{"id":13933,"date":"2023-09-13T11:17:01","date_gmt":"2023-09-13T11:17:01","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13933"},"modified":"2023-09-13T11:17:01","modified_gmt":"2023-09-13T11:17:01","slug":"gabon-bw-energy-starts-production-from-fourth-well-in-the-hibiscus-ruche-development","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-starts-production-from-fourth-well-in-the-hibiscus-ruche-development\/","title":{"rendered":"GABON: BW Energy starts production from fourth well in the Hibiscus \/ Ruche development"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">BW Energy is pleased to announce that production has safely started from the fourth well of the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon. Well performance is in line with expectations with current production at approximately 6,500 barrels per day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The DHIBM-6H well was drilled as a horizontal well from the MaBoMo production facility to a total depth of 4,125 metres into Gamba sandstone reservoir at the Hibiscus field. Following completion, the Borr Norve jack-up has commenced drilling operations on the fifth production well DRM-3H. This will be the first Ruche Gamba well in this drilling campaign.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;The drilling program progresses as planned with strong HSE results and robust production rates which support our expectations of successive production growth in Gabon into 2024. We consistently receive well data confirming excellent reservoir quality, with potential positive implications for Hibiscus reserve estimates,\u201d said Carl Krogh Arnet, the CEO of BW Energy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As previously communicated, DHIBM-3H and -4H have experienced issues with the ESPs (electrical submersible pumps). Investigations into the cause are ongoing. DHIBM-4H is currently flowing naturally at 2,800 barrels per day, while DHIBM-3H is temporarily&nbsp; not producing while we continue to work solutions. Current gross production from the Dussafu license is now approximately 26,500 barrels per day after the fourth Hibiscus well came onstream.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The drilling campaign targets four Hibiscus Gamba and two Ruche Gamba wells which are expected to bring the total oil production up to approximately 40,000 barrels per day when all wells are completed in early 2024. The oil produced at Hibiscus \/ Ruche is transported by pipeline to the BW Adolo FPSO for processing and storage before offloading to export tankers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BW Energy is pleased to announce that production has safely started from the fourth well of the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon. Well &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-starts-production-from-fourth-well-in-the-hibiscus-ruche-development\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13934,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7447,7442,11],"tags":[9555,7742,11339,11341,11176,944,11152,11292,11340,11338],"class_list":["post-13933","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-central-africa","category-countries","category-top-news","tag-borr-norve-jack-up","tag-bw-energy","tag-dhibm-6h-well","tag-drm-3h","tag-dussafu-licence","tag-gabon","tag-hibiscus-ruche-2","tag-hibiscus-gamba","tag-mabomo","tag-ruche-gamba","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3CJ","jetpack-related-posts":[{"id":13829,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-starts-production-from-third-well-in-the-hibiscus-ruche-development\/","url_meta":{"origin":13933,"position":0},"title":"GABON: BW Energy Starts Production from third well in the Hibiscus \/ Ruche development\u00a0\u00a0","author":"","date":"July 25, 2023","format":false,"excerpt":"BW Energy is pleased to announce that production has safely started from the third well of the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon. Well performance is in line with expectations with current production at approximately 6,000 barrels per day.\u00a0 The DHIBM-5H well was drilled\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13562,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-announces-first-oil-from-hibiscus-ruche-development\/","url_meta":{"origin":13933,"position":1},"title":"GABON: BW Energy Announces First oil from Hibiscus \/ Ruche development","author":"","date":"April 12, 2023","format":false,"excerpt":"BW Energy is pleased to announce that first oil from the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon has been safely achieved. Production performance from the first well has been in line with expectations and is currently stabilised at approximately 6,000 barrels per day.\u00a0 \"We\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu-1.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu-1.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu-1.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu-1.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13124,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-development-drilling-commences-on-schedule-at-dussafu-marin\/","url_meta":{"origin":13933,"position":2},"title":"GABON: Development Drilling Commences on Schedule at Dussafu Marin","author":"","date":"January 11, 2023","format":false,"excerpt":"Production drilling at the Hibiscus Ruche Phase I development commenced in early January with first oil expected during March 2023, in line with previously communicated guidance. At the Tortue field installation of the new gas lift compressor is underway onboard the FPSO BW Adolo and is also progressing according to\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Gabon-Hubiscus.jpg?fit=496%2C416&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13542,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-completes-drilling-operations-on-first-hibiscus-production-well\/","url_meta":{"origin":13933,"position":3},"title":"GABON: BW Energy Completes Drilling operations on first Hibiscus Production Well","author":"","date":"April 4, 2023","format":false,"excerpt":"BW Energy has completed the drilling and completion operations on DHIBM-3H, the first production well of the Hibiscus \/ Ruche Phase 1 development campaign in the Dussafu licence offshore Gabon. Responsibility for the DHIBM-3H well has been handed over to the production team which will finalise preparations for production start-up.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10239,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-re-starts-3-well-drilling-campaign-on-the-dussafu-license\/","url_meta":{"origin":13933,"position":4},"title":"GABON: BW Energy Re-starts 3-well Drilling Campaign on the Dussafu license","author":"","date":"April 22, 2021","format":false,"excerpt":"BW Energy Limited is pleased to announce the re-start of a three-well drilling campaign on the Dussafu license offshore Gabon consisting of two exploration wells in the Hibiscus area and one production well on the Tortue field. The Borr Norve jack-up rig has been contracted for the campaign. The current\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Gabon-Hubiscus.jpg?fit=496%2C416&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":14254,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-starts-production-from-hibiscus-south-field\/","url_meta":{"origin":13933,"position":5},"title":"GABON: BW Energy Starts Production from Hibiscus South Field","author":"","date":"March 10, 2024","format":false,"excerpt":"BW Energy has announced that production has safely started from the DHBSM-1H well in the Hibiscus South field on the Dussafu Licence offshore Gabon five months after the initial discovery was made in November 2023. Production performance from the well has been in line with expectations and is currently stabilised\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/03\/Gabon-Dussafu.webp?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/03\/Gabon-Dussafu.webp?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/03\/Gabon-Dussafu.webp?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/03\/Gabon-Dussafu.webp?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13933"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13933\/revisions"}],"predecessor-version":[{"id":13935,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13933\/revisions\/13935"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13934"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}