSA signed an addendum to the PSA. The Ruvuma PSA, as with all other PSAs in Tanzania, contained profit share, royalty, and taxation rates only for oil production. The\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14289,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-aminex-releases-positive-outlook-terms-2024-as-decisive\/","url_meta":{"origin":14314,"position":4},"title":"TANZANIA: Aminex Releases Positive Outlook Terms 2024 as Decisive","author":"","date":"April 29, 2024","format":false,"excerpt":"Outlook: \u2022\u00a0\u00a0\u00a0\u00a0\u00a0The operator of the Ruvuma PSA,\u00a0ARA Petroleum Tanzania Limited\u00a0(APT) continues to progress operations at the Ntorya gas field, with the following planned for 2024, upon receipt of the Development Licence: o\u00a0\u00a0Contract a rig operator to undertake the drilling of the Chikumbi-1 appraisal well and, if successful, to complete the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/04\/Tanzania-Aminex.jpg?fit=885%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/04\/Tanzania-Aminex.jpg?fit=885%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/04\/Tanzania-Aminex.jpg?fit=885%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/04\/Tanzania-Aminex.jpg?fit=885%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":15163,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-work-on-the-ntorya-pipeline-to-commence-this-month\/","url_meta":{"origin":14314,"position":5},"title":"TANZANIA: Work on the Ntorya Pipeline to Commence this month","author":"","date":"July 17, 2025","format":false,"excerpt":"Aminex has provided the following operations update on the Ntorya development: \u00b7\u00a0\u00a0\u00a0\u00a0At the end of last week, the\u00a0Tanzania Petroleum Development Corporation (TPDC)\u00a0formally notified the operator of the Ntorya development (ARA Petroleum Tanzania Limited\u00a0(APT)) that construction of the pipeline from the Ntorya gas field to the Ntorya gas field(the Pipeline) shall\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=14314"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14314\/revisions"}],"predecessor-version":[{"id":14316,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14314\/revisions\/14316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/14315"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=14314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=14314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=14314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}