{"id":13061,"date":"2023-01-03T10:37:52","date_gmt":"2023-01-03T10:37:52","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13061"},"modified":"2023-01-03T12:50:29","modified_gmt":"2023-01-03T12:50:29","slug":"tanzania-mukuyu-1-and-sidetrack-final-well-results-and-rig-202-secured-for-further-12-months","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mukuyu-1-and-sidetrack-final-well-results-and-rig-202-secured-for-further-12-months\/","title":{"rendered":"ZIMBABWE: Mukuyu-1 and sidetrack final well results and Exalo Rig 202 secured for further 12 months"},"content":{"rendered":"<p>Since the last update, the drill string was rigged up to conduct fishing operations to attempt to retrieve the wireline formation testing tool.<\/p>\n<p>The drill string with the overshot was run in hole to the casing shoe to commence installation of the side entry sub to allow for allow wireline operations through the drill pipe without interference from the rig\u2019s top drive system. However, during the installation process the T Bar clamp broke and operations were suspended until a replacement T Bar could be sourced from a regional supply base resulting in several days of delays.<\/p>\n<p>Following the arrival of a replacement T Bar clamp the side entry sub was successfully installed and fishing operations resumed.<br \/>\nThe wireline cable was successfully freed, however the wireline formation testing tool became stuck against the borehole wall during the intervening period. The tool was successfully engaged with the overshot but required significant force (approximately 50,000 foot-pounds) to break the tool free and the tool is unsuitable for use until it can be assessed and repaired.<\/p>\n<p>Following mechanical disconnection of the wireline cable, the tool was successfully retrieved to the surface.<\/p>\n<p>Wireline log interpretation calculated porosity of up to 15% and gas saturation of up to 90% in selected potential pay zones but are yet to be calibrated with fluid and core data and subsequently subject to wide margins of error.<br \/>\n<strong>Forward plan<\/strong><br \/>\nThe primary and backup wireline formation testing tools are currently non-functional and the duration to repair or replace parts is unknown.<br \/>\nThe logging conditions evidenced by tool and drillpipe sticking and significant overpull<br \/>\nobserved during fishing operations also render conditions unsuitable to make further attempts to obtain a fluid sample even with functioning wireline tools.<br \/>\nSubsequently further attempts to obtain a fluid sample are not feasible and the Company will conclude operations on Mukuyu-1 and ST1 and demobilise the well services equipment and personnel.<br \/>\nRig 202 will be warm stacked at the Mukuyu-1 well location to allow for maintenance and<br \/>\nupgrades prior to recommencing drilling at either Mukuyu-2 or Baobab-1 in 2023 following sourcing of required long leads and tendering of well services and equipment.<br \/>\nLaboratory analysis of sidewall cores acquired during logging and drill cuttings and mudgas samples acquired whilst drilling will provide further calibration of the wireline and the geological model once completed.<\/p>\n<p>Exalo Rig 202 Contract Extension for 12 months to remain in Cabora Bassa Basin<br \/>\nInvictus and Exalo Drilling S.A have executed a contract amendment for Rig 202 to remain in the Cabora Bassa Basin in Zimbabwe for up to 12 months to enable the drilling of future wells in the basin.<\/p>\n<p>The highly encouraging results from the initial Mukuyu-1 and side track well have provided the Company with the confidence to keep Rig 202 warm stacked at the Mukuyu-1 location whilst preparations are made for the future drilling campaign for at least one firm well in 2023, with further wells to be agreed.<\/p>\n<p>During the rig stacking period Exalo will perform maintenance and upgrades to Rig 202 in<br \/>\npreparation for drilling to recommence.<\/p>\n<p>Comments from Managing Director Scott Macmillan:<br \/>\n<em>\u201cWe have achieved a fantastic result from the Mukuyu-1 and sidetrack well which has multiple gas zones and potentially liquid hydrocarbon bearing intervals interpreted from wireline logs and drilling.<\/em><\/p>\n<p><em>\u201cWe have a proven hydrocarbon system in the Cabora Bassa Basin as evidenced from significantly elevated gas shows and fluorescence during drilling and confirmed the presence of rich source rock, seal, reservoir, trap and timing.<\/em><\/p>\n<p><em>\u201cWhilst we are frustrated with the numerous operational challenges encountered and not being able to obtain a fluid sample which would have enabled the formal declaration of a discovery, we have still achieved a hugely significant result from the first well in the basin which has substantially de-risked our dominant acreage position and established a new petroleum province.<\/em><\/p>\n<p><em>\u201cWe have gathered a high quality dataset across the Mukuyu-1 and sidetrack well which will now be integrated with the existing seismic data to calibrate and refine our interpretation and plan for the appraisal of Mukuyu as well as additional prospects in the basin.<\/em><\/p>\n<p><em>\u201cWe are particularly encouraged with the Upper Angwa Alternation Member horizon which proved up the hydrocarbon potential over a 900 metre gross interval with elevated gas shows up to 135 times above background and fluorescence to TD and still contains deeper untested potential and a further 300 metres of updip potential at the crest of the structure.<\/em><\/p>\n<p>\u201cThe contract amendment executed with Exalo to keep Rig 202 for an additional 12 months underpins our confidence in the hydrocarbon prospectivity of the basin and will result in substantial time and cost savings to the Company compared to demobilising and remobilising the rig to and from East Africa for future drilling.<\/p>\n<p>\u201cFurthermore, the stacking of the rig at Mukuyu-1 will allow Exalo to perform maintenance and upgrades of the rig prior to recommencing drilling of either Mukuyu-2 or Baobab-1 in 2023 whilst the Company sources necessary long leads, conducts tendering for well services and integrates the substantial information gathered into the geological model to determine future drilling locations.<\/p>\n<p>\u201cWe have gained a deeper understanding of the subsurface geology and valuable experience in drilling of the Cabora Bassa Basin which will allow us to optimise our plans, drilling fluids, equipment and services required for future campaigns.<\/p>\n<p>\u201cOverall, the drilling campaign and Mukuyu-1 and sidetrack well have been a tremendous<br \/>\nsuccess. We thank our shareholders and supporters for backing the Company to fund and sole risk the drilling campaign, the results of which have put us in a strong future position given the petroleum potential of the basin has been proven. We have an exciting portfolio of additional prospects and leads which has been substantially de-risked in addition to Mukuyu.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since the last update, the drill string was rigged up to conduct fishing operations to attempt to retrieve the wireline formation testing tool. The drill string with the overshot was &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mukuyu-1-and-sidetrack-final-well-results-and-rig-202-secured-for-further-12-months\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":12689,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[10672,9258,10939,10413,10938,2767],"class_list":["post-13061","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-baobab-1","tag-cabora-bassa-basin","tag-exalo-rig","tag-mukuyu-1","tag-mukuyu-2","tag-zimbabwe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3oF","jetpack-related-posts":[{"id":13043,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-sti-continues-to-witness-multiple-downhole-failures\/","url_meta":{"origin":13061,"position":0},"title":"ZIMBABWE: Mukuyu-1 STI  Continues to Witness Multiple Downhole Failures","author":"","date":"December 29, 2022","format":false,"excerpt":"Invictus Energy continues to report challenges in completing the Mukuyu-1 side track well with the recent report indicating that the wireline cable became lodged against the wellbore, during the wireline sampling programme, and multiple attempts to free the cable have been unsuccessful. \"Following the primary log acquisition, multiple downhole failures\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14073,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-successfully-kicks-off-the-mukuyu-2-sidetrack-well\/","url_meta":{"origin":13061,"position":1},"title":"ZIMBABWE: Invictus Energy Successfully Kicks-off the Mukuyu-2 Sidetrack Well","author":"","date":"November 27, 2023","format":false,"excerpt":"Invictus Energy has announced that the Mukuyu-2 well was plugged back with cement above the 9\u215d\u201d casing shoe (at approximately 1,966m Measured Depth (mMD) and drilling to kickoff the Mukuyu-2 ST1 (sidetrack) well was initiated and successfully achieved with 100% new formation drilled. Following the successful kickoff of the 8\u00bd\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack-1.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12862,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-to-be-sidetracked-as-borehole-conditions-deteriorate\/","url_meta":{"origin":13061,"position":2},"title":"ZIMBABWE: Mukuyu-1 to be Sidetracked as Borehole Conditions Deteriorate","author":"","date":"November 27, 2022","format":false,"excerpt":"\u2022 Mukuyu-1 successfully deepened to 3,923 metres Measured Depth (\u201cmMD\u201d), encountering additional elevated gas shows and fluorescence through to total depth \u2022 Results prove up potential of the Upper Angwa formation over a 900m gross interval \u2022 Upper Angwa formation thicker than pre-drill estimates, boding well for future prospectivity in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14062,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-moves-to-mukuyu-2-vertical-sidetrack-to-overcome-borehole-conditions-well-control-challenges\/","url_meta":{"origin":13061,"position":3},"title":"ZIMBABWE: Invictus Energy Moves to Mukuyu-2 Vertical Sidetrack to Overcome Borehole Conditions &#038; Well Control Challenges","author":"","date":"November 21, 2023","format":false,"excerpt":"Gas recovery and wireline data provides confirmation of moveable hydrocarbonsInvictus reports that the exploration team has successfully recovered natural gas (predominantlymethane and trace heavier hydrocarbons) to surface from the Pebbly Arkose formation and continued pipe conveyed logging operations due to challenging borehole conditions. Additionally Invictus says, wireline logging data from\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":14008,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-drilling-update-elevated-gas-shows-resistivity-encountered-in-upper-angwa\/","url_meta":{"origin":13061,"position":4},"title":"ZIMBABWE: Mukuyu-2 drilling update: Elevated Gas Shows &#038; Resistivity Encountered in Upper Angwa","author":"","date":"October 24, 2023","format":false,"excerpt":"Progress and current operationsSince the last update, the 9 \u215d\u201d casing was set and the choke manifold for the blow out preventer (BOP) was changed out prior to commencement of drilling the 8\u00bd\u201d hole section, which has reached the current depth of 2,745 metres Measured Depth (mMD). Elevated mud gas\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig.jpeg?fit=1024%2C681&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig.jpeg?fit=1024%2C681&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13818,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-well-location-selected-ahead-of-spudding-in-q3-2023\/","url_meta":{"origin":13061,"position":5},"title":"ZIMBABWE: Mukuyu-2 Appraisal Well Location Selected Ahead of Spudding in Q3 2023","author":"","date":"July 17, 2023","format":false,"excerpt":"Invictus Energy Limited has provided an update on the Mukuyu-2 appraisal well, a follow up to the successful, play-opening Mukuyu-1 well in the Cabora Bassa Basin in Zimbabwe. Comments from Managing Director Scott Macmillan:\u201cSelection of the Mukuyu-2 appraisal well location, refinement of the well trajectory and drillingplans have been completed\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/07\/Zimbabwe-Mukuyu-2-2.png?fit=610%2C453&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13061","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13061"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13061\/revisions"}],"predecessor-version":[{"id":13071,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13061\/revisions\/13071"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/12689"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}