{"id":13043,"date":"2022-12-29T16:34:28","date_gmt":"2022-12-29T16:34:28","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=13043"},"modified":"2022-12-29T16:44:09","modified_gmt":"2022-12-29T16:44:09","slug":"zimbabwe-mukuyu-1-sti-continues-to-witness-multiple-downhole-failures","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-sti-continues-to-witness-multiple-downhole-failures\/","title":{"rendered":"ZIMBABWE: Mukuyu-1 STI  Continues to Witness Multiple Downhole Failures"},"content":{"rendered":"<p>Invictus Energy continues to report challenges in completing the Mukuyu-1 <a href=\"https:\/\/www.oilnewskenya.com\/zimbabwe-mukuyu-1-to-be-sidetracked-as-borehole-conditions-deteriorate\/\">side track<\/a> well with the recent report indicating that the wireline cable became lodged against<br \/>\nthe wellbore, during the wireline sampling programme, and multiple attempts to free the cable have been unsuccessful.<\/p>\n<p><em>&#8220;Following the primary log acquisition, multiple downhole failures were encountered with both the primary and backup wireline formation testing tools.&#8221;<\/em><\/p>\n<p>Further a statement by the company indicate that the cable is stuck above the wireline formation testing tools although the drill string has been rigged up to conduct fishing operations to attempt to retrieve the wireline formation testing tool<\/p>\n<p>Invictus that with the drill string being rigged this significantly increases the chance of retrieving the tools and continuing wireline logging operations to obtain a fluid<br \/>\nsample.<\/p>\n<p>If successful Invictus says the tool function will be verified, and the Company will conduct \u201clogging while fishing\u201d operations on drill pipe saving time by allowing logging to continue during fishing operations and allowing the tools to continue the testing programme, with the aim of obtaining a fluid sample.<\/p>\n<p>Comments from Managing Director Scott Macmillan:<br \/>\n<em>\u201cThe delays in concluding the evaluation programme are frustrating, however, the borehole conditions remain favourable for a successful logging programme.<\/em><br \/>\n<em>\u201cWith the wireline cable stuck above the wireline tools, we are optimistic fishing operations will be successful and allow us to continue the sampling programme with the aim of obtaining a fluid sample to enable a formal discovery to be made.<\/em><br \/>\n<em>\u201cTool failures and unforeseen delays are an unfortunate but common occurrence in frontier oil and gas exploration.<\/em><br \/>\n<em>\u201cWe will provide further updates once the fishing operation is concluded.\u201d<\/em><\/p>\n<p>The company has since its<a href=\"https:\/\/www.oilnewskenya.com\/zimbabwe-drilling-of-the-mukuyu-1-has-recommences\/\"> last update<\/a> reported that the reaming of select hole sections was completed and the wellbore was prepared for wireline logging. The primary wireline logs were successfully acquired across the entire 8\u00bd\u201d hole section of the Mukuyu-1 ST1 wellbore.<\/p>\n<p>Preliminary evaluation the company says indicates multiple potential gas bearing zones coincident with intervals that displayed elevated gas shows during drilling of the original Mukuyu-1 wellbore.<\/p>\n<p>The Mukuyu-1 well that is currently being drilled in the company&#8217;s 80% owned SG 4571 licence in Zimbabwe\u2019s Cabora Bassa Basin.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Invictus Energy continues to report challenges in completing the Mukuyu-1 side track well with the recent report indicating that the wireline cable became lodged against the wellbore, during the wireline &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-sti-continues-to-witness-multiple-downhole-failures\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":12689,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[8753,9881,7812,10413,8080,2767],"class_list":["post-13043","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-cabora-basa-basin","tag-exalo-202-rig","tag-invictus-energy","tag-mukuyu-1","tag-sg-4571","tag-zimbabwe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3on","jetpack-related-posts":[{"id":14062,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-moves-to-mukuyu-2-vertical-sidetrack-to-overcome-borehole-conditions-well-control-challenges\/","url_meta":{"origin":13043,"position":0},"title":"ZIMBABWE: Invictus Energy Moves to Mukuyu-2 Vertical Sidetrack to Overcome Borehole Conditions &#038; Well Control Challenges","author":"","date":"November 21, 2023","format":false,"excerpt":"Gas recovery and wireline data provides confirmation of moveable hydrocarbonsInvictus reports that the exploration team has successfully recovered natural gas (predominantlymethane and trace heavier hydrocarbons) to surface from the Pebbly Arkose formation and continued pipe conveyed logging operations due to challenging borehole conditions. Additionally Invictus says, wireline logging data from\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13998,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-provides-mukuyu-2-drilling-update\/","url_meta":{"origin":13043,"position":1},"title":"ZIMBABWE: Invictus Energy Provides Mukuyu-2 Drilling Update","author":"","date":"October 11, 2023","format":false,"excerpt":"HIGHLIGHTS 12 \u00bc inch intermediate hole section drilled to 1966m MD to set casing above first zones of interest where hydrocarbons were encountered in Mukuyu-1 Higher total background gas observed in Mukuyu-2 than at Mukuyu-1 along with heavier hydrocarbons (C4 and C5) in mudgas Indications of improved reservoir quality in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Mukuyu-Prospect-2.png?fit=606%2C327&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Mukuyu-Prospect-2.png?fit=606%2C327&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Mukuyu-Prospect-2.png?fit=606%2C327&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14073,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-successfully-kicks-off-the-mukuyu-2-sidetrack-well\/","url_meta":{"origin":13043,"position":2},"title":"ZIMBABWE: Invictus Energy Successfully Kicks-off the Mukuyu-2 Sidetrack Well","author":"","date":"November 27, 2023","format":false,"excerpt":"Invictus Energy has announced that the Mukuyu-2 well was plugged back with cement above the 9\u215d\u201d casing shoe (at approximately 1,966m Measured Depth (mMD) and drilling to kickoff the Mukuyu-2 ST1 (sidetrack) well was initiated and successfully achieved with 100% new formation drilled. Following the successful kickoff of the 8\u00bd\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/11\/Mukuyu-2-V-Sidetrack-1.png?fit=477%2C516&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":14020,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-wireline-logging-commences-as-mukuyu-2-well-has-reached-total-depth\/","url_meta":{"origin":13043,"position":3},"title":"ZIMBABWE: Wireline Logging Commences as Mukuyu-2 Well reaches Total Depth","author":"","date":"October 30, 2023","format":false,"excerpt":"Progress and current operationsSince the last update, the drill bit and bottom hole assembly (BHA) were changed out anddrilling of the 8\u00bd\u201d hole section and reached 3,718 metres Measured Depth (\u201cmMD\u201d) wheresection Total Depth (TD) was called. The 8\u00bd\u201d hole section has reached the current depth of3,296 metres Measured Depth\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/10\/Exalo-202-Rig-1.jpeg?fit=1024%2C681&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12803,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-drilling-indicates-elevated-gas-shows-fluorescence-confirms-working-hydrocarbon-system\/","url_meta":{"origin":13043,"position":4},"title":"ZIMBABWE: Mukuyu-1 Drilling Indicates Elevated Gas Shows &#038; Fluorescence Confirms Working Hydrocarbon System","author":"","date":"November 11, 2022","format":false,"excerpt":"\u2022 Fluorescence and elevated gas shows of up to 65 times above background levels in Upper Angwa primary target \u2022 Elevated gas shows and resistivity in shallower Pebbly Arkose formation \u2022 Working conventional hydrocarbon system confirmed in Cabora Bassa Basin \u2022 Preparing to drill ahead to planned total depth of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Exalo-202-Rig-at-Mukuyu-1.png?fit=604%2C312&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12862,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-1-to-be-sidetracked-as-borehole-conditions-deteriorate\/","url_meta":{"origin":13043,"position":5},"title":"ZIMBABWE: Mukuyu-1 to be Sidetracked as Borehole Conditions Deteriorate","author":"","date":"November 27, 2022","format":false,"excerpt":"\u2022 Mukuyu-1 successfully deepened to 3,923 metres Measured Depth (\u201cmMD\u201d), encountering additional elevated gas shows and fluorescence through to total depth \u2022 Results prove up potential of the Upper Angwa formation over a 900m gross interval \u2022 Upper Angwa formation thicker than pre-drill estimates, boding well for future prospectivity in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Zimbabwe-Baobab-1.png?fit=614%2C393&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=13043"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13043\/revisions"}],"predecessor-version":[{"id":13046,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/13043\/revisions\/13046"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/12689"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=13043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=13043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=13043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}