{"id":13818,"date":"2023-07-17T09:53:57","date_gmt":"2023-07-17T09:53:57","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13818"},"modified":"2023-07-17T09:53:57","modified_gmt":"2023-07-17T09:53:57","slug":"zimbabwe-mukuyu-2-appraisal-well-location-selected-ahead-of-spudding-in-q3-2023","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-well-location-selected-ahead-of-spudding-in-q3-2023\/","title":{"rendered":"ZIMBABWE: Mukuyu-2 Appraisal Well Location Selected Ahead of Spudding in Q3 2023"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Invictus Energy Limited  has provided an update on the Mukuyu-2 appraisal well, a follow up to the successful, play-opening Mukuyu-1 well in the Cabora Bassa Basin in Zimbabwe.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Comments from Managing Director Scott Macmillan:<br><em>\u201cSelection of the Mukuyu-2 appraisal well location, refinement of the well trajectory and drilling<br>plans have been completed as we prepare to follow up from our highly successful basin opening<br>Mukuyu-1\/ST-1 well.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Mukuyu-2 well will be located approximately 6.8km north-east from Mukuyu-1 and over<br>400m updip at the primary Upper Angwa target, which provides the potential to prove up a<br>material discovery upon success.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mukuyu-2 will be a near vertical well with a planned total depth of approximately 3,700m, which<br>will also enable us to penetrate the untested Lower Angwa reservoirs in this location.<br>Preparations for the drilling of Mukuyu-2 are well underway and focused on leveraging the<br>insights from our previous campaign. The wellpad construction is progressing well and we remain<br>on schedule to spud in the third quarter of CY23.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201cMukuyu-1\/ST1 has already confirmed the presence of light oil, gas and helium, de-risking<br>drilling in the frontier Cabora Bassa Basin.<br>Success at Mukuyu-2 and confirmation of a significant discovery will further unlock the value of<br>our material portfolio and basin master position in the Cabora Bassa Basin.\u201d<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mukuyu-2 appraisal well location selected<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following completion of the refined seismic interpretation, incorporating results from the<br>Mukuyu-1\/ST-1 well, the Mukuyu-2 subsurface targets and appraisal well location have been<br>selected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mukuyu-2 will be located approximately 6.8km to the north-east of Mukuyu-1,<br>targeting a prominent horst block within the greater Mukuyu structural closure.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"610\" height=\"453\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-1.png?resize=610%2C453&#038;ssl=1\" alt=\"\" class=\"wp-image-13821\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-1.png?w=610&amp;ssl=1 610w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-1.png?resize=300%2C223&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-1.png?resize=100%2C74&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-1.png?resize=600%2C446&amp;ssl=1 600w\" sizes=\"auto, (max-width: 610px) 100vw, 610px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The primary target interval, the Triassic Upper Angwa Formation, sits approximately 400m<br>shallower at Mukuyu-2 than at Mukuyu-1. This location will provide excellent information on<br>the distribution and reservoir quality of Upper Angwa sands.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Mukuyu-2 well trajectory is planned to be near vertical from the surface<br>location (maximum inclination of 12\u00b0) to provide optimal penetration of several stratigraphic<br>intervals within the same structural horst block, while minimising operational complexity for<br>both drilling and formation evaluation activities.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"613\" height=\"496\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-trajectory.png?resize=613%2C496&#038;ssl=1\" alt=\"\" class=\"wp-image-13822\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-trajectory.png?w=613&amp;ssl=1 613w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-trajectory.png?resize=300%2C243&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-trajectory.png?resize=100%2C81&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-trajectory.png?resize=600%2C485&amp;ssl=1 600w\" sizes=\"auto, (max-width: 613px) 100vw, 613px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The well will also penetrate multiple additional targets including the Dande (JurassicCretaceous), Forest and Pebbly Arkose (both Triassic) Formations within the Mukuyu anticline in the central horst structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The well will be drilled to a planned total depth of approximately 3,700m to penetrate seismic<br>reflectors interpreted to be the Lower Angwa sequence. The Lower Angwa has reservoir<br>potential demonstrated from the outcrops of massive sandstones in the basin, but was not<br>penetrated by Mukuyu-1 as the Upper Angwa Formation was thicker than pre-drill prognosis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the Mukuyu-2 location, the Lower Angwa reservoirs are interpreted to be juxtaposed<br>against the Upper Angwa Formation, containing multiple mature source rock intervals<br>potentially in the light-oil \/ gas-condensate generation window and within the fetch area of<br>the basin depocenter to the north of Mukuyu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Given the early-stage exploration of the hydrocarbon habitat in the Cabora Bassa Basin, a<br>comprehensive formation evaluation program is planned which, in addition to the formation<br>pressure testing and fluid sampling, includes wireline logs, sidewall cores and a vertical<br>seismic profile (VSP).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This will provide critical information on the Mukuyu structure and contribute to the characterisation of the wider basin prospectivity where the Company has already mapped an extensive portfolio of prospects and leads. A number of these are expected to be matured into drill ready prospects as a result of the ongoing CB23 seismic survey.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the event of a successful appraisal result, the drilling program will allow for the suspension<br>of Mukuyu-2 for a future well test to confirm reservoir productivity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mukuyu-2 wellpad construction commenced<br><\/strong>Preparations for the drilling of Mukuyu-2 are well underway and are focused on leveraging<br>lessons and insights from Mukuyu-1 to improve the logistics, drilling efficiency and operational<br>risk profile of Mukuyu-2.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Civil engineering works have begun to prepare the wellsite for the arrival of the Exalo 202 Rig<br>(from its current location at the Mukuyu-1 wellsite) during July and August with drilling at Mukuyu-2 expected to begin later in Q3 CY23.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The drilling and logging operations, to a planned total depth of around 3,700m, are expected<br>to take 50-60 days.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Invictus Energy Limited has provided an update on the Mukuyu-2 appraisal well, a follow up to the successful, play-opening Mukuyu-1 well in the Cabora Bassa Basin in Zimbabwe. Comments from &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-well-location-selected-ahead-of-spudding-in-q3-2023\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13823,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[9258,11291,10938,2767],"class_list":["post-13818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-cabora-bassa-basin","tag-exalo-202-rig-2","tag-mukuyu-2","tag-zimbabwe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3AS","jetpack-related-posts":[{"id":13958,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-spuds-mukuyu-2\/","url_meta":{"origin":13818,"position":0},"title":"ZIMBABWE: Invictus Energy Spuds Mukuyu 2","author":"","date":"September 21, 2023","format":false,"excerpt":"Invictus Energy has announced the commencement of drilling of the Mukuyu-2 well at its 80% owned and operated Cabora Bassa Project in Zimbabwe.Comments from Managing Director Scott Macmillan: \u201cThis is an exciting and long-anticipated moment for Invictus and our shareholders, and the commencement of our second drilling campaign is a\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Zimbabwe-Mukuyu-2-trajectory.png?fit=613%2C496&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Zimbabwe-Mukuyu-2-trajectory.png?fit=613%2C496&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Zimbabwe-Mukuyu-2-trajectory.png?fit=613%2C496&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13625,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-and-phase-2-exploration-commences\/","url_meta":{"origin":13818,"position":1},"title":"ZIMBABWE: Mukuyu-2 Appraisal and Phase 2 Exploration Commences","author":"","date":"April 28, 2023","format":false,"excerpt":"During the quarter, Invictus commenced preparations for the Mukuyu-2 appraisal well andPhase 2 exploration campaign at its 80 per cent owned and operated Cabora Bassa project inZimbabwe.The tendering process commenced during the quarter for minor additional long leads and well services for the Mukuyu-2 well, which is anticipated to spud\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13657,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-hopes-to-raise-up-to-a20m-to-fund-exploration-and-appraisal-work-in-cabora-bassa-basin\/","url_meta":{"origin":13818,"position":2},"title":"ZIMBABWE: Invictus Energy Hopes to Raise up to A$20m to fund exploration and appraisal work in Cabora Bassa basin","author":"","date":"May 3, 2023","format":false,"excerpt":"Invictus Energy has launched a Share Purchase Plan and the shortfall offer to raise up to A$10m to fund exploration and appraisal work in Zimbabwe's Cabora Bassa basin. Invictus had already raised $8,745,000 under the Placement and is also seeking shareholder approval at the General Meeting to raise a further\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/05\/Zimbabwe-cabora-basin-license-map.png?fit=632%2C432&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/05\/Zimbabwe-cabora-basin-license-map.png?fit=632%2C432&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/05\/Zimbabwe-cabora-basin-license-map.png?fit=632%2C432&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13339,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-commences-mukuyu-2-appraisal-well-program-phase-2-exploration\/","url_meta":{"origin":13818,"position":3},"title":"ZIMBABWE: Invictus Energy Commences Mukuyu-2 Appraisal Well Program &#038; Phase 2 Exploration","author":"","date":"February 24, 2023","format":false,"excerpt":"\u2022 Appraisal program commences with Mukuyu-2 spud targeted for early Q3 2023\u2022 Well services and long lead process tendering commenced\u2022 Mukuyu-1 post well analysis of pressure data indicates potential for significant gascolumns in Pebbly Arkose and Upper Angwa\u2022 Industry interest received to partner in project and forward work program\u2022 2D\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13556,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-raises-10m-to-fund-mukuyu-2-well-preparations-phase-2-exploration\/","url_meta":{"origin":13818,"position":4},"title":"ZIMBABWE: Invictus Raises $10M to Fund Mukuyu-2 Well Preparations &#038; Phase 2 Exploration","author":"","date":"April 12, 2023","format":false,"excerpt":"Invictus Energy has announced a private Placement to raise $10.0m, at $0.12 per share, following the Company\u2019s decision to advance preparations for an appraisal and exploration campaign in Zimbabwe\u2019s Cabora Bassa Basin. Comments from Managing Director Scott Macmillan:\u201cI am pleased with the backing Invictus has received from both existing and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13867,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-rig-mobilisation-to-mukuyu-2-commences\/","url_meta":{"origin":13818,"position":5},"title":"ZIMBABWE: Rig Mobilisation to Mukuyu-2 Commences","author":"","date":"August 11, 2023","format":false,"excerpt":"Invictus Energy has announced the commencement of the Exalo Rig 202 mobilisation to Mukuyu-2 wellsite at its 80% owned and operated Cabora Bassa Project in Zimbabwe. Comments from Managing Director Scott Macmillan:\u201cThe commencement of the rig mobilisation marks another milestone in the project as we prepare to commence drilling the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/08\/ZIMBABWE-Mukuyu-2-wellsite.png?fit=606%2C455&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/08\/ZIMBABWE-Mukuyu-2-wellsite.png?fit=606%2C455&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/08\/ZIMBABWE-Mukuyu-2-wellsite.png?fit=606%2C455&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13818"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13818\/revisions"}],"predecessor-version":[{"id":13824,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13818\/revisions\/13824"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13823"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}