{"id":12145,"date":"2022-04-15T11:02:45","date_gmt":"2022-04-15T11:02:45","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12145"},"modified":"2022-04-15T11:02:45","modified_gmt":"2022-04-15T11:02:45","slug":"zimbabwe-mukuyu-prospect-confirmed-as-main-prospect-in-as-cabora-bassa-seismic-interpretation-completed","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-prospect-confirmed-as-main-prospect-in-as-cabora-bassa-seismic-interpretation-completed\/","title":{"rendered":"ZIMBABWE: Mukuyu Prospect Confirmed as Main Prospect in as Cabora Bassa Seismic Interpretation Completed"},"content":{"rendered":"<p>Since receiving all the final data processing deliverables from EarthSignal Processing in Calgary, Canada, Invictus has been interpreting the newly acquired seismic data of the 2021 Cabora Bassa 2D Seismic Survey, as well the concurrently reprocessed data of the 1990 legacy Mobil dataset.<\/p>\n<p>The interpretation is now largely completed and Invictus is pleased to confirm the following key outcomes:<br \/>\n\u2022 The large anticlinal Mukuyu Prospect (previously named Muzarabani) has been confirmed with prospectivity, including extensive seismic anomalies identified at<br \/>\nmultiple levels.<br \/>\n\u2022 Substantial new shallow target identified in the Post Dande horizon in Mukuyu<br \/>\n\u2022 A well location and a preliminary well trajectory has been developed for Mukuyu-1<br \/>\nwhich will target all key levels.<br \/>\n\u2022 11 major seismic horizons mapped<br \/>\n\u2022 An extensive array of Prospects and Leads has been identified along the basin margin,<br \/>\nmany of which are supported by anomalous seismic amplitude behaviour and the<br \/>\ninterpretation is being matured.<br \/>\n\u2022 Invictus will continue to assess each of the basin margin prospects and select the most<br \/>\nsuitable candidate to be drilled as the second well in the 2022 drilling campaign.<\/p>\n<p>Substantial new shallow target in Mukuyu Prospect (previously Muzarabani)<br \/>\nA very positive and encouraging amplitude anomaly association for the Mukuyu Prospect has emerged from the new CB21 Survey data and the reprocessed vintage data. The previously identified Post Dande Lead A, which was evident on a single vintage seismic line (90-MZH013), has now been extensively covered by multiple lines from the CB21 Survey and revealed an additional and material shallower target in the Mukuyu Prospect at the Horizon 200 Level (Post Dande).<\/p>\n<p>The extent of the amplitude anomalies (up to 16km along strike and 15km along dip) are<br \/>\ncoincident with the greater structural closure at the Horizon 200 Level (Post Dande) and shown in Figure 1. The amplitudes terminate at approximately the same two-way time (TWT) across all the dip and strike lines which may indicate the presence of trapped hydrocarbons across the broader structure.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12146 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect.png?resize=605%2C406&#038;ssl=1\" alt=\"\" width=\"605\" height=\"406\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect.png?w=605&amp;ssl=1 605w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect.png?resize=600%2C403&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect.png?resize=300%2C201&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect.png?resize=100%2C67&amp;ssl=1 100w\" sizes=\"auto, (max-width: 605px) 100vw, 605px\" \/><\/p>\n<p>Figure 1 &#8211; Mukuyu Prospect (formerly Muzarabani): Amplitude anomalies at Horizon 200 Level coincident with structural closure<\/p>\n<p>When these anomalies are extracted from along the interpreted horizon on which they lie, and then gridded and displayed as an overlay colour grid on the depth contour map for that particular horizon (200 Level), there is a remarkable fit to structure whereby the anomalous amplitudes, shown by the red colour in Figure 3, appear to extend down to, but not beyond the highlighted green contour.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12147 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-2.png?resize=606%2C327&#038;ssl=1\" alt=\"\" width=\"606\" height=\"327\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-2.png?w=606&amp;ssl=1 606w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-2.png?resize=600%2C324&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-2.png?resize=300%2C162&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-2.png?resize=100%2C54&amp;ssl=1 100w\" sizes=\"auto, (max-width: 606px) 100vw, 606px\" \/><\/p>\n<p>Figure 2 &#8211; Mukuyu Prospect (formerly Muzarabani): AVO Gradient at Horizon 200 Level (Post Dande) showing conformance to structure<\/p>\n<p>This coincidence of anomalous amplitude with fit to structure is regarded as a very strong<br \/>\nattribute for any prospect and a potential Direct Hydrocarbon Indicator (DHI).<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12148 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect3.png?resize=604%2C282&#038;ssl=1\" alt=\"\" width=\"604\" height=\"282\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect3.png?w=604&amp;ssl=1 604w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect3.png?resize=600%2C280&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect3.png?resize=300%2C140&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect3.png?resize=100%2C47&amp;ssl=1 100w\" sizes=\"auto, (max-width: 604px) 100vw, 604px\" \/><\/p>\n<p>Figure 3 &#8211; Mukuyu Prospect (formerly Muzarabani) Lambda Rho seismic inversion display at Horizon 200 Level<\/p>\n<p>Furthermore, a Lambda-Rho seismic inversion display (Figure 4), which can be used to<br \/>\ndistinguish rock and fluid properties, demonstrates gas prone indicators (lighter colours) which also shutoff at approximately the same two-way time across the structure.<br \/>\nHowever, it should be noted that the seismic data and amplitude anomalies are uncalibrated as the Cabora Bassa basin to date has not been drilled.<\/p>\n<p><strong>Planned Mukuyu-1 Well Trajectory &amp; Targets<\/strong><br \/>\nThe Mukuyu Prospect (formerly Muzarabani) has been clearly delineated as a large, robust, 4-way dip anticline. This is most evident on the dip and strike lines inFigure 4. The positions of these seismic lines are referenced on the depth map for one the key target levels (the purple horizon 500 on the seismic lines in Figure 4) and the proposed location for the Mukuyu-1 well.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12149 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-4.png?resize=607%2C285&#038;ssl=1\" alt=\"\" width=\"607\" height=\"285\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-4.png?w=607&amp;ssl=1 607w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-4.png?resize=600%2C282&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-4.png?resize=300%2C141&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-Prospect-4.png?resize=100%2C47&amp;ssl=1 100w\" sizes=\"auto, (max-width: 607px) 100vw, 607px\" \/><\/p>\n<p>Figure 4 &#8211; Mukuyu Prospect (Muzarabani) at one of primary targets Horizon 500 Level (Pebbly Arkose \/ Upper Angwa Alternations Member) and proposed Mukuyu-1 well location<\/p>\n<p>The extent of the Mukuyu closure is highlighted by the red contour on the depth map in Figure 4 and represents an area of approximately 200 square kilometres. All levels mapped show similar extensive 4-way dip closure.<\/p>\n<p>A deviated well is being planned to test the Mukuyu prospect at multiple target levels along the well path on the southern flank of the structure as shown in Figure 5. Primary Target levels (A to D) are highlighted, however, there are potentially others that may not necessarily exhibit anomalous amplitude character.<\/p>\n<p>Preparations to commence wellpad construction and civil works are well advanced with the contract awards completed and site surveying underway<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12150 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-1.png?resize=603%2C460&#038;ssl=1\" alt=\"\" width=\"603\" height=\"460\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-1.png?w=603&amp;ssl=1 603w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-1.png?resize=600%2C458&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-1.png?resize=300%2C229&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-1.png?resize=100%2C76&amp;ssl=1 100w\" sizes=\"auto, (max-width: 603px) 100vw, 603px\" \/><\/p>\n<p>Figure 5 &#8211; Mukuyu-1 (Muzarabani) Planned Well Trajectory &amp; Primary Targets<\/p>\n<p>The Mukuyu Prospect (formerly named Muzarabani) has been adopted to follow a new<br \/>\nprospect naming convention which takes after trees found in the project area. The Mukuyu tree is an indigenous sycamore fig whose canopy displays visual similarity to an anticlinal structure<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since receiving all the final data processing deliverables from EarthSignal Processing in Calgary, Canada, Invictus has been interpreting the newly acquired seismic data of the 2021 Cabora Bassa 2D Seismic &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-prospect-confirmed-as-main-prospect-in-as-cabora-bassa-seismic-interpretation-completed\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":12150,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[],"class_list":["post-12145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Mukuyu-1.png?fit=603%2C460&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-39T","jetpack-related-posts":[{"id":14502,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-multi-tcf-prospectivity-identified-in-eastern-cabora-bassa\/","url_meta":{"origin":12145,"position":0},"title":"ZIMBABWE: Multi Tcf prospectivity identified in Eastern Cabora Bassa","author":"","date":"September 3, 2024","format":false,"excerpt":"Invictus Energy Limited has provided an update on activities at its 80% owned and operated Cabora Bassa Project in Zimbabwe.Following the completion of the interpretation of the CB23 Seismic Survey data and a review of prospectivity in the eastern Cabora Bassa basin, eight key prospects have been defined in the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/09\/ZIMBABWE-CENTRAL-FAIRWAY.png?fit=610%2C243&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/09\/ZIMBABWE-CENTRAL-FAIRWAY.png?fit=610%2C243&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/09\/ZIMBABWE-CENTRAL-FAIRWAY.png?fit=610%2C243&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12397,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-reports-2-7-fold-in-mukuyu-prospect-assessment\/","url_meta":{"origin":12145,"position":1},"title":"ZIMBABWE: Invictus Energy Reports 2.7-fold in Mukuyu Prospect Assessment","author":"","date":"July 5, 2022","format":false,"excerpt":"Invictus Energy reports it has received an updated Independent Report from ERCE estimating substantial resource potential at its Cabora Bassa Project. ERCE estimates the gross mean recoverable conventional potential of the Mukuyu prospect at a combined 20 Tcf and 845 million barrels of conventional gas condensate, or about 4.3 billion\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/Exalo-Rug-202-Mud-Pumps-in-Transit-to-Zimbabwe.png?fit=606%2C319&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/Exalo-Rug-202-Mud-Pumps-in-Transit-to-Zimbabwe.png?fit=606%2C319&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/Exalo-Rug-202-Mud-Pumps-in-Transit-to-Zimbabwe.png?fit=606%2C319&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14892,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-selects-musuma-1-high-impact-well-location-set-to-spud-in-h2-2025\/","url_meta":{"origin":12145,"position":2},"title":"ZIMBABWE: Invictus Energy Selects Musuma-1 High-impact Well Location Set  to Spud in H2 2025","author":"","date":"April 15, 2025","format":false,"excerpt":"Invictus Energy has provided an update on the Musuma-1 well location following a highly productive in-country visit by the Invictus Energy Board of Directors. Musuma-1 has been confirmed as the first high-impact exploration well to be drilled outside the Mukuyu gas-condensate discovery area, targeting a new play type in the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/image-7.png?fit=526%2C523&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/image-7.png?fit=526%2C523&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/image-7.png?fit=526%2C523&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12246,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-seismic-inversion-results-show-potential-for-multiple-stacked-hydrocarbon-bearing-zones-in-mukuyu-prospect\/","url_meta":{"origin":12145,"position":3},"title":"ZIMBABWE: Seismic Inversion Results Show Potential for Multiple Stacked Hydrocarbon Bearing Zones in Mukuyu Prospect","author":"","date":"May 13, 2022","format":false,"excerpt":"Seismic inversion results show potential for multiple stacked hydrocarbon bearing zones in new Post Dande target (Horizon 200). Further quantitative analysis (QA) studies continue to provide support for the presence of potential hydrocarbons in the Mukuyu structure. The results from a seismic inversion\/QA study indicate that the section immediately below\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Zimbabwe-CB21-seismic.png?fit=647%2C379&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Zimbabwe-CB21-seismic.png?fit=647%2C379&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Zimbabwe-CB21-seismic.png?fit=647%2C379&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":13625,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-mukuyu-2-appraisal-and-phase-2-exploration-commences\/","url_meta":{"origin":12145,"position":4},"title":"ZIMBABWE: Mukuyu-2 Appraisal and Phase 2 Exploration Commences","author":"","date":"April 28, 2023","format":false,"excerpt":"During the quarter, Invictus commenced preparations for the Mukuyu-2 appraisal well andPhase 2 exploration campaign at its 80 per cent owned and operated Cabora Bassa project inZimbabwe.The tendering process commenced during the quarter for minor additional long leads and well services for the Mukuyu-2 well, which is anticipated to spud\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13339,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-commences-mukuyu-2-appraisal-well-program-phase-2-exploration\/","url_meta":{"origin":12145,"position":5},"title":"ZIMBABWE: Invictus Energy Commences Mukuyu-2 Appraisal Well Program &#038; Phase 2 Exploration","author":"","date":"February 24, 2023","format":false,"excerpt":"\u2022 Appraisal program commences with Mukuyu-2 spud targeted for early Q3 2023\u2022 Well services and long lead process tendering commenced\u2022 Mukuyu-1 post well analysis of pressure data indicates potential for significant gascolumns in Pebbly Arkose and Upper Angwa\u2022 Industry interest received to partner in project and forward work program\u2022 2D\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/02\/Zimbabwe-Cabora-Bassa.png?fit=479%2C663&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12145"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12145\/revisions"}],"predecessor-version":[{"id":12151,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12145\/revisions\/12151"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/12150"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}