{"id":12241,"date":"2022-05-10T20:04:42","date_gmt":"2022-05-10T20:04:42","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12241"},"modified":"2022-05-10T20:04:42","modified_gmt":"2022-05-10T20:04:42","slug":"nigeria-decklar-resources-inc-commences-shipment-of-crude-oil-to-market-from-oza-oil-field","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-inc-commences-shipment-of-crude-oil-to-market-from-oza-oil-field\/","title":{"rendered":"NIGERIA: Decklar Resources Inc. Commences Shipment of Crude Oil to Market From Oza Oil Field"},"content":{"rendered":"<p>Decklar and its co-venturer Millenium Oil &amp; Gas Company Limited have commenced loading crude oil into trucks at the Oza Oil Field from storage tanks for delivery to the UPIL crude handling facilities for further transfer to the SPDC Joint Venture Forcados Oil Export Terminal via the Umugini Pipeline.<\/p>\n<p>The trucks are currently being loaded from crude oil storage tanks at the Oza site that hold approximately 22,000 barrels of oil. When loading of crude oil from storage to the trucks has reached approximately 5,000 barrels, production from the Oza-1 well into the storage tank will be re-started in order to enable ongoing shipments by truck to UPIL.<\/p>\n<p>As previously announced, 2022 development plans for the Oza Field include:<\/p>\n<ul>\n<li>finalizing arrangements with local communities and contractors to start construction of the access road and associated infrastructure for a new oil well drilling pad;<\/li>\n<li>drilling the first new development well;<\/li>\n<li>re-entry, re-completion, and flow testing of the other two existing wells (Oza-2 and Oza-4), including tie-in to existing production facilities;<\/li>\n<li>installation of a Central Production Facility and infrastructure tie-ins for new well locations to replace the current Early Production Facility; and<\/li>\n<li>drilling of up to two additional development wells.<\/li>\n<\/ul>\n<p>Development plans for the Oza Field beyond 2022 also include up to five additional development wells.<\/p>\n<p>Duncan Blount, CEO of Decklar Resources, said \u201cWe are very pleased to announce the start of crude oil loading operations at the Oza Field, which will soon lead to the Company\u2019s first delivery of oil to market. This brings the Company to the brink of the significant milestone of commencing full-time commercial production and the transformation of Decklar into a producing and cash-flowing company. We look forward with anticipation to starting new development drilling activities at the Oza Field in the near future and to continued progress on development activities at the Company\u2019s other fields.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Decklar and its co-venturer Millenium Oil &amp; Gas Company Limited have commenced loading crude oil into trucks at the Oza Oil Field from storage tanks for delivery to the UPIL &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-inc-commences-shipment-of-crude-oil-to-market-from-oza-oil-field\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":9013,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,11,7444],"tags":[9443,10468,10466,1749,10435,10467],"class_list":["post-12241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-top-news","category-west-africa","tag-decklar-resources","tag-forcados-oil-export-terminal","tag-millenium-oil-gas-company-limited","tag-nigeria","tag-oza","tag-umugini-pipeline","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-3br","jetpack-related-posts":[{"id":12674,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-announces-new-arrangements-for-delivery-and-export-of-crude-oil-from-oza-oil-field\/","url_meta":{"origin":12241,"position":0},"title":"NIGERIA: Decklar Announces New Arrangements for Delivery and Export of Crude Oil From Oza Oil Field","author":"","date":"September 20, 2022","format":false,"excerpt":"Decklar and its co-venturer Millenium Oil & Gas Company Limited have announce that the 7,800 barrels of crude oil (\u201cbbls\u201d) previously delivered to the Umugini Pipeline Infrastructure Limited crude handling facilities has now been delivered to the Forcados crude oil export terminal. The 7,800 bbls are ready for export pending\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12760,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-san-leon-energy-recommences-loading-crude-oil-into-trucks-at-the-oza-oil-field\/","url_meta":{"origin":12241,"position":1},"title":"NIGERIA: San Leon Energy Recommences Loading Crude Oil into Trucks at the Oza Oil Field","author":"","date":"November 1, 2022","format":false,"excerpt":"San Leon notes the announcement made on 27 October 2022 by Decklar Resources Inc. in Canada. \u00a0San Leon has a 11% shareholding in Decklar Petroleum Limited, the local subsidiary of Decklar operating in Nigeria, and has also made a US$5.5 million loan to DPL, via 10% per annum unsecured subordinated\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12502,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-announces-resumption-of-production-from-oza-1-well\/","url_meta":{"origin":12241,"position":2},"title":"NIGERIA: Decklar Announces Resumption of Production From Oza-1 Well","author":"","date":"July 26, 2022","format":false,"excerpt":"Decklar Resources provides an update regarding the resumption of production from the Oza-1 well at the Oza Oil Field in Nigeria. Decklar and its co-venturer Millenium Oil & Gas Company Limited have received the permits required to resume production from the Oza-1 well at the Oza Oil Field. Production from\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13167,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-restart-of-production-from-the-oza-4-well\/","url_meta":{"origin":12241,"position":3},"title":"NIGERIA: Restart of Production from the Oza-4 Well","author":"","date":"January 20, 2023","format":false,"excerpt":"Decklar and Millenium have recommenced production from the Oza Oil Field at a total production rate of approximately 1,300 bopd. The Oza-1 well is currently producing approximately 900 bopd of 22 API crude oil on a 20\/64 inch choke with wellhead pressure of 400 psi and 2.5% BS&W. Following successful\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":13676,"url":"https:\/\/www.oilnewskenya.com\/index.php\/san-leon-energy-provides-update-on-oza-field\/","url_meta":{"origin":12241,"position":4},"title":"NIGERIA: San Leon Energy Provides Update on Oza Field","author":"","date":"May 9, 2023","format":false,"excerpt":"San Leon say itcontinues to explore a potential sale of its non-core investments in DPL although the completion remains subject to the purchaser finalising its own funding arrangements, further details of which were most recently announced by San Leon on 24 March 2023. Part of the text of Decklar's announcement\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/05\/Oza-Oil-Field.png?fit=554%2C522&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/05\/Oza-Oil-Field.png?fit=554%2C522&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/05\/Oza-Oil-Field.png?fit=554%2C522&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":10381,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-oza-1-well-re-entry-on-coursewith-the-supporting-infrastructure-installed-operational\/","url_meta":{"origin":12241,"position":5},"title":"NIGERIA: Oza-1 well Re-entry On-coursewith the Supporting Infrastructure Installed &#038; Operational","author":"","date":"May 30, 2021","format":false,"excerpt":"Decklar has said it continues to make considerable progress on the Oza-1 well re-entry with the camp and all associated infrastructure fully installed and operational. The major components of the drilling rig equipment are being transported to the field this week and it is anticipated the rig will be completely\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12241"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12241\/revisions"}],"predecessor-version":[{"id":12242,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12241\/revisions\/12242"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/9013"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}