{"id":13867,"date":"2023-08-11T08:27:11","date_gmt":"2023-08-11T08:27:11","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13867"},"modified":"2023-08-11T08:27:11","modified_gmt":"2023-08-11T08:27:11","slug":"zimbabwe-rig-mobilisation-to-mukuyu-2-commences","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-rig-mobilisation-to-mukuyu-2-commences\/","title":{"rendered":"ZIMBABWE: Rig Mobilisation to Mukuyu-2 Commences"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Invictus Energy has announced the commencement of the Exalo Rig 202 mobilisation to Mukuyu-2 wellsite at its 80% owned and operated Cabora Bassa Project in Zimbabwe.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Comments from Managing Director Scott Macmillan:<br><em>\u201cThe commencement of the rig mobilisation marks another milestone in the project as we prepare to commence drilling the Mukuyu-2 appraisal well as a follow up from our highly successful basin opening Mukuyu-1\/ST-1 well to confirm a discovery.<br>\u201cThe Mukuyu-2 well will be located approximately 6.8km north-east from Mukuyu-1 and over 400m updip at the primary Upper Angwa target, which provides the potential to prove up a material discovery upon success.<br>\u201cMukuyu-2 will be a near vertical well with a planned total depth of approximately 3,700m, which will also enable us to penetrate the untested Lower Angwa reservoirs in this location.<br>\u201cThe preparation of the well services equipment to be followed by independent QAQC ahead of mobilisation to the Mukuyu-2 wellsite is well underway and we remain on track to spud in<br>September.\u201d<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mukuyu-2 wellpad construction completed<br>The Mukuyu-2 wellpad construction has been completed following the finalisation of civil works including pad levelling and compaction, water supply and reservoirs. The wellsite has been inspected by the Environmental Management Authority and approved in accordance with the Environmental Management Plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following the completion of the rig move to Mukuyu-2, Rig 202 will be rigged up and then undergo commission of the new mud tank system and rig acceptance.<br>Mukuyu-2 is located approximately 6.8km to the north-east of Mukuyu-1, targeting a prominent horst block within the greater Mukuyu structural closure.<br>The primary target interval, the Triassic Upper Angwa Formation, sits approximately 400m shallower at Mukuyu-2 than at Mukuyu-1. This location will provide excellent information on the distribution and reservoir quality of Upper Angwa sands.<br>The Mukuyu-2 well trajectory is planned to be near vertical from the surface location (maximum inclination of 12\u00b0) to provide optimal penetration of several stratigraphic intervals within the same structural horst block, while minimising operational complexity for both drilling and formation evaluation activities.<br>The well will also penetrate multiple additional targets including the Dande (JurassicCretaceous), Forest and Pebbly Arkose (both Triassic) Formations within the Mukuyu anticline in the central horst structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The well will be drilled to a planned total depth of approximately 3,700m to penetrate seismic reflectors interpreted to be the Lower Angwa sequence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mukuyu-2 is on track to spud in September.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Invictus Energy has announced the commencement of the Exalo Rig 202 mobilisation to Mukuyu-2 wellsite at its 80% owned and operated Cabora Bassa Project in Zimbabwe. Comments from Managing Director &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-rig-mobilisation-to-mukuyu-2-commences\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13868,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[7808,10170,2767],"class_list":["post-13867","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-cabora-bassa","tag-exalo-rig-202","tag-zimbabwe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/08\/ZIMBABWE-Mukuyu-2-wellsite.png?fit=606%2C455&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3BF","jetpack-related-posts":[{"id":13625,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-and-phase-2-exploration-commences\/","url_meta":{"origin":13867,"position":0},"title":"ZIMBABWE: Mukuyu-2 Appraisal and Phase 2 Exploration Commences","author":"","date":"April 28, 2023","format":false,"excerpt":"During the quarter, Invictus commenced preparations for the Mukuyu-2 appraisal well andPhase 2 exploration campaign at its 80 per cent owned and operated Cabora Bassa project inZimbabwe.The tendering process commenced during the quarter for minor additional long leads and well services for the Mukuyu-2 well, which is anticipated to spud\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12324,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-commences-rig-mobilization-to-cabora-bassa\/","url_meta":{"origin":13867,"position":1},"title":"ZIMBABWE: Invictus Energy Commences Rig Mobilization to Cabora Bassa","author":"","date":"June 8, 2022","format":false,"excerpt":"Invictus Energy has confirmed that following the completion of clearing procedures and documentation, the Exalo Rig 202 has commenced mobilization from Songo Songo Island in Tanzania to Cabora Bassa. The rig and associated equipment will arrive over the course of June and commence rig up to drill the first of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/06\/Exalo-202-Rig-Mobilization.png?fit=485%2C643&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12397,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-reports-2-7-fold-in-mukuyu-prospect-assessment\/","url_meta":{"origin":13867,"position":2},"title":"ZIMBABWE: Invictus Energy Reports 2.7-fold in Mukuyu Prospect Assessment","author":"","date":"July 5, 2022","format":false,"excerpt":"Invictus Energy reports it has received an updated Independent Report from ERCE estimating substantial resource potential at its Cabora Bassa Project. ERCE estimates the gross mean recoverable conventional potential of the Mukuyu prospect at a combined 20 Tcf and 845 million barrels of conventional gas condensate, or about 4.3 billion\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/Exalo-Rug-202-Mud-Pumps-in-Transit-to-Zimbabwe.png?fit=606%2C319&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/Exalo-Rug-202-Mud-Pumps-in-Transit-to-Zimbabwe.png?fit=606%2C319&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/Exalo-Rug-202-Mud-Pumps-in-Transit-to-Zimbabwe.png?fit=606%2C319&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13061,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mukuyu-1-and-sidetrack-final-well-results-and-rig-202-secured-for-further-12-months\/","url_meta":{"origin":13867,"position":3},"title":"ZIMBABWE: Mukuyu-1 and sidetrack final well results and Exalo Rig 202 secured for further 12 months","author":"","date":"January 3, 2023","format":false,"excerpt":"Since the last update, the drill string was rigged up to conduct fishing operations to attempt to retrieve the wireline formation testing tool. The drill string with the overshot was run in hole to the casing shoe to commence installation of the side entry sub to allow for allow wireline\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13818,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-well-location-selected-ahead-of-spudding-in-q3-2023\/","url_meta":{"origin":13867,"position":4},"title":"ZIMBABWE: Mukuyu-2 Appraisal Well Location Selected Ahead of Spudding in Q3 2023","author":"","date":"July 17, 2023","format":false,"excerpt":"Invictus Energy Limited has provided an update on the Mukuyu-2 appraisal well, a follow up to the successful, play-opening Mukuyu-1 well in the Cabora Bassa Basin in Zimbabwe. Comments from Managing Director Scott Macmillan:\u201cSelection of the Mukuyu-2 appraisal well location, refinement of the well trajectory and drillingplans have been completed\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13339,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-commences-mukuyu-2-appraisal-well-program-phase-2-exploration\/","url_meta":{"origin":13867,"position":5},"title":"ZIMBABWE: Invictus Energy Commences Mukuyu-2 Appraisal Well Program &#038; Phase 2 Exploration","author":"","date":"February 24, 2023","format":false,"excerpt":"\u2022 Appraisal program commences with Mukuyu-2 spud targeted for early Q3 2023\u2022 Well services and long lead process tendering commenced\u2022 Mukuyu-1 post well analysis of pressure data indicates potential for significant gascolumns in Pebbly Arkose and Upper Angwa\u2022 Industry interest received to partner in project and forward work program\u2022 2D\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13867"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13867\/revisions"}],"predecessor-version":[{"id":13869,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13867\/revisions\/13869"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13868"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}