{"id":12666,"date":"2022-09-19T07:26:32","date_gmt":"2022-09-19T07:26:32","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12666"},"modified":"2022-09-19T07:26:44","modified_gmt":"2022-09-19T07:26:44","slug":"stena-drilling-secures-contract-with-cnooc-for-mobile-offshore-drilling-unit-modu-stena-icemax","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/stena-drilling-secures-contract-with-cnooc-for-mobile-offshore-drilling-unit-modu-stena-icemax\/","title":{"rendered":"GABON: Stena Drilling Secures Contract with CNOOC  for Mobile Offshore Drilling Unit (MODU) Stena Icemax"},"content":{"rendered":"<p>The two (2) well program, scheduled for Q1 2023, will be off the coast of Gabon and has an estimated total campaign duration of 90 days.<\/p>\n<p>CNOOC International \u2013 through its CNOOC West Africa Holdings Limited affiliate \u2013 holds a 100% working interest and is the operator in Blocks BC 9 and BCD 10, offshore Gabon.<\/p>\n<p>In 2014, a large deepwater gas discovery on the BCD 10 licence was announced following the drilling and appraisal of the Leopard-1 well, located approximately 145 kilometres off the Gabon coast. Multiple pre-and-post-salt prospects and leads have been identified with high exploration potential.<\/p>\n<p><span lang=\"EN-US\">&#8220;Stena Drilling are delighted to secure this repeat business with CNOOC and look forward to working with CNOOC to complete this campaign,&#8221; the company said in a statement<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The two (2) well program, scheduled for Q1 2023, will be off the coast of Gabon and has an estimated total campaign duration of 90 days. CNOOC International \u2013 through &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/stena-drilling-secures-contract-with-cnooc-for-mobile-offshore-drilling-unit-modu-stena-icemax\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":12667,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7447,7442,11,7444],"tags":[10727,10728,476,944,10726,10725],"class_list":["post-12666","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-central-africa","category-countries","category-top-news","category-west-africa","tag-block-bc-9","tag-block-bcd-10","tag-cnooc","tag-gabon","tag-stena-drilling","tag-stena-icemax","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/stena-icemax.png?fit=939%2C526&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3ii","jetpack-related-posts":[{"id":11137,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-bambo-1-well-drilling-commences-offshore-block-a2\/","url_meta":{"origin":12666,"position":0},"title":"GAMBIA: Bambo-1 Well Drilling Commences Offshore Block A2","author":"","date":"November 15, 2021","format":false,"excerpt":"FAR Gambia advises that drilling has commenced on the Bambo-1 exploration well in Block A2, offshore The Gambia. The Stena IceMax drillship arrived on site on 12 November Gambian time and after completing preparations, has successfully spudded the well. The Bambo-1 well is located approximately 85km offshore The Gambia, in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":10997,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-drilling-of-bambo-1-well-expected-to-commence-in-1-month\/","url_meta":{"origin":12666,"position":1},"title":"GAMBIA: Drilling of Bambo-1 well Expected to Commence in 1 Month","author":"","date":"October 18, 2021","format":false,"excerpt":"FAR says operational and logistics planning for the drilling of the Bambo-1 well in offshore Block A2 \u00a0are well advanced and the IceMax drillship is scheduled to be in Las Palmas in late October to complete preparations and loading before mobilizing to The Gambia. FAR has been advised that the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":10446,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-far-drilling-of-bambo-1-well-on-target-for-q4\/","url_meta":{"origin":12666,"position":2},"title":"Gambia: FAR drilling of Bambo-1 well on target for Q4","author":"","date":"June 17, 2021","format":false,"excerpt":"FAR Limited has locked in the timetable for drilling the Bambo-1 well offshore The Gambia by executing a contract with Stena Drillmax Ice Limited to commence drilling operations in Q4 of this year. The Bambo-1 well in Block A2 offshore The Gambia, is designed to drill into 3 prospects with\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":13155,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-stena-drilling-signs-new-contract-with-shell-in-the-mediterranean\/","url_meta":{"origin":12666,"position":3},"title":"EGYPT:  Stena Drilling Signs New Contract with Shell in the Mediterranean","author":"","date":"January 17, 2023","format":false,"excerpt":"Stena Drilling\u00a0has signed a new contract with\u00a0BG Delta\u00a0and\u00a0BG International\u00a0subsidiaries of\u00a0Shell\u00a0for the\u00a0Mobile Offshore Drilling Unit (MODU) Stena Forth. The operations for\u00a0Stena Forth\u00a0in\u00a0Egypt are due to commence in 2023 upon completion of existing contractual commitments.\u00a0The Shell exploration project will entail 3 wells in the Mediterranean. The project will require Managed Pressure Drilling\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Stena-Forth.jpg?fit=400%2C300&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10621,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-bambo-1-well-oncourse-for-spudding-in-q4-of-2021\/","url_meta":{"origin":12666,"position":4},"title":"GAMBIA: Bambo-1 well Oncourse for Spudding in Q4 of 2021","author":"","date":"July 22, 2021","format":false,"excerpt":"FAR has contracted Exceed\u2019s wells management team in Aberdeen to assist with the planning and execution of the well. The contract for the drillship was executed during the quarter and rig owner and operator, Stena, has advised the window for mobilisation of the Stena IceMax drillship to Gambia to be\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/Gambia-Bambo-1-well.jpg?fit=378%2C400&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10836,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-chariot-oil-gas-awards-drilling-contract-ahead-of-december-appraisal-drilling\/","url_meta":{"origin":12666,"position":5},"title":"MOROCCO: Chariot Oil &#038; Gas Awards Drilling Contract Ahead of December Appraisal Drilling","author":"","date":"September 7, 2021","format":false,"excerpt":"Chariot has announced that it has signed a contract with Stena Drilling to use its Stena Don drilling rig for the planned Anchois gas appraisal well within the Lixus licence, offshore Morocco. \u2022 Drilling operations anticipated to commence in December 2021 and are expected to take up to approximately 40\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/MOROCCO-Anchois-1.jpg?fit=700%2C577&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/MOROCCO-Anchois-1.jpg?fit=700%2C577&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/MOROCCO-Anchois-1.jpg?fit=700%2C577&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/MOROCCO-Anchois-1.jpg?fit=700%2C577&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12666","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12666"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12666\/revisions"}],"predecessor-version":[{"id":12669,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12666\/revisions\/12669"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/12667"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12666"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12666"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12666"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}