{"id":14008,"date":"2023-10-24T13:36:32","date_gmt":"2023-10-24T13:36:32","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=14008"},"modified":"2023-10-24T13:47:50","modified_gmt":"2023-10-24T13:47:50","slug":"zimbabwe-mukuyu-2-drilling-update-elevated-gas-shows-resistivity-encountered-in-upper-angwa","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-drilling-update-elevated-gas-shows-resistivity-encountered-in-upper-angwa\/","title":{"rendered":"ZIMBABWE: Mukuyu-2 drilling update: Elevated Gas Shows &#038; Resistivity Encountered in Upper Angwa"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Progress and current operations<br><\/strong>Since the last update, the 9 \u215d\u201d casing was set and the choke manifold for the blow out preventer (BOP) was changed out prior to commencement of drilling the 8\u00bd\u201d hole section, which has reached the current depth of 2,745 metres Measured Depth (mMD).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Elevated mud gas peaks (up to 70 times above background gas baseline) have been observed while drilling to 2,582 mMD with marked increases from C1 to C5 compounds (methane, ethane, propane, butanes and pentanes). Elevated LWD resistivity and low Gamma Ray readings across this interval coincided with a drilling break and subsequent losses of drilling mud to the formation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Drilling progress was slowed due to repairs to the top drive system, which have now been completed and remedying of mud losses to the formation.<br>Total background gas is higher than those observed in Mukuyu-1 and heavier hydrocarbons (C4 and C5) have been detected, providing further evidence of an active petroleum system in the basin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Forward plan<br><\/strong>Following the change out of the drill bit and batteries for the LWD tools, the Exalo 202 Rig will recommence drilling through the primary targets in the Upper Angwa (Alternations Member) and to the Lower Angwa (Massive Member) to approximately 3,750 metres MD before running a wireline logging evaluation suite.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Comments from Managing Director Scott Macmillan:<br>\u201cWe have encouraging signs in our Upper Angwa primary target, which has shown elevated gas readings including heavier hydrocarbons and elevated LWD resistivity across the zones of interest.<br>\u201cThe presence of elevated mud gas readings combined with elevated LWD resistivity and increasing background gas with depth is a positive sign as we progress through the Upper Angwa Alternations Member.<br>\u201cFollowing a drill bit change, we are preparing to drill a further 1,000 metres to our planned total depth of 3,750 metres through the remaining Upper Angwa and into additional potential in the untested Lower Angwa.<br>\u201cOnce total depth is reached a comprehensive wireline logging programme to evaluate results will follow, with the aim of confirming the presence of moveable hydrocarbons in multiple zones.<br>\u201cThe well remains on track to be completed in the forecast 50 to 60 days.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Progress and current operationsSince the last update, the 9 \u215d\u201d casing was set and the choke manifold for the blow out preventer (BOP) was changed out prior to commencement of &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-drilling-update-elevated-gas-shows-resistivity-encountered-in-upper-angwa\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":14009,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[7812,10413,10938,11370,11368],"class_list":["post-14008","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-invictus-energy","tag-mukuyu-1","tag-mukuyu-2","tag-scott-macmillan","tag-upper-angwa","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig.jpeg?fit=1024%2C681&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3DW","jetpack-related-posts":[{"id":12803,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-drilling-indicates-elevated-gas-shows-fluorescence-confirms-working-hydrocarbon-system\/","url_meta":{"origin":14008,"position":0},"title":"ZIMBABWE: Mukuyu-1 Drilling Indicates Elevated Gas Shows &#038; Fluorescence Confirms Working Hydrocarbon System","author":"","date":"November 11, 2022","format":false,"excerpt":"\u2022 Fluorescence and elevated gas shows of up to 65 times above background levels in Upper Angwa primary target \u2022 Elevated gas shows and resistivity in shallower Pebbly Arkose formation \u2022 Working conventional hydrocarbon system confirmed in Cabora Bassa Basin \u2022 Preparing to drill ahead to planned total depth of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14020,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-wireline-logging-commences-as-mukuyu-2-well-has-reached-total-depth\/","url_meta":{"origin":14008,"position":1},"title":"ZIMBABWE: Wireline Logging Commences as Mukuyu-2 Well reaches Total Depth","author":"","date":"October 30, 2023","format":false,"excerpt":"Progress and current operationsSince the last update, the drill bit and bottom hole assembly (BHA) were changed out anddrilling of the 8\u00bd\u201d hole section and reached 3,718 metres Measured Depth (\u201cmMD\u201d) wheresection Total Depth (TD) was called. The 8\u00bd\u201d hole section has reached the current depth of3,296 metres Measured Depth\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12862,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-to-be-sidetracked-as-borehole-conditions-deteriorate\/","url_meta":{"origin":14008,"position":2},"title":"ZIMBABWE: Mukuyu-1 to be Sidetracked as Borehole Conditions Deteriorate","author":"","date":"November 27, 2022","format":false,"excerpt":"\u2022 Mukuyu-1 successfully deepened to 3,923 metres Measured Depth (\u201cmMD\u201d), encountering additional elevated gas shows and fluorescence through to total depth \u2022 Results prove up potential of the Upper Angwa formation over a 900m gross interval \u2022 Upper Angwa formation thicker than pre-drill estimates, boding well for future prospectivity in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14062,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-moves-to-mukuyu-2-vertical-sidetrack-to-overcome-borehole-conditions-well-control-challenges\/","url_meta":{"origin":14008,"position":3},"title":"ZIMBABWE: Invictus Energy Moves to Mukuyu-2 Vertical Sidetrack to Overcome Borehole Conditions &#038; Well Control Challenges","author":"","date":"November 21, 2023","format":false,"excerpt":"Gas recovery and wireline data provides confirmation of moveable hydrocarbonsInvictus reports that the exploration team has successfully recovered natural gas (predominantlymethane and trace heavier hydrocarbons) to surface from the Pebbly Arkose formation and continued pipe conveyed logging operations due to challenging borehole conditions. Additionally Invictus says, wireline logging data from\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":14073,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-successfully-kicks-off-the-mukuyu-2-sidetrack-well\/","url_meta":{"origin":14008,"position":4},"title":"ZIMBABWE: Invictus Energy Successfully Kicks-off the Mukuyu-2 Sidetrack Well","author":"","date":"November 27, 2023","format":false,"excerpt":"Invictus Energy has announced that the Mukuyu-2 well was plugged back with cement above the 9\u215d\u201d casing shoe (at approximately 1,966m Measured Depth (mMD) and drilling to kickoff the Mukuyu-2 ST1 (sidetrack) well was initiated and successfully achieved with 100% new formation drilled. Following the successful kickoff of the 8\u00bd\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack-1.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13183,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-evaluation-update-operations-completed-phase-2-campaign-planning-commenced\/","url_meta":{"origin":14008,"position":5},"title":"ZIMBABWE: Mukuyu-1 Evaluation Update, Operations Completed &#038; Phase 2 Campaign Planning Commenced","author":"","date":"January 23, 2023","format":false,"excerpt":"HIGHLIGHTS \u2022 Mukuyu-1 ST1 identifies 13 potential hydrocarbon bearing zones \u2022 Combined 225m gross potential hydrocarbon bearing zones identified in primary Upper Angwa target \u2022 Mukuyu-1 ST1 operations completed \u2022 Rig 202 is rigged down in preparation for maintenance and upgrades \u2022 Planning commenced for Mukuyu appraisal & Phase 2\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?fit=615%2C331&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?fit=615%2C331&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?fit=615%2C331&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=14008"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14008\/revisions"}],"predecessor-version":[{"id":14013,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/14008\/revisions\/14013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/14009"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=14008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=14008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=14008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}