{"id":12683,"date":"2022-09-21T11:06:25","date_gmt":"2022-09-21T11:06:25","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12683"},"modified":"2022-09-21T11:06:25","modified_gmt":"2022-09-21T11:06:25","slug":"opinion-ugandas-oil-and-gas-projects-the-value-at-stake","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/opinion-ugandas-oil-and-gas-projects-the-value-at-stake\/","title":{"rendered":"OPINION: Uganda\u2019s Oil and Gas Projects: The Value at Stake"},"content":{"rendered":"<p>By Peninah Aheebwa: <strong><em>an Energy Economist and the Director Technical Support Services at the Petroleum Authority of Uganda<\/em><\/strong><\/p>\n<p>The East Africa Crude Oil Pipeline project (EACOP), which is meeting resistance from opponents of Uganda\u2019s development, is one of the projects Uganda has planned to monetize its oil and gas assets, which are currently valued at US$ 116 billion (gross). These assets are certainly among the country\u2019s biggest economic assets in terms of value.<\/p>\n<p>Some of the strategic reasons for choosing to export about 57% of the crude oil to be produced in the country are to access the international market, enhance the country\u2019s export base and the trade balance which is currently in deficit.<\/p>\n<p>The other project for monetizing the country\u2019s oil and gas assets is the Refinery, with a strategic objective of meeting Uganda\u2019s petroleum products needs that are currently estimated at 36,000 barrels\/day and growing at an annual rate of about 7%. This would also save the country foreign exchange expenditure of over US$ 1.23 Billion per year.<\/p>\n<p>Among the main petroleum products expected to be produced under the oil production (Tilenga and Kingfisher) and the refinery projects is Liquified Petroleum Gas (LPG). Production of LPG, which is mainly used in households and would be a key replacement to the use of charcoal and firewood is expected to be produced at a scale of over\u00a0<strong>300,000 tons per year\u00a0<\/strong>at peak production. This amount is close to the total amount of LPG currently being consumed in the whole of East Africa.<\/p>\n<p>The life cycle of the above projects is under 30 years, which is far below the target by the most radicle energy transition pledges.<\/p>\n<p>The size of Uganda\u2019s economy as reported by the Ministry of Finance Planning and Economic Development is US $ 45.7 billion, with expected domestic revenue of US $ 6 Billion (13% of GDP) in 2022\/23.\u00a0 The economy is dominated by the services sector at 41.5%, followed by industry at 26.8% and the agriculture sector at 24.1%. The country recorded a trade deficit of US$ 413.80 Million in May 2022. In addition, the country has very high levels of unemployment.<\/p>\n<p>Economies like the United Arab Emirates (UAE) and Norway, among others, were not in a different situation from the above at the start of their oil and gas industry. These economies were able to leverage on their oil and gas resources to achieve economic take off. Uganda\u2019s oil and gas projects can significantly contribute to the country\u2019s economic takeoff, given the fiscal and non-fiscal benefits expected to accrue to the country.<\/p>\n<p>The key drivers include:<\/p>\n<ul>\n<li>The magnitude of the expected investments, estimated at $15 \u2013 20billion, in a space of 3 \u2013 5 years which will triple the country\u2019s Foreign Direct Investments during this period.<\/li>\n<li>Reasonable in-country capacity to ensure a significant share of the investments in form of employment and provision of goods and services is retained in the country.<\/li>\n<li>A fair share for government from the expected oil revenues (close to an average of 70%)<\/li>\n<li>The institutional, regulatory and governance infrastructure to ensure government\u2019s share in the oil revenues is secured and put to good use.<\/li>\n<\/ul>\n<p>The frameworks for the country\u2019s oil and gas sector now in place together with the activities being implemented make it clear that the oil and gas industry is going to be transformational on Uganda\u2019s economy and in improving the wellbeing of its citizens. It is therefore only rational that this upcoming transformation is welcomed and supported. The benefits are coming in a number of forms; i) revenue from the agreed fiscal regime; ii) the participation of Ugandans and Ugandan Enterprises through employment and provision of goods and services also known as National Content; iii) local social and economic development; iv) sectoral linkages to ensure broad based growth; and v) improved investment rating of the country, among others.<\/p>\n<h2><strong>Fiscal benefits through the agreed regimes (US$ 70 Billion)<\/strong><\/h2>\n<p><strong><a name=\"_Toc105773820\"><\/a>Pre-first oil Tax and Non-Tax Revenues<\/strong><\/p>\n<p>From 2017 to 2021, a total of\u00a0<strong>UGX<\/strong>\u00a0<strong>577.4 million<\/strong>\u00a0was paid by the five Oil Companies licensed in the country. The revenue was in the form of Income Tax, PAYE, Stamp Duty, Value Added Tax and Withholding Tax.<\/p>\n<p>During the same period,\u00a0<strong>US<\/strong><strong>$<\/strong>\u00a0<strong>7,662,580\u00a0<\/strong>was received from the Oil and Gas Sector in form of Non-Tax Revenue (NTR). These payments were received with respect to Application fees, Bonuses, Data sale, Surface rentals and Training fees.<\/p>\n<h3><strong>Expected revenues through the agreed fiscal regime after first oil<\/strong><\/h3>\n<p>The fiscal regimes between the upstream (Tilenga and Kingfisher) and midstream (EACOP and Refinery) projects differ and so are the expected returns to government from the same.<\/p>\n<p>The Upstream projects are run under a Joint Venture arrangement with TotalEnergies holding an interest of 56.66% in all the projects, CNOOC holding a 28.<a name=\"_Toc105773821\"><\/a>33% interest and the Uganda National oil company (UNOC) holding an interest of 15% on behalf of the Government of Uganda.<\/p>\n<p>The pipeline project is managed through the EACOP Company with shareholding from the Uganda National Oil Company (15%), the Tanzania Petroleum Development Corporation (15%) and the two oil companies; TotalEnergies (62%) and CNOOC (8%). Government will hold a 40% share in the refinery project.<\/p>\n<p>Using the prevailing assumptions, government is entitled to a net Take of 75% from the upstream projects which translates to US$ 66 billion (US$ 2.6 billion per year) with the 25% going to paying the investors\u2019 return. From the EACOP, through dividends and applicable taxes government is expected to earn US$ 400 million. From the refinery, through dividends and applicable taxes, government is expected to earn US$ 3.3 billion.<\/p>\n<p>In this regard, from the three main projects as indicated in the chart below government earns a total of US$ 69.7 billion over the projects\u2019 life and an average of US$ 2.8 billion per year. This expected average annual income to government is 47% of the projected domestic revenue collection for the 2022\/2023 (US$ 6billion). It is expected that in line with the Public Finance Management Act 2015, this money will be earmarked for investment and infrastructure development therefore, bridging the infrastructure financing gap estimated at US$ 400 million per year.<\/p>\n<p>Continue reading <a href=\"https:\/\/www.pau.go.ug\/ugandas-oil-and-gas-projects-the-value-at-stake\/\">HERE<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Peninah Aheebwa: an Energy Economist and the Director Technical Support Services at the Petroleum Authority of Uganda The East Africa Crude Oil Pipeline project (EACOP), which is meeting resistance &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/opinion-ugandas-oil-and-gas-projects-the-value-at-stake\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5787,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[6178,7414,2042,2129,7413,2603],"class_list":["post-12683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-eacop","tag-kingfisher","tag-pipeline","tag-refinery","tag-tilenga","tag-uganda","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/Uganda-rig.jpg?fit=699%2C466&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3iz","jetpack-related-posts":[{"id":6012,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-tanzania-sign-inter-governmental-agreement-east-african-crude-oil-pipeline\/","url_meta":{"origin":12683,"position":0},"title":"Uganda,Tanzania sign Inter Governmental Agreement for Crude Oil Pipeline","author":"","date":"May 27, 2017","format":false,"excerpt":"The Governments of Uganda and of Tanzania have signed the Inter-Governmental Agreement (IGA) for the East African Crude Oil Pipeline (EACOP) Project. The IGA was signed by Uganda\u2019s Eng. Irene Muloni, Minister of Energy and Mineral Development and Tanzania\u2019s Hon. Prof. Palamagamba John A.M Kabudi, Minister for Constitutional and Legal\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/EACOP-IGA-signing-by-Uganda-Tanzania-Ministers.jpg?fit=472%2C315&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":9987,"url":"https:\/\/www.oilnewskenya.com\/index.php\/east-african-crude-oil-pipeline-construction-to-commence-in-3-weeks\/","url_meta":{"origin":12683,"position":1},"title":"UGANDA\/ TANZANIA: East African Crude Oil Pipeline Construction to Commence in 3 Weeks","author":"","date":"February 25, 2021","format":false,"excerpt":"Construction of the World\u2019s longest heated crude oil pipeline the East African Crude Oil Pipeline (EACOP) is set to begin in the second week of March according to Uganda\u2019s Foreign Affairs Minister Palamagamba\u00a0 Kabudi citing Total\u2019s E&P director for Africa in a meeting held in Paris according to Uganda's .\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6488,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-president-to-lay-cross-border-mark-stone-for-oil-pipeline-uganda\/","url_meta":{"origin":12683,"position":2},"title":"Tanzania President to Lay Cross Border Mark Stone For Oil Pipeline in Uganda","author":"","date":"November 6, 2017","format":false,"excerpt":"President John Maghufuli of Tanzania and host President Yoweri Museveni will on Thursday lay a cross border mark stone at Luzinga village in Uganda for the East Africa Crude Oil Pipeline. This follows the visit by the Uganda president to Tanga in February where the two state leaders laid a\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/08\/East-Africa-Crude-Oil-Pipeline-launch.png?fit=652%2C389&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/08\/East-Africa-Crude-Oil-Pipeline-launch.png?fit=652%2C389&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/08\/East-Africa-Crude-Oil-Pipeline-launch.png?fit=652%2C389&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6225,"url":"https:\/\/www.oilnewskenya.com\/index.php\/total-ep-reassures-uganda-commitment-following-entrance-kenyas-oil-rich-turkana\/","url_meta":{"origin":12683,"position":3},"title":"Total E&#038;P Reassures Uganda of its Commitment Following Entrance into Kenya\u2019s Oil Rich Turkana","author":"","date":"August 23, 2017","format":false,"excerpt":"Total has written to Uganda assuring the country that it will not abandon the $3.55 billion heated crude oil pipeline through Tanzania after buying assets in neighbouring Kenya. The news on the transaction between Total and Maersk Oil and Gas had caused panic in Uganda on the progress of the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/12\/total.jpg?fit=600%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/12\/total.jpg?fit=600%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/12\/total.jpg?fit=600%2C400&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11726,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-jv-to-announce-eacop-kingfisher-tilenga-projects-final-investment-decision\/","url_meta":{"origin":12683,"position":4},"title":"Uganda JV to announce EACOP, Kingfisher &#038; Tilenga Projects Final Investment Decision","author":"","date":"January 31, 2022","format":false,"excerpt":"The joint venture partners in Uganda's Tilenga and East Africa Crude Oil Projects Total Energies, CNOOC and state-owned UNOC are expected to announce reaching the final investment decision tomorrow two months after CNOOC reached FID on the Kingfisher project. The announcement is expected tomorrow at 10am in Kampala paving way\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/01\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/01\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/01\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/01\/Tilenga-Project.jpg?fit=1007%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14191,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-details-revealed-of-worlds-longest-heated-crude-oil-pipeline-using-hi-tech-satellite-technology-to-minimise-environmental-damage-threat\/","url_meta":{"origin":12683,"position":5},"title":"UGANDA: Details Revealed of World\u2019s Longest Heated Crude Oil Pipeline Using Hi-Tech Satellite Technology to Minimise Environmental Damage Threat","author":"","date":"November 27, 2023","format":false,"excerpt":"Details of what will be the world\u2019s longest heated crude oil pipeline, carrying oil from Uganda to the Indian Ocean coast of Tanzania, have been revealed showing how a cocoon of electrical and fibre-optic cables along its entire 1,443 km length will provide heat and real-time satellite surveillance to prevent\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12683"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12683\/revisions"}],"predecessor-version":[{"id":12684,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12683\/revisions\/12684"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5787"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}