{"id":13562,"date":"2023-04-12T17:20:32","date_gmt":"2023-04-12T17:20:32","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13562"},"modified":"2023-04-12T17:20:32","modified_gmt":"2023-04-12T17:20:32","slug":"gabon-bw-energy-announces-first-oil-from-hibiscus-ruche-development","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-announces-first-oil-from-hibiscus-ruche-development\/","title":{"rendered":"GABON: BW Energy Announces First oil from Hibiscus \/ Ruche development"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">BW Energy is pleased to announce that first oil from the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon has been safely achieved. Production performance from the first well has been in line with expectations and is currently stabilised at approximately 6,000 barrels per day.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;We delivered first oil from Hibiscus \/ Ruche on schedule with an excellent HSE performance. This represents the first of several steps on a path for successive production growth in Gabon as we complete the drilling program and asset upgrades through 2023 and into early 2024,\u201d said Carl Krogh Arnet, the CEO of BW Energy.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The DHIBM-3H well was drilled from the BW MaBoMo production facility to a depth of 3,883 metres into Gamba sandstone reservoir on the Hibiscus field. Drilling operations commenced at the start of the year following the successful installation of the production facility, risers, and pipelines. The oil produced at Hibiscus \/ Ruche is transported by pipeline to the BW Adolo FPSO for processing and storage before offloading to oil tankers.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Hibiscus \/ Ruche Phase 1 drilling campaign targets four Hibiscus Gamba and two Ruche Gamba wells which are expected to add approximately 30,000 barrels per day of total oil production when all wells are completed in early 2024. The wells are drilled by the Borr Norve jackup rig.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separately, the installation of the gas lift compressor is ongoing on the BW Adolo with focus on commissioning and start-up following first oil from Hibiscus \/ Ruche, which had priority during the high-activity period onboard the FPSO.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Our priority now is to complete start-up activities and stabilise production from the DHIBM-3H well.&nbsp; In parallel, work progresses towards start-up of the new gas lift compressor to support production from the existing six Tortue wells while also moving ahead with drilling of the next Hibiscus \/ Ruche production wells as planned,&#8221; said Carl K. Arnet.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BW Energy is pleased to announce that first oil from the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon has been safely achieved. Production performance from &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-announces-first-oil-from-hibiscus-ruche-development\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13563,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7447,11,7444],"tags":[10976,7742,11154,11176,944,11152],"class_list":["post-13562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-central-africa","category-top-news","category-west-africa","tag-bw-adolo","tag-bw-energy","tag-dhibm-3h-well","tag-dussafu-licence","tag-gabon","tag-hibiscus-ruche-2","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu-1.jpg?fit=1000%2C744&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3wK","jetpack-related-posts":[{"id":13933,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-starts-production-from-fourth-well-in-the-hibiscus-ruche-development\/","url_meta":{"origin":13562,"position":0},"title":"GABON: BW Energy starts production from fourth well in the Hibiscus \/ Ruche development","author":"","date":"September 13, 2023","format":false,"excerpt":"BW Energy is pleased to announce that production has safely started from the fourth well of the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon. Well performance is in line with expectations with current production at approximately 6,500 barrels per day. The DHIBM-6H well was drilled\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/09\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13542,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-completes-drilling-operations-on-first-hibiscus-production-well\/","url_meta":{"origin":13562,"position":1},"title":"GABON: BW Energy Completes Drilling operations on first Hibiscus Production Well","author":"","date":"April 4, 2023","format":false,"excerpt":"BW Energy has completed the drilling and completion operations on DHIBM-3H, the first production well of the Hibiscus \/ Ruche Phase 1 development campaign in the Dussafu licence offshore Gabon. Responsibility for the DHIBM-3H well has been handed over to the production team which will finalise preparations for production start-up.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13829,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-starts-production-from-third-well-in-the-hibiscus-ruche-development\/","url_meta":{"origin":13562,"position":2},"title":"GABON: BW Energy Starts Production from third well in the Hibiscus \/ Ruche development\u00a0\u00a0","author":"","date":"July 25, 2023","format":false,"excerpt":"BW Energy is pleased to announce that production has safely started from the third well of the Hibiscus \/ Ruche Phase 1 development in the Dussafu licence offshore Gabon. Well performance is in line with expectations with current production at approximately 6,000 barrels per day.\u00a0 The DHIBM-5H well was drilled\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14017,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-reports-increased-production-in-the-dussafu-licence\/","url_meta":{"origin":13562,"position":3},"title":"GABON: BW Energy Reports Increased Production in the Dussafu licence","author":"","date":"October 27, 2023","format":false,"excerpt":"Gross production from the operated assets was 27,400 barrels of oil per day in the\u202fthird quarter 2023. This included a full quarter of production from the Tortue and Hibiscus fields in the Dussafu licence (73.5% working interest) and production from the Golfinho field after assuming 100% ownership on 28 August.\u00a0\u00a0\u00a0\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Gabon-dussafu.jpg?fit=1000%2C744&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13124,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-development-drilling-commences-on-schedule-at-dussafu-marin\/","url_meta":{"origin":13562,"position":4},"title":"GABON: Development Drilling Commences on Schedule at Dussafu Marin","author":"","date":"January 11, 2023","format":false,"excerpt":"Production drilling at the Hibiscus Ruche Phase I development commenced in early January with first oil expected during March 2023, in line with previously communicated guidance. At the Tortue field installation of the new gas lift compressor is underway onboard the FPSO BW Adolo and is also progressing according to\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Gabon-Hubiscus.jpg?fit=496%2C416&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10239,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-bw-energy-re-starts-3-well-drilling-campaign-on-the-dussafu-license\/","url_meta":{"origin":13562,"position":5},"title":"GABON: BW Energy Re-starts 3-well Drilling Campaign on the Dussafu license","author":"","date":"April 22, 2021","format":false,"excerpt":"BW Energy Limited is pleased to announce the re-start of a three-well drilling campaign on the Dussafu license offshore Gabon consisting of two exploration wells in the Hibiscus area and one production well on the Tortue field. The Borr Norve jack-up rig has been contracted for the campaign. The current\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Gabon-Hubiscus.jpg?fit=496%2C416&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13562"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13562\/revisions"}],"predecessor-version":[{"id":13564,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13562\/revisions\/13564"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13563"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}