{"id":13472,"date":"2023-03-22T06:40:04","date_gmt":"2023-03-22T06:40:04","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13472"},"modified":"2023-03-22T06:40:04","modified_gmt":"2023-03-22T06:40:04","slug":"egypt-kuwait-energy-commences-production-from-the-ash-8-well","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-from-the-ash-8-well\/","title":{"rendered":"EGYPT: Kuwait Energy Commences Production from the ASH-8 well"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">United Oil &amp; Gas has announced an update on the ASH-8 development well (ASH-8) in the Abu Sennan licence, onshore\u00a0Egypt. United holds a 22% working interest in the licence, which is operated by Kuwait Energy Egypt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Summary<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;ASH-8 well commenced production on 16 March at an initial stabilised rate of c. 2,980 bopd and 2.64 mmscf\/d gross (c. 656 bopd and 0.58 mmscf\/d net)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Production has come onstream six weeks ahead of the anticipated schedule, at a higher rate than originally forecast resulting in group H1 production now expected to be at the upper end of the guided range of 700 &#8211; 900 bopd net<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ASH-8<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As previously announced, the ASH-8 development well was interpreted to have encountered\u00a022 metres of net oil pay in the primary\u00a0Alam El Bueib\u00a0(AEB) reservoir target, in line with pre-drill expectations. After reaching TD on the 21 February, the well was completed and tested on a number of different choke sizes, as summarised in the table below.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Choke Size<\/td><td>Duration of test<\/td><td>Average gross flow rate<\/td><\/tr><tr><td>Oil (bopd)<\/td><td>Gas (mmscf\/d)<\/td><td>Combined (boepd)<\/td><\/tr><tr><td>24\/64&#8243;<\/td><td>16.5 hours<\/td><td>1,737<\/td><td>2.2<\/td><td>2,177<\/td><\/tr><tr><td>32\/64&#8243;<\/td><td>6.5 hours<\/td><td>3,114<\/td><td>3.3<\/td><td>3,774<\/td><\/tr><tr><td>64\/64&#8243;<\/td><td>6.5 hours<\/td><td>6,023<\/td><td>8.2<\/td><td>7,663<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The well has now been tied into the existing facilities and brought on stream at an initial rate of c. 2,980 bopd and 2.64 mmscf\/d gross (656 bopd and 0.58 mmscf\/d net) on a 32\/64&#8243; choke. The production from the well will continue to be monitored, so that the long-term production potential can be assessed. However, the currently stable rates coupled with the lack of water-cut and the pressures observed in the well provide positive indicators for its longer-term potential. With the well coming onstream nearly six weeks ahead of schedule, and with rates above pre-drill expectations, the Company&#8217;s H1 actual production is expected to be at the upper end of the production guidance of 700-900 bopd net.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ST-1 rig is now moving towards the ASD-3 location to drill the second development well in the 2023 drilling programme, which is expected to spud in the coming weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Brian Larkin, CEO, commented:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>&#8220;We are very happy with the results from the ASH-8 well, and it is pleasing to see the well being brought on stream at a stabilised production rate of over 2,900 bopd some six weeks ahead of schedule. This is the fifth well in the highly productive ASH field, which has so far produced in excess of 4 million barrels of oil. The successful result at ASH-8 will have a positive impact on group production levels and revenue and further highlights the long-term value of the field. &nbsp;We look forward to drilling the next development well at ASD-3 on a location that was high-graded by the&nbsp;JV Partners&nbsp;following the success of the ASD-2 well in&nbsp;March 2022.&#8221;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>United Oil &amp; Gas has announced an update on the ASH-8 development well (ASH-8) in the Abu Sennan licence, onshore\u00a0Egypt. United holds a 22% working interest in the licence, which &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-from-the-ash-8-well\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13473,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[7450,10943,709,8815],"class_list":["post-13472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-abu-sennan","tag-ash-8","tag-egypt","tag-kuwait-energy","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Egypt-ASH-8.jpg?fit=750%2C537&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3vi","jetpack-related-posts":[{"id":9967,"url":"https:\/\/www.oilnewskenya.com\/index.php\/united-oil-and-gas-provides-ash-3-well-test-update\/","url_meta":{"origin":13472,"position":0},"title":"EGYPT: United Oil and Gas Provides ASH-3 Well Test Update","author":"","date":"February 23, 2021","format":false,"excerpt":"United Oil & Gas has provided the following update on the testing of the ASH-3 development well in the Abu Sennan concession, onshore Egypt. United holds a 22% non-operating interest in Abu Sennan, which is operated by Kuwait Energy Egypt.\u00a0 Highlights \u00b7\u00a0\u00a0\u00a0\u00a0Preliminary results from the ASH-3 well-test indicate a maximum\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12820,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-ash-4-well-to-be-tied-into-the-existing-facilities-in-the-abu-sennan-licence\/","url_meta":{"origin":13472,"position":1},"title":"EGYPT: ASH-4 Well to be Tied into the Existing Facilities in the Abu Sennan licence","author":"","date":"November 16, 2022","format":false,"excerpt":"-\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Preliminary test results from the ASH-4 well-test indicate a flow-rate of 2,101 bopd and 3 mmscf\/d (c. 2,700 boepd gross; 594 boepd net) from the Alam El Bueib (AEB) reservoir on a maximum 40\/64\" choke -\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0On a reduced, 32\/64\" choke, which is expected to be more representative of the producing\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12098,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-from-the-asd-2-well\/","url_meta":{"origin":13472,"position":2},"title":"EGYPT: Kuwait Energy Commences Production from the ASD-2 well","author":"","date":"March 28, 2022","format":false,"excerpt":"United Oil & Gas PLC has announced an update on the ASD-2 development well in the Abu Sennan licence, onshore Egypt. United holds a 22% working interest in the licence, which is operated by Kuwait Energy Egypt.\u00a0 Highlights \u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0The ASD-2 well has commenced production at an initial rate of c.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-Abu-Sennan-2.png?fit=591%2C472&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-Abu-Sennan-2.png?fit=591%2C472&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-Abu-Sennan-2.png?fit=591%2C472&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12876,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-united-oil-gas-provides-abu-sennan-licence-update\/","url_meta":{"origin":13472,"position":3},"title":"EGYPT: United Oil &#038; Gas Provides Abu Sennan licence Update","author":"","date":"November 28, 2022","format":false,"excerpt":"ASH-4 well update As previously announced, ASH-4, a step-out development well in the ASH field, encountered 20 metres of net pay through the primary Alam El Bueib (AEB) reservoir target. Preliminary well-test results indicated average flow rates of 1,325 bopd and 1.8 mmscf\/d (c. 1,685 boepd gross; 371 boepd net\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9681,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-united-oil-and-gas-provides-quarterly-production-report\/","url_meta":{"origin":13472,"position":4},"title":"EGYPT: United Oil and Gas Provides Quarterly Production Report","author":"","date":"January 13, 2021","format":false,"excerpt":"United Oil & Gas offers a quarterly production update for the period to the end of 2020. \u00b7\u00a0\u00a0\u00a0\u00a0United's H2 2020 net working interest production averaged 2,340 boepd in line with guidance for the period of 2,300 boepd \u00b7\u00a0\u00a0\u00a0\u00a0Q4 2020 net working interest production averaged 2,243 boepd (1,960 bopd oil and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10284,"url":"https:\/\/www.oilnewskenya.com\/index.php\/united-oil-and-gas-asd-1x-well-test-update-submission-of-notice-of-commercial-discovery\/","url_meta":{"origin":13472,"position":5},"title":"United Oil and Gas ASD-1X Well Test Update &#038; Submission of Notice of Commercial Discovery","author":"","date":"May 5, 2021","format":false,"excerpt":"United Oil & Gas has provide the following update on the testing of the ASD-1X exploration well in the Abu Sennan concession, onshore Egypt and the spudding of the AJ-8 development well. United holds a 22% non-operating interest in Abu Sennan, which is operated by Kuwait Energy Egypt (\"KEE\").\u00a0 Highlights\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13472"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13472\/revisions"}],"predecessor-version":[{"id":13474,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13472\/revisions\/13474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13473"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}