{"id":13183,"date":"2023-01-23T19:05:20","date_gmt":"2023-01-23T19:05:20","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13183"},"modified":"2023-01-23T19:05:20","modified_gmt":"2023-01-23T19:05:20","slug":"zimbabwe-mukuyu-1-evaluation-update-operations-completed-phase-2-campaign-planning-commenced","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-evaluation-update-operations-completed-phase-2-campaign-planning-commenced\/","title":{"rendered":"ZIMBABWE: Mukuyu-1 Evaluation Update, Operations Completed &#038; Phase 2 Campaign Planning Commenced"},"content":{"rendered":"<p>HIGHLIGHTS<br \/>\n\u2022 Mukuyu-1 ST1 identifies 13 potential hydrocarbon bearing zones<br \/>\n\u2022 Combined 225m gross potential hydrocarbon bearing zones identified in primary<br \/>\nUpper Angwa target<br \/>\n\u2022 Mukuyu-1 ST1 operations completed<br \/>\n\u2022 Rig 202 is rigged down in preparation for maintenance and upgrades<br \/>\n\u2022 Planning commenced for Mukuyu appraisal &amp; Phase 2 drilling and evaluation<\/p>\n<p>Comments from Managing Director Scott Macmillan:<br \/>\n\u201cThe Mukuyu-1 and ST1 drill campaign has been a great success, identifying 13 potential<br \/>\nhydrocarbon bearing zones across the Pebbly Arkose and Upper Angwa formations.<br \/>\n\u201cSignificantly, a combined 225 metres of gross potential hydrocarbon bearing zones have been identified in the primary target Upper Angwa, which still contains deeper untested potential.<\/p>\n<p>\u201cThis is an outstanding result and virtually unprecedented for the first well in a frontier basin, establishing a new petroleum province and substantially de-risking the Company\u2019s wider acreage in the Cabora Bassa Basin.<\/p>\n<p>\u201cWe are still interpreting all the data, with results to be integrated into the seismic data and basin models to guide future well locations and exploration prospect selection.\u201d<br \/>\nMukuyu-1 ST1 identifies 13 potential hydrocarbon bearing zones.<\/p>\n<p>Following completion of operations of the Mukuyu-1 ST1 well, a total of 13 potential<br \/>\nhydrocarbon bearing zones were interpreted in the Pebbly Arkose and Upper Angwa<br \/>\nformations.<\/p>\n<p>Of note is the primary target Upper Angwa formation, with 11 identified potential<br \/>\nhydrocarbon bearing zones totalling a combined 225 metres.<\/p>\n<p>All potential hydrocarbon bearing zones have been isolated and plugged and the Mukuyu-1<br \/>\nand ST1 wells have been left in a safe condition.<br \/>\nThe potential hydrocarbon bearing zones that have been isolated are as follows:<br \/>\n<img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13184 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-ST1-zones.png?resize=518%2C332&#038;ssl=1\" alt=\"\" width=\"518\" height=\"332\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-ST1-zones.png?w=518&amp;ssl=1 518w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-ST1-zones.png?resize=300%2C192&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-ST1-zones.png?resize=100%2C64&amp;ssl=1 100w\" sizes=\"auto, (max-width: 518px) 100vw, 518px\" \/><br \/>\nSome gross intervals may contain significant proportions of non-net reservoir. Further log calibration will be obtained following completion of side wall core analysis.<br \/>\n2metres Measured Depth below Rotary Table (mMDRT)<\/p>\n<p>Wireline log interpretation calculated porosity of up to 15% and gas saturation of up to 90% in selected potential pay zones in the Upper Angwa but are yet to be calibrated with fluid and core data and subsequently subject to wide margins of error.<\/p>\n<p>Weak to strong hydrocarbon fluorescence was noted from approximately 2,100m Measured Depth (mMD) in the Pebbly Arkose and was consistent to TD at 3,923mMD, with up to 100% fluorescence observed in some cuttings and side wall cores.<\/p>\n<p>Further reservoir and potential pay intervals in the Upper Angwa intersected when the Mukuyu1 well was deepened from 3,618 to 3,923m could not be fully evaluated due to a breakdown in the borehole, preventing logging of the deepened section.<\/p>\n<p>The Upper Angwa primary target contained a 1,400m vertical section of sand, siltstone,<br \/>\ncarbonaceous claystone and coal, which can be indicators of potential hydrocarbon reservoirs and have confirmed the presence of competent seals.<\/p>\n<p>The interpreted gas sands suggest good calibration with the velocity (Vint) slowdowns<br \/>\nobserved at the 500 and 600 surfaces (currently interpreted to represent the Pebbly Arkose and Upper Angwa, respectively), as shown in Figure 1, and will provide both calibration for mapping this anomaly around the Mukuyu structure and application to the Pebbly Arkose and Upper Angwa play in the remaining prospect portfolio.<\/p>\n<p>Additional reservoir intervals encountered in the Pebbly Arkose sections with porosity up to 20% (not included in Table 1) contained minor fluorescence and elevated gas shows above background.<\/p>\n<p>Log interpretation indicates residual gas saturation within these sands, establishing<br \/>\nhydrocarbon migration has occurred through this zone and provides for additional targets in updip locations towards the crest of the structure.<\/p>\n<p>Multiple reservoir sand and seal pairs were intersected in the Post Dande, Forest, Pebbly Arkose and Upper Angwa formations and multiple intervals of rich source encountered in the Upper Angwa as prognosed.<\/p>\n<p>Deeper untested potential remains in the Mukuyu structure, with the bottom of the Upper Angwa not reached in either Mukuyu-1 or ST1, while the Lower Angwa was also not intersected. The success of Mukuyu-1 on the southern flank of structure in a location that is 300m below the crest (Figure 1) also provides further untested updip potential, which will be targeted in forthcoming drilling programs.<\/p>\n<p>The Mukuyu-1 and ST1 operations have been concluded with no Lost Time Injuries and rig down completed.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13185 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?resize=615%2C331&#038;ssl=1\" alt=\"\" width=\"615\" height=\"331\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?w=615&amp;ssl=1 615w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?resize=600%2C323&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?resize=300%2C161&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?resize=100%2C54&amp;ssl=1 100w\" sizes=\"auto, (max-width: 615px) 100vw, 615px\" \/><\/p>\n<p>Mukuyu appraisal and Phase 2 drilling program planning commences<br \/>\nRig 202 is warm stacked at the Mukuyu-1 well location to allow for maintenance and upgrades prior to recommencing drilling.<\/p>\n<p>Laboratory analysis of sidewall cores acquired during logging, and drill cuttings and mudgas samples acquired whilst drilling will provide further calibration of the wireline and the geological model once completed.<\/p>\n<p>These results will be integrated into the seismic data and basin models to guide future well locations and exploration prospect selection.<\/p>\n<p>The Company is now assessing the forward work program and a range of targets for the first well in its Phase 2 drilling campaign, including Mukuyu-2 and Baobab-1, as well as other promising exploration prospects identified across the wider Cabora Bassa acreage.<br \/>\nThe timing of the forward exploration and drilling will be determined following the completion of long lead and well services tendering exercises which are commencing imminently.<\/p>\n<p><strong>Cabora Bassa Basin petroleum system pre-drill vs. post drill summary<\/strong><br \/>\nThe pre-drill interpretation and understanding of the Cabora Bassa Basin was a gas prone<br \/>\npetroleum system with potential seal and charge vs trap timing (containment) risk.<br \/>\nPost-drill, results from the Mukuyu-1 and subsequent sidetrack have proven a working<br \/>\nhydrocarbon system and the presence of gas-condensate and potentially light oil, evidenced from elevated mudgas (C1-C5 components), fluorescence and wireline log interpretation, significantly de-risking remaining prospectivity in the basin.<\/p>\n<p>The primary pre-drill risks of seal (presence and effectiveness) and source rock (presence and quality) have effectively been de-risked with the intersection of multiple competent seals and presence of gas filled sands indicating the preservation of reservoired hydrocarbons, significantly reducing the historically high risks of containment.<\/p>\n<p>A summary of the pre-drill vs. post-drill petroleum system in the Cabora Bassa Basin is shown below and overpage.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13187 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_4.png?resize=606%2C164&#038;ssl=1\" alt=\"\" width=\"606\" height=\"164\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_4.png?w=606&amp;ssl=1 606w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_4.png?resize=600%2C162&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_4.png?resize=300%2C81&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_4.png?resize=100%2C27&amp;ssl=1 100w\" sizes=\"auto, (max-width: 606px) 100vw, 606px\" \/><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13186 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_5.png?resize=609%2C665&#038;ssl=1\" alt=\"\" width=\"609\" height=\"665\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_5.png?w=609&amp;ssl=1 609w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_5.png?resize=600%2C655&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_5.png?resize=275%2C300&amp;ssl=1 275w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Screenshot_5.png?resize=92%2C100&amp;ssl=1 92w\" sizes=\"auto, (max-width: 609px) 100vw, 609px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>HIGHLIGHTS \u2022 Mukuyu-1 ST1 identifies 13 potential hydrocarbon bearing zones \u2022 Combined 225m gross potential hydrocarbon bearing zones identified in primary Upper Angwa target \u2022 Mukuyu-1 ST1 operations completed \u2022 &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-evaluation-update-operations-completed-phase-2-campaign-planning-commenced\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":13185,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[10672,9258,7812,10413,10938,2767],"class_list":["post-13183","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-baobab-1","tag-cabora-bassa-basin","tag-invictus-energy","tag-mukuyu-1","tag-mukuyu-2","tag-zimbabwe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Mukuyu-1.png?fit=615%2C331&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3qD","jetpack-related-posts":[{"id":13339,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-commences-mukuyu-2-appraisal-well-program-phase-2-exploration\/","url_meta":{"origin":13183,"position":0},"title":"ZIMBABWE: Invictus Energy Commences Mukuyu-2 Appraisal Well Program &#038; Phase 2 Exploration","author":"","date":"February 24, 2023","format":false,"excerpt":"\u2022 Appraisal program commences with Mukuyu-2 spud targeted for early Q3 2023\u2022 Well services and long lead process tendering commenced\u2022 Mukuyu-1 post well analysis of pressure data indicates potential for significant gascolumns in Pebbly Arkose and Upper Angwa\u2022 Industry interest received to partner in project and forward work program\u2022 2D\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13625,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-and-phase-2-exploration-commences\/","url_meta":{"origin":13183,"position":1},"title":"ZIMBABWE: Mukuyu-2 Appraisal and Phase 2 Exploration Commences","author":"","date":"April 28, 2023","format":false,"excerpt":"During the quarter, Invictus commenced preparations for the Mukuyu-2 appraisal well andPhase 2 exploration campaign at its 80 per cent owned and operated Cabora Bassa project inZimbabwe.The tendering process commenced during the quarter for minor additional long leads and well services for the Mukuyu-2 well, which is anticipated to spud\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":14073,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-successfully-kicks-off-the-mukuyu-2-sidetrack-well\/","url_meta":{"origin":13183,"position":2},"title":"ZIMBABWE: Invictus Energy Successfully Kicks-off the Mukuyu-2 Sidetrack Well","author":"","date":"November 27, 2023","format":false,"excerpt":"Invictus Energy has announced that the Mukuyu-2 well was plugged back with cement above the 9\u215d\u201d casing shoe (at approximately 1,966m Measured Depth (mMD) and drilling to kickoff the Mukuyu-2 ST1 (sidetrack) well was initiated and successfully achieved with 100% new formation drilled. Following the successful kickoff of the 8\u00bd\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack-1.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13556,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-raises-10m-to-fund-mukuyu-2-well-preparations-phase-2-exploration\/","url_meta":{"origin":13183,"position":3},"title":"ZIMBABWE: Invictus Raises $10M to Fund Mukuyu-2 Well Preparations &#038; Phase 2 Exploration","author":"","date":"April 12, 2023","format":false,"excerpt":"Invictus Energy has announced a private Placement to raise $10.0m, at $0.12 per share, following the Company\u2019s decision to advance preparations for an appraisal and exploration campaign in Zimbabwe\u2019s Cabora Bassa Basin. Comments from Managing Director Scott Macmillan:\u201cI am pleased with the backing Invictus has received from both existing and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Mukuyu-lead-map.png?fit=756%2C373&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12246,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-seismic-inversion-results-show-potential-for-multiple-stacked-hydrocarbon-bearing-zones-in-mukuyu-prospect\/","url_meta":{"origin":13183,"position":4},"title":"ZIMBABWE: Seismic Inversion Results Show Potential for Multiple Stacked Hydrocarbon Bearing Zones in Mukuyu Prospect","author":"","date":"May 13, 2022","format":false,"excerpt":"Seismic inversion results show potential for multiple stacked hydrocarbon bearing zones in new Post Dande target (Horizon 200). Further quantitative analysis (QA) studies continue to provide support for the presence of potential hydrocarbons in the Mukuyu structure. The results from a seismic inversion\/QA study indicate that the section immediately below\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Zimbabwe-CB21-seismic.png?fit=647%2C379&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Zimbabwe-CB21-seismic.png?fit=647%2C379&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Zimbabwe-CB21-seismic.png?fit=647%2C379&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13818,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-well-location-selected-ahead-of-spudding-in-q3-2023\/","url_meta":{"origin":13183,"position":5},"title":"ZIMBABWE: Mukuyu-2 Appraisal Well Location Selected Ahead of Spudding in Q3 2023","author":"","date":"July 17, 2023","format":false,"excerpt":"Invictus Energy Limited has provided an update on the Mukuyu-2 appraisal well, a follow up to the successful, play-opening Mukuyu-1 well in the Cabora Bassa Basin in Zimbabwe. Comments from Managing Director Scott Macmillan:\u201cSelection of the Mukuyu-2 appraisal well location, refinement of the well trajectory and drillingplans have been completed\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13183"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13183\/revisions"}],"predecessor-version":[{"id":13188,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13183\/revisions\/13188"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/13185"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}