{"id":13379,"date":"2023-03-02T12:08:34","date_gmt":"2023-03-02T12:08:34","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13379"},"modified":"2023-03-02T12:08:34","modified_gmt":"2023-03-02T12:08:34","slug":"tanzania-ara-petroleum-to-delay-spudding-of-chikumbi-1-as-3d-seismic-processing-interpretation-continues","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ara-petroleum-to-delay-spudding-of-chikumbi-1-as-3d-seismic-processing-interpretation-continues\/","title":{"rendered":"TANZANIA: ARA Petroleum to Delay Spudding of Chikumbi-1 as 3D Seismic Processing &#038; Interpretation Continues"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Aminex reports that has been informed by ARA Petroleum Tanzania Limited (APT), the<br>Operator of the Ruvuma PSA, of a further delay to the spudding of the Chikumbi-1 well (CH-1). Aminex<br>is pleased to announce that plans to accelerate gas production, as outlined in our announcement of 1<br>November 2022, have been further developed with the Tanzanian authorities, now targeting October<br>2023 for production of first gas. This acceleration in the gas production schedule will result in earlier gas<br>revenues to the Company (Q4 of 2023), decoupling the production of first gas from the spudding of the<br>CH-1 well.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Several critical inter-related workstreams and ongoing negotiations with the Tanzanian authorities have<br>re-defined and further de-risked the Project, advancing first gas production by more than a year.<br>These inter-related workstreams are:<br>\u2022 The results of the initial 3D seismic processing and interpretation, to optimise the target location<br>of the CH-1 well at the Cretaceous reservoir level, will be available by mid-March. Following a<br>review by the Operator, the CH-1 well will no longer target the lower Jurassic zone. The processing<br>of the seismic data is more than 80% complete.<br>\u2022 A two-week well-testing programme on the Ntorya-2 well (NT-2) has been designed and<br>scheduled for late March 2023, utilising a mobile testing unit, to provide additional information<br>required for the design of in-field processing facilities and the export pipeline; in particular, an<br>accurate measurement of the gas composition.<br>\u2022 A well-workover of the Ntorya-1 well (NT-1), to enable rapid tie-in to the gas production<br>facilities and bring the well into early production requires the use of a drilling rig and will run after<br>the drilling of CH-1, which we expect later this year.<br>\u2022 Advanced negotiations regarding a Gas Sales Agreement (GSA) in respect of the Ntorya Gas<br>Field are ongoing with the Tanzania Petroleum Development Corporation (TPDC). It is expected<br>that the GSA will be agreed and finalised shortly.<br>\u2022 Tanzanian Authorities have actively engaged in substantial discussions with potential contractors<br>for an export pipeline from Ntorya to the Madimba Gas Plant to accommodate gas by October<br>2023.<br>\u2022 APT has held significant discussions with potential contractors for the construction of field<br>processing\/gathering facilities.<br>\u2022 A near final Field Development Plan (FDP) has been submitted and is now with TPDC for final<br>comments, which, upon approval, will lead to the issuance of a Development Licence for the<br>Ntorya Area.<br>\u2022 A request for a further extension of the Ruvuma Licence has been submitted, which is expected<br>to be granted soon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The successful conclusion to the above workstreams is expected to have the following impact on the<br>Project:<br>\u2022 The decoupling of the spudding of CH-1 from first gas production and receipt of gas revenues.<br>APT continues discussions with rig contractors and is confident of rig availability. We will provide<br>a further announcement on drilling rig arrangements in due course.<br>\u2022 Accelerated production from Ntorya, strongly supported by the Tanzanian authorities, and which<br>has now been brought forward twice from the original schedule.<br>\u2022 The FDP and resulting Development Licence will be granted up to 18 months ahead of the original<br>schedule with significant gas revenues to Aminex arising from production through NT-1, NT-2 and<br>CH-1, once drilled and completed.<br>\u2022 The full 3D seismic results will be available by mid-year and will permit a full revision of gas reserve<br>and resource potential for the field.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Charles Santos, Executive Chairman of Aminex commented:<br>\u201cToday\u2019s update demonstrates APT\u2019s capacity, not only to run multiple critical negotiations and a<br>significantly broader technical engagement but also its high level of confidence in the Project, fully<br>supported by the Tanzanian authorities. Accelerated gas production, now targeted for October 2023,shifts<br>the narrative of Ruvuma; it further de-risks the Project from a dependence on the spudding and outcome<br>of CH-1 to a more anchored and broader development effort as we move toward early gas production.<br>Such de-risking continues to honour the upside potential that will come from the drilling of CH-1, the 3D<br>seismic interpretation and the full development of the field. As mentioned in our previous announcement,<br>these developments are potential game-changers for all stakeholders in the Ruvuma development.<br>Moreover, locking in the development licence and halving the timeline for gas production and cash flow to the Company more than offsets the delay in spudding the CH-1 well. We thank APT and the Tanzanian<br>authorities for their significant efforts in bringing the Project to fruition and look forward to providing a<br>more detailed update to the market on completion of the current workstreams.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aminex, with a 25% non-operated interest, is carried throughout the ongoing work programme to a<br>maximum gross capital expenditure of $140 million ($35 million net to Aminex). The carry is expected to<br>see the Company through to the commencement of commercial gas production from the Ntorya gas-field at zero cost to the Company.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aminex reports that has been informed by ARA Petroleum Tanzania Limited (APT), theOperator of the Ruvuma PSA, of a further delay to the spudding of the Chikumbi-1 well (CH-1). Aminexis &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ara-petroleum-to-delay-spudding-of-chikumbi-1-as-3d-seismic-processing-interpretation-continues\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13380,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[137,6954,6979,961,6734,1784,11080,5887,2272,2466,2543],"class_list":["post-13379","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-aminex","tag-ara-petroleum","tag-chikumbi-1-well","tag-gas-sales-agreement","tag-madimba-gas-plant","tag-ntorya","tag-ntorya-1-well","tag-ntorya-2-well","tag-seismic","tag-tanzania","tag-tpdc","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=2098%2C1295&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3tN","jetpack-related-posts":[{"id":13791,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ruvuma-psc-jv-announce-finalization-of-the-gsa-fdp-and-the-development-licence-the-identification-of-a-much-improved-chikumbi-well-location\/","url_meta":{"origin":13379,"position":0},"title":"TANZANIA: Ruvuma PSC JV Announce Finalization of the GSA, FDP and the Development Licence &#038; the identification of a much-improved Chikumbi well location","author":"","date":"July 12, 2023","format":false,"excerpt":"Aminex PLC has announce that operations on the Ruvuma PSC have continued to progress under the direction of the operator, ARA Petroleum Tanzania Limited (APT): Following analysis of the results of the initial 3D seismic processing and interpretation, the JV partners have chosen a new optimal target location of the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12765,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-chikumbi-1-drilling-pushed-to-march-2023\/","url_meta":{"origin":13379,"position":1},"title":"TANZANIA: Chikumbi-1 Drilling Pushed to March 2023","author":"","date":"November 1, 2022","format":false,"excerpt":"Aminex reports that it has been informed of a delay to the spud date of the forthcoming Chikumbi-1 (CH-1) well by the operator, ARA Petroleum Tanzania Limited (APT). Due to ongoing negotiations with the Tanzanian authorities and contractors, Aminex has been advised that the expected spud date for CH-1 has\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":7160,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-chikumbi-1-well-drilling-nears-rig-bids-tendering-complete\/","url_meta":{"origin":13379,"position":2},"title":"Tanzania Chikumbi 1 Well Drilling Nears As Rig Bids Tendering Complete","author":"","date":"August 27, 2018","format":false,"excerpt":"The tendering process for a rig to drill\u00a0Chikumbi-1 (CH-1)\u00a0is now complete according to Aminex with the company having received numerous bids. These bids are being evaluated on their technical and commercial merits. CH-1 which is located up-dip from both the Ntorya-1 discovery well, which tested at rates of up to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Chikumbi-1.png?fit=353%2C461&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12616,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-half-of-seismic-data-now-acquired-over-the-ntorya-location\/","url_meta":{"origin":13379,"position":3},"title":"TANZANIA:  Half of Seismic Data Now Acquired over the Ntorya location, Ruvuma PSA","author":"","date":"September 5, 2022","format":false,"excerpt":"Aminex is pleased to announce that seismic and commercial activities on the Ruvuma PSC continue to progress under the direction of the operator, ARA Petroleum Tanzania Limited (APT): \u2022 Over half of the seismic data has now been acquired over the Ntorya location. \u2022 The seismic data required to evaluate\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":8138,"url":"https:\/\/www.oilnewskenya.com\/index.php\/aminex-receives-12-month-extension-on-the-mtwara-licence\/","url_meta":{"origin":13379,"position":4},"title":"Aminex Receives 12 month Extension on the Mtwara Licence","author":"","date":"April 29, 2020","format":false,"excerpt":"Aminex has announced that it has formally received the extension of the Mtwara Licence from the Ministry of Energy of Tanzania; one of the last remaining conditions required to close the Farm-Out Agreement with ARA Petroleum Tanzania Limited which will see the Company carried for up to US$35 million of\u2026","rel":"","context":"In &quot;Eastern Africa&quot;","block_context":{"text":"Eastern Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/eastern-africa\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":11032,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ruvuma-jv-approves-the-2022-work-programme-ahead-of-chikumbi-well-drilling\/","url_meta":{"origin":13379,"position":5},"title":"TANZANIA: Ruvuma JV Approves the 2022 Work Programme Ahead of Chikumbi Well Drilling","author":"","date":"October 22, 2021","format":false,"excerpt":"The Ruvuma JV has approved the 2022 work programme and budget which is designed to meet all work obligations under the terms of the licence extension previously announced on 18 August 2021, and furtheradvance the appraisal and de-risking of the existing gas discovery on the licence. The work programme will\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13379"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13379\/revisions"}],"predecessor-version":[{"id":13382,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13379\/revisions\/13382"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13380"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13379"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13379"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}