{"id":12610,"date":"2022-09-01T12:52:53","date_gmt":"2022-09-01T12:52:53","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12610"},"modified":"2022-09-01T13:52:32","modified_gmt":"2022-09-01T13:52:32","slug":"toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/","title":{"rendered":"Toshiba ESS, KenGen Conclude MoU on O&#038;M Services for Geothermal Power Plants"},"content":{"rendered":"<p>Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems &amp; Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&amp;M) services for geothermal power plants in developing countries including \u00a0East African countries through a combination of KenGen and Toshiba ESS\u2019s know-how and networks. This MoU was signed during TICAD 8 held in Tunisia in August 27and 28.<\/p>\n<p>KenGen produces about 60% of the electricity installed in the country, with 86% generated from renewable energy, such as hydropower, wind power, and geothermal power. For geothermal power, KenGen has a 799 MW generation installed capacity, including the Olkaria Geothermal Power Plants, Kenya\u2019s largest geothermal power complex. Under this MOU, KenGen will contribute to the development of geothermal power plants in East African countries and become the \u201cThe point of expert reference\u201d in Africa.<\/p>\n<p>KenGen Managing Director &amp; CEO, Rebecca Miano said \u201cGeothermal energy provides sustainable power supply. It is a resource we have in abundance in Kenya, an advantage that has enabled us to build a considerable wealth of expertise in its exploration and development. This we have done for more than 50 years.\u201d<\/p>\n<p>Toshiba ESS has delivered 60 geothermal power generation sets with a total capacity of about 3,790 MW all over the world, including Africa. It also supplied 4 sets of 70 MW steam turbines and generators for KenGen\u2019s Olkaria I and IV Geothermal Power Plants.<\/p>\n<p>\u201cI\u2019m delighted to announce this cooperation with KenGen, Toshiba ESS has collaborated in the development of geothermal power generation and human resources in Uganda, Malawi, and other East African countries. Through this collaboration, I\u2019m convinced that we can contribute to supplying clean and safe energy in the regions with KenGen.\u201d said Toshiba ESS Business Development Executive, Toyoaki Fujita.<\/p>\n<p>There is an ongoing survey to identify geothermal resources in the Great Rift Valley, a tectonic plate boundary running from north to south with immense geothermal potential. Both companies are delighted to cooperate in this opportunity, and plan further business expansion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems &amp; Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&amp;M) &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":12505,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[671,990,5694,1250,1252,1488,10700,10699,2603],"class_list":["post-12610","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-east-africa","tag-geothermal","tag-great-rift-valley","tag-kengen","tag-kenya","tag-malawi","tag-ticad-8","tag-toshiba-ess","tag-uganda","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=2048%2C1367&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3ho","jetpack-related-posts":[{"id":9903,"url":"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-clinches-multi-well-geothermal-drilling-programme-contract\/","url_meta":{"origin":12610,"position":0},"title":"DJIBOUTI: KenGen Clinches Multi-well Geothermal drilling Programme Contract","author":"","date":"February 15, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) PLC has won yet another international contract to drill three geothermal wells in Djibouti. The company today signed a Ksh 709,822, 630 (USD 6,452,933) contract with Office Djiboutien De Development De lenergie Geothermique (Djiboutian Office of Geothermal Energy Development) (ODDEG). The ceremony, in Galla Le\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/KenGen-Djibouti.jpg?fit=1024%2C602&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/KenGen-Djibouti.jpg?fit=1024%2C602&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/KenGen-Djibouti.jpg?fit=1024%2C602&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/KenGen-Djibouti.jpg?fit=1024%2C602&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12230,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-drilling-the-seventh-geothermal-well-at-the-aluto-langano-geothermal-field\/","url_meta":{"origin":12610,"position":1},"title":"ETHIOPIA: KenGen Completes Drilling the Seventh Geothermal Well at the Aluto-Langano Geothermal field","author":"","date":"April 30, 2022","format":false,"excerpt":"Kenya Electricity Generating Company PLC (KenGen) has completed drilling of the seventh geothermal well in Ethiopia further bolstering the company\u2019s renewable energy footprint in the Horn of Africa. This latest announcement is from the Aluto-Langano geothermal site where KenGen is implementing a drilling consultancy project for the state-owned Ethiopian Electric\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12196,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-kengen-completes-construction-of-olkaria-i-unit-6-geothermal-power-plant\/","url_meta":{"origin":12610,"position":2},"title":"KENYA: KenGen Completes Construction of Olkaria I Unit 6 Geothermal Power Plant","author":"","date":"April 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has completed the construction of the 83MW Olkaria I, Additional Unit (AU) 6 Geothermal Power Plant, setting in motion activities to add it to the national power grid. This milestone follows a successful delivery of full steam to the power plant, setting in motion technical\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11131,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-eeps-deepest-geothermal-well\/","url_meta":{"origin":12610,"position":3},"title":"Ethiopia KenGen Completes EEP&#8217;s Deepest Geothermal Well","author":"","date":"November 12, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has announced the completion of a 3,000-meter geothermal well in Ethiopia, which exceeded the target of 2,750 meters. This is the second of eight wells it has been commissioned to drill by Ethiopian Electric Power Company (EEP) the state-owned electricity producer as Ethiopia seeks to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4969,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-strikes-30mw-geothermal-well-in-olkaria-africas-biggest\/","url_meta":{"origin":12610,"position":4},"title":"KenGen strikes 30MW geothermal well in Olkaria, Africa\u2019s biggest","author":"","date":"December 14, 2015","format":false,"excerpt":"Olkaria OW-921 is one of the five biggest geothermal wells in the world Kenya Electricity Generating Company (KenGen) has successfully drilled one of the biggest geothermal wells in the world, boosting Kenya\u2019s quest to triple her power generation capacity to 5,000 megawatts. The well, with a production capacity of 30\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11239,"url":"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-commences-multi-well-drilling-campaign\/","url_meta":{"origin":12610,"position":5},"title":"DJIBOUTI: KenGen Commences Multi-well Drilling Campaign","author":"","date":"November 25, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) PLC has commenced drilling of the first of three geothermal wells in Djibouti setting in motion a Ksh.0.7 billion contract signed in February this year. The drilling of the first well is expected to take about two months to complete as KenGen seeks to export\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12610"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12610\/revisions"}],"predecessor-version":[{"id":12611,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12610\/revisions\/12611"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/12505"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}