{"id":13351,"date":"2023-02-28T09:57:11","date_gmt":"2023-02-28T09:57:11","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13351"},"modified":"2023-02-28T09:57:11","modified_gmt":"2023-02-28T09:57:11","slug":"mauritania-senegal-bp-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/mauritania-senegal-bp-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/","title":{"rendered":"MAURITANIA\/ SENEGAL: bp, Partners Progress Concept for Greater Tortue Ahmeyim (GTA) Phase 2 to Next Phase of Evaluation"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">bp and partners today confirmed the development concept for the second phase of the bp-operated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will take forward to the next stage of evaluation.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures (SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as the basis for the GTA Phase 2 expansion project (GTA2) with total capacity of between 2.5-3.0 million tonnes per annum.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">GBS LNG developments have a static connection to the seabed with the structure providing LNG storage and a foundation for liquefication facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The concept design will also include new wells and subsea equipment, integrating with and expanding on existing GTA infrastructure. The partnership will consider powering LNG liquefication using electricity to help drive operational emissions lower. bp and its partners are now working with contractors to progress the concept towards the pre-FEED stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>Gordon Birrell, bp\u2019s executive vice president for operations and production, said: \u201cWe aim to build on our strong collaboration with our partners, and the Governments of Mauritania and Senegal, to further develop a long-term, successful energy hub in West Africa. GTA continues to underpin our strategy to develop the most resilient hydrocarbons to help provide energy security today.\u201d&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>GTA is located 120km offshore in water depth of 2850m, one of the deepest subsea developments in Africa. Phase 1 \u2013 currently under development &#8211; will export gas to an FPSO approximately 40km offshore where the gas will be processed and liquids separated, before exporting gas onward to floating LNG facilities 10km offshore. It is expected to produce around 2.3 million tonnes of LNG per year when operations commence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>In July 2021, the GTA project was granted the status of \u2018National Project of Strategic Importance\u2019 by the Presidents of Mauritania and Senegal. This recognition demonstrates the commitment of the host governments and the significance of the project to both countries.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>bp and the two Governments already have a long-standing and wide-ranging cooperation encompassing the GTA project and other potential energy developments. In October 2022, bp announced the signature of an exploration and production sharing contract for the BirAllah gas resource in Mauritania. In addition, bp continues to work with partners on the development of a major gas-to-power project in Senegal, Yakaar Teranga.&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Most recently, bp signed a memorandum of understanding (MoU) with the Government of Mauritania to deliver a programme exploring the potential for large-scale production of green hydrogen in the country.&nbsp;&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>bp and partners today confirmed the development concept for the second phase of the bp-operated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will take forward to &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/mauritania-senegal-bp-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13352,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[9498,2778,1428,1535,2025,2283,11064],"class_list":["post-13351","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-greater-tortue-ahmeyim","tag-kosmos-energy","tag-lng","tag-mauritania","tag-petrosen","tag-senegal","tag-societe-mauritanienne-des-hydrocarbures","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Greater-Tortue-Ahmeyim.jpg?fit=1187%2C769&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3tl","jetpack-related-posts":[{"id":13179,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mauritania-greater-tortue-ahmeyim-project-fpso-vessel-successfully-sets-sail-for-site\/","url_meta":{"origin":13351,"position":0},"title":"MAURITANIA: Greater Tortue Ahmeyim Project FPSO Vessel  Successfully Sets Sail for Site","author":"","date":"January 23, 2023","format":false,"excerpt":"The floating production, storage and offloading (FPSO) vessel for the bp-operated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project has started its journey towards the project site off the coasts of Mauritania and Senegal. The FPSO set sail on 20 January 2023 from Qidong, China after successfully completing a\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10587,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mauritania-valaris-lands-floater-contract-award\/","url_meta":{"origin":13351,"position":1},"title":"MAURITANIA: Valaris Lands Floater Contract Award","author":"","date":"July 7, 2021","format":false,"excerpt":"Valaris Limited has announced that it has been awarded a four-well contract with BP offshore Mauritania and Senegal for drillship, VALARIS DS-12. The contract is expected to commence in the first quarter of 2022 with an estimated duration of 285 days. In Mauritania, bp has a 62% working interest, including\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/Valaris_DS_12.jpg?fit=433%2C615&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13775,"url":"https:\/\/www.oilnewskenya.com\/index.php\/grand-tortue-ahmeiym-gta-phase-2-sets-the-stage-for-energy-development-in-senegal-mauritania\/","url_meta":{"origin":13351,"position":2},"title":"Grand Tortue Ahmeiym GTA Phase 2 Sets the Stage for Energy Development in Senegal &#038; Mauritania","author":"","date":"July 6, 2023","format":false,"excerpt":"As the first phase of the Grand Tortue Ahmeyim (GTA) gas project reaches 90% completion, and first gas targeted for the end of fourth-quarter of 2023, Mauritania and Senegal are already looking ahead to the next stage, which is expected to commence between 2024 and 2025.According to Lehbib Khroumbaly, Advisor\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14706,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mauritania-senegal-kosmos-energy-announces-first-lng-at-the-greater-tortue-ahmeyim-project\/","url_meta":{"origin":13351,"position":3},"title":"Mauritania\/Senegal: Kosmos Energy Announces First LNG at the Greater Tortue Ahmeyim Project","author":"","date":"February 13, 2025","format":false,"excerpt":"Kosmos Energy announces that first liquified natural gas (LNG) production has been achieved at the bp-operated Greater Tortue Ahmeyim (GTA) LNG project, offshore\u00a0Mauritania\u00a0&\u00a0Senegal. On\u00a0December 31, 2024, gas from the first phase of GTA started to flow from wells to the floating production storage and offloading (FPSO) vessel as part of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/GTA-FPSO.jpg?fit=750%2C500&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14608,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mauritania-senegal-bp-flows-first-gas-at-greater-tortue-ahmeyim-lng-project\/","url_meta":{"origin":13351,"position":4},"title":"MAURITANIA\/ SENEGAL: bp flows first gas at Greater Tortue Ahmeyim LNG project","author":"","date":"January 2, 2025","format":false,"excerpt":"bp has begun flowing gas from wells at the GTA Phase1 liquefied natural gas (LNG) project to its floating production storage and offloading (FPSO) vessel for the next stage of commissioning.\u00a0\u00a0\u00a0 GTA, offshore Mauritania and Senegal, is one of the deepest offshore developments in Africa, with gas resources in water\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/01\/Gimi-FLNG.png?fit=593%2C335&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/01\/Gimi-FLNG.png?fit=593%2C335&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/01\/Gimi-FLNG.png?fit=593%2C335&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":15118,"url":"https:\/\/www.oilnewskenya.com\/index.php\/flng-gimi-reaches-commercial-operations-date-and-golar-progresses-flng-growth\/","url_meta":{"origin":13351,"position":5},"title":"FLNG Gimi reaches Commercial Operations Date and Golar progresses FLNG growth","author":"","date":"June 24, 2025","format":false,"excerpt":"Golar LNG Limited announces that FLNG\u00a0Gimi\u00a0has reached the Commercial Operations Date for its 20-year Lease and Operate Agreement for the Greater Tortue Ahmeyim (GTA) project offshore Mauritania and Senegal. The COD triggers the start of the 20-year Lease and Operate Agreement that unlocks the equivalent of around $3 billion of\u2026","rel":"","context":"In \"FLNG\u00a0Gimi\"","block_context":{"text":"FLNG\u00a0Gimi","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/flng-gimi\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/06\/FLNG-Gimi.jpg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/06\/FLNG-Gimi.jpg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/06\/FLNG-Gimi.jpg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/06\/FLNG-Gimi.jpg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13351","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13351"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13351\/revisions"}],"predecessor-version":[{"id":13353,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13351\/revisions\/13353"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13352"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13351"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13351"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}