{"id":12389,"date":"2022-06-29T08:20:11","date_gmt":"2022-06-29T08:20:11","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12389"},"modified":"2022-06-29T08:20:11","modified_gmt":"2022-06-29T08:20:11","slug":"egypt-sdx-energy-spuds-msd-23-infill-development-well-commences-production-from-msd-24","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-msd-23-infill-development-well-commences-production-from-msd-24\/","title":{"rendered":"EGYPT: SDX Energy Spuds MSD-23 infill development well, Commences Production from MSD-24"},"content":{"rendered":"<p class=\"dc\"><span class=\"dd\">SDX Energy has announced the spudding of the MSD-23 infill development well on 24 June 2022 at the Meseda Field, West Gharib concession, Egypt. MSD-23 is targeting the primary Asl Formation reservoir at around 4,000 feet MD (3,200ft TVDSS). MSD-23 is the fifth well in a fully funded, 13-well development campaign on the Meseda and Rabul oil fields in the West Gharib concession.<\/span><span class=\"dd\">\u00a0<\/span><\/p>\n<p class=\"dc\"><span class=\"dd\">The fourth well of the campaign, MSD-24 (TD, 5 June 2022), has been connected to facilities and is currently producing at a gross rate of around 300 bbl\/d which is in line with pre-drill estimates. Operations at the third well, MSD-20, continue.<\/span><span class=\"dd\">\u00a0<\/span><\/p>\n<p class=\"dc\"><span class=\"dd\">The development drilling campaign is aimed at growing production to c.3,500 &#8211; 4,000 bbl\/d by mid-2023.<\/span><span class=\"dg\">\u00a0<\/span><\/p>\n<p class=\"dh\"><span class=\"co\">Mark Reid, CEO of SDX, commented:<\/span><span class=\"co\">\u00a0<\/span><\/p>\n<p class=\"dh\"><span class=\"cg\">&#8220;I am pleased to announce the spudding of MSD-23, the fifth well in the 13-well infill drilling campaign on the West Gharib Concession together with the commencement of production from the recently completed MSD-24 well. With gross production from the field now reaching 2,150-2,200 bbl\/d we are anticipating further increasing production through the completion of operations at MSD-20 and the drilling of the eight remaining wells in the campaign over the next year. I look forward to updating the market further as the campaign progresses.&#8221;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SDX Energy has announced the spudding of the MSD-23 infill development well on 24 June 2022 at the Meseda Field, West Gharib concession, Egypt. MSD-23 is targeting the primary Asl &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-msd-23-infill-development-well-commences-production-from-msd-24\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":11465,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[709,9684,10497,7626],"class_list":["post-12389","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-egypt","tag-meseda-field","tag-rabul-field","tag-west-gharib","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=2048%2C1405&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3dP","jetpack-related-posts":[{"id":12532,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egyptsdx-energy-spuds-msd-27-infill-development-well\/","url_meta":{"origin":12389,"position":0},"title":"EGYPT:SDX Energy Spuds MSD-27 Infill Development Well","author":"","date":"August 2, 2022","format":false,"excerpt":"SDX Energy has announced the spudding of the MSD-27 infill development well on\u00a021 July 2022\u00a0at the Meseda Field, West Gharib concession,\u00a0Egypt. MSD-27 is targeting the primary Asl Formation reservoir at around 3,900 feet MD (3,100 feet TVDSS) and is the sixth well in a fully-funded, 13 well development campaign on\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11690,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-msd-25-infill-development-well-on-the-meseda-field\/","url_meta":{"origin":12389,"position":1},"title":"EGYPT: SDX Energy Spuds MSD-25 infill development well on the Meseda field","author":"","date":"January 24, 2022","format":false,"excerpt":"SDX Energy has announced the spudding of the MSD-25 infill development well on the Meseda field. This well is the second in a fully-funded 12 well development campaign on the Meseda and Rabul oil fields in the West Gharib concession, Egyptian Eastern Desert. The development drilling campaign is aimed at\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/West-Gharib-Meseda.png?fit=519%2C493&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12264,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-the-msd-24-infill-development-well-on-the-meseda-field\/","url_meta":{"origin":12389,"position":2},"title":"EGYPT: SDX Energy Spuds the MSD-24 Infill Development Well on the Meseda field","author":"","date":"May 18, 2022","format":false,"excerpt":"SDX Energy has spud the MSD-24 infill development well on the Meseda field. This well is the fourth in a fully-funded 13-well development drilling campaign on the Meseda and Rabul oil fields in the West Gharib concession in the Egyptian Eastern Desert. The campaign is aimed at growing production to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11007,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-msd-21-well-at-west-gharib-concession\/","url_meta":{"origin":12389,"position":3},"title":"EGYPT: SDX Energy Spuds MSD-21 Well at West Gharib Concession","author":"","date":"October 18, 2021","format":false,"excerpt":"SDX Energy has announced the spudding of the MSD-21 infill development well on the Meseda field. This well is the first, in a fully funded, 12 well development campaign on the Meseda and Rabul oil fields in the West Gharib concession, Egyptian Eastern Desert. The development drilling campaign is aimed\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/West-Gharib-Meseda.png?fit=519%2C493&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":11464,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-completion-of-drilling-at-msd-21-well-west-gharib-concession\/","url_meta":{"origin":12389,"position":4},"title":"EGYPT: Completion of Drilling at Msd-21 Well, West Gharib Concession","author":"","date":"December 24, 2021","format":false,"excerpt":"SDX Energy has announced the completion of drilling at the MSD-21 infill development well on the Meseda field in its West Gharib concession,\u00a0\u00a0Egypt. \u00a0MSD-21 encountered the primary top Asl Formation reservoir at 4,040ft MD (-3,251ft TVDSS) and reached a TD of 4,740ft. The well encountered 62.3ft of good-quality, net oil\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12333,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-completion-of-drilling-at-msd-24-well-west-gharib-concession\/","url_meta":{"origin":12389,"position":5},"title":"EGYPT : SDX Energy Completion Of Drilling At MSD-24 Well, West Gharib Concession","author":"","date":"June 13, 2022","format":false,"excerpt":"SDX Energy has completed of drilling at the MSD-24 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-24 encountered the primary top Asl Formation reservoir at 4,089ft MD (3,276ft TVDSS) and reached a TD of 4,625 feet MD on 5 June 2022. The well encountered\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12389"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12389\/revisions"}],"predecessor-version":[{"id":12390,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12389\/revisions\/12390"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/11465"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}