{"id":12129,"date":"2022-04-14T21:15:57","date_gmt":"2022-04-14T21:15:57","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=12129"},"modified":"2022-04-14T21:15:57","modified_gmt":"2022-04-14T21:15:57","slug":"morocco-sound-energy-provides-tendrara-phase-1-mlng-development-update","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-provides-tendrara-phase-1-mlng-development-update\/","title":{"rendered":"MOROCCO: Sound Energy Provides Tendrara Phase 1 mLNG Development Update"},"content":{"rendered":"<p class=\"di\"><span class=\"da\">&#8211;\u00a0\u00a0\u00a0\u00a0 mLNG equipment and services provider Italfluid, has confirmed the issuance of purchase orders for the gas processing and liquefaction packages together with the LNG storage tank;<\/span><\/p>\n<p class=\"dj\"><span class=\"da\">&#8211;\u00a0\u00a0\u00a0\u00a0 Site preparation activities by Italfluid and Sound Energy at the Tendrara site location have commenced and are ongoing;<\/span><\/p>\n<p class=\"dj\"><span class=\"da\">&#8211;\u00a0\u00a0\u00a0\u00a0 Italfluid is advancing engineering in line with project schedule;<\/span><\/p>\n<p class=\"dj\"><span class=\"da\">&#8211;\u00a0\u00a0\u00a0\u00a0 Selection, by SEMEL, of engineering contractors for flow assurance, flowlines and owner engineering nearing completion;<\/span><\/p>\n<p class=\"dj\"><span class=\"da\">&#8211;\u00a0\u00a0\u00a0\u00a0 Wellhead servicing scope finalised and contractor appointment progressing; and<\/span><\/p>\n<p class=\"dk\"><span class=\"cq\">&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0<span class=\"cr\">Contract awarded by SEMEL to Petroleum Equipment Supply Engineering Company Limited to undertake scheduled inspection and routine maintenance of the wellhead Christmas tree assemblies on TE-6 and TE-7, the wells to supply the raw gas to the mLNG facility, with planning now underway for inspection and maintenance.<\/span><\/span><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"dg\"><strong><span class=\"cw\">Over the next 6 months, the following milestones are scheduled:<\/span><\/strong><span class=\"cq\">\u00a0<\/span><\/p>\n<p class=\"dj\"><span class=\"cq\">&#8211;\u00a0\u00a0\u00a0\u00a0 Completion of site access road improvements;<\/span><\/p>\n<p class=\"dj\"><span class=\"cq\">&#8211;\u00a0\u00a0\u00a0\u00a0 Placement of purchase orders for and execute flow assurance, flowlines and owners engineering scopes;<\/span><\/p>\n<p class=\"dj\"><span class=\"cq\">&#8211;\u00a0\u00a0\u00a0\u00a0 Execution of TE-6 and TE-7 wellhead inspection and servicing;<\/span><\/p>\n<p class=\"dj\"><span class=\"cq\">&#8211;\u00a0\u00a0\u00a0\u00a0 Flowline and associated equipment procurement process to commence; and<\/span><\/p>\n<p class=\"dj\"><span class=\"cq\">&#8211;\u00a0\u00a0\u00a0\u00a0 Italfluid will undertake the following:<\/span><\/p>\n<p class=\"dl\"><span class=\"cp\">o\u00a0<\/span><span class=\"cq\">Complete Preliminary Engineering and progress Detailed Design<\/span><\/p>\n<p class=\"dl\"><span class=\"cp\">o\u00a0<\/span><span class=\"cq\">Place remaining purchase orders for equipment\/packages and bulks<\/span><\/p>\n<p class=\"dm\"><span class=\"cp\">o\u00a0<\/span><span class=\"cq\">Complete site preparation and commence civils (foundations) works<\/span><\/p>\n<p class=\"dg\"><strong><span class=\"cw\">\u00a0<\/span><span class=\"cw\">Tendrara Phase 2 Development Financing Update<\/span><\/strong><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">Following the execution of the conditional binding 10-year gas sale and purchase agreement with ONEE announced on 30 November 2021 in respect of the proposed Tendrara Phase 2 gas development, the Company has been able to advance discussions with a broad range of financing partners.<\/span><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">Consequently, the Company has received non-binding terms sheets from a number of parties including banks and mezzanine financiers\u00a0<\/span><span class=\"da\">relating\u00a0<\/span><span class=\"da\">to potential capital provision for the proposed Tendrara Phase 2 Development. The Company is currently evaluating the term sheets and looks forward to providing further updates in due course.<\/span><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">In parallel, the Company is also progressing discussions with a number of international upstream service providers in relation to the potential provision of EPC services and vendor financing for the development of the proposed central processing facility (CPF) and gas export pipeline, associated with the Tendrara Phase 2 Development. There has been strong interest from credible counterparties offering the potential to mature alternative or complementary financing to debt and\/or mezzanine financing.<\/span><span class=\"da\">\u00a0<\/span><\/p>\n<p class=\"dh\"><strong><span class=\"cq\">Eastern Morocco Exploration Update<\/span><\/strong><\/p>\n<p class=\"dg\"><span class=\"cq\">\u00a0<\/span><span class=\"cq\">Whilst the Company has strategically prioritised its gas monetisation strategy through the phased development of the TE-5 Horst (Tendrara Production Concession), the Company has also re-evaluated the extensive exploration portfolio within the Greater Tendrara and Anoual exploration permits surrounding the Tendrara Production Concession.\u00a0 By integrating the acquired data and learnings from previous drilling campaigns with acquired and reprocessed seismic datasets, the Company has high graded several potential near term subsalt drilling opportunities within the Trias Argilo-Gr\u00e9seux Inf\u00e9rieur (TAGI) gas reservoir, the proven reservoir of the TE-5 Horst gas accumulation. <\/span><span class=\"cq\">\u00a0<\/span><\/p>\n<p class=\"dg\"><span class=\"cq\">These targets include the exploration prospect &#8216;M5&#8217; located on the \u00a0Anoual permits, together with the potential of the structures previously drilled on the Greater Tendrara permits, SBK-1 and TE-4.\u00a0 Both SBK-1 and TE-4, drilled in 2000 and 2006 respectively, encountered gas shows in the TAGI reservoir. SBK-1 flowed gas to surface during testing in 2000 at a peak rate of 4.41 mmscf\/d post acidification, but was not tested with mechanical stimulation.\u00a0 Mechanical stimulation has proven to be a key technology to commercially unlock the potential of the TAGI gas reservoir in the TE-5 Horst gas accumulation and accordingly the Company believes this offers potential to unlock commerciality elsewhere in the basin.\u00a0<\/span><span class=\"cq\">\u00a0<\/span><\/p>\n<p class=\"dh\"><strong><span class=\"cw\">Strategic Update<\/span><\/strong><\/p>\n<p class=\"dg\"><span class=\"cw\">\u00a0<\/span><span class=\"cw\">In 2020, Sound Energy announced that it was pivoting its monetisation strategy from predominantly high impact, frontier exploration towards a development-led commercialisation approach, as subsequently evidenced through progression of the phased development of the Tendrara Production Concession.<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">\u00a0<\/span><span class=\"cw\">Since 2020, aside from the ongoing development of the Company&#8217;s existing portfolio, the Company has been assessing a basket of opportunities to build out, diversify and grow Sound Energy both organically and inorganically. These assessments have included potential further gas related opportunities and potential renewable energy projects, including wind and solar power generation, leveraging the Company&#8217;s skills, relationships and existing position in Morocco. \u00a0<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">\u00a0<\/span><span class=\"cw\">Consequently, the Company is pleased to announce that its wholly owned subsidiary, Sound Energy Sustainables Limited (SESL), is in discussions with a number of Moroccan industrial scale farmers proximate to the Company&#8217;s Sidi Moktar exploration permits to evaluate the provision of 4.3MW of solar powered electricity (with realisable opportunities to scale beyond this area). Following completion of a feasibility study SESL now plans to further discussions with the farmers to seek to finalise a power supply contract(s) with a view to replacing carbon based, grid sourced electricity via the potential solar project. In parallel, the Company is maturing the capital funding alternatives to finance the modest solar development costs and further announcements in relation to this potential project will be announced, as appropriate, in due course.<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">\u00a0<\/span><span class=\"cw\">SESL is also evaluating a number of additional renewables projects which may provide the opportunity to offer attractive returns to Sound Energy.<\/span><\/p>\n<p class=\"dg\"><span class=\"cw\">\u00a0<\/span><span class=\"cw\">Whilst the Company is excited about the possibilities for growth in the renewables sector and believes that it is well-positioned to unlock such opportunities, Sound Energy remains committed to supporting the energy transition by continuing to develop its existing gas projects as well as additional gas opportunities. The recent strengthening of the global commodities market and the increased focus on energy security within Europe and North Africa has underscored the strategic rationale of developing gas resources and the attractiveness of the region. Consequently, the Company has developed a funnel of organic and inorganic opportunities within the gas sector, in Morocco and beyond. This includes gas storage and gas importation together with more conventional development of gas fields, all of which are characterised by offering the potential for immediate to near term cash generation. The Company looks forward to providing further updates on developments in this regard as the growth funnel matures.<\/span><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"dn\"><span class=\"cw\">Graham Lyon, Sound Energy&#8217;s Executive Chairman, commented:<\/span><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"do\"><span class=\"cw\">&#8220;We are pleased to announce these updates today following a period of concerted focus on the future strategy of the Company. The updates highlight the significant progress that Sound Energy has been making to put the key elements in place to create sustained shareholder value through the development of a cash generative, self-financing business centred around society&#8217;s aspirations, and Sound Energy&#8217;s strategy to accelerate the energy transition. We are on a path to building a quality portfolio that fully reflects our aspiration to be a key player right across the energy transition landscape.<\/span><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"do\"><span class=\"cw\">The Tendrara Phase 1 mLNG project is now well underway and the Tendrara Phase 2 Development, which is significantly greater in scale than Phase 1 and therefore offers the potential for greater rewards, but also presents more challenges from a financing perspective, is also moving forward. Following the execution of the binding gas sales and purchase agreement with ONEE in November 2021, we have been able to materially advance financing discussions and I am pleased that not only do we have strong interest from established international service providers but also from a number of Moroccan banks, which underscores the potential and strategic significance of this nationally important Moroccan gas development project.<\/span><\/p>\n<p class=\"do\"><span class=\"cw\">\u00a0<\/span><\/p>\n<p class=\"do\"><span class=\"cw\">Strategically, I am pleased with the progress we are making to deliver growth on the current portfolio but also in identifying and maturing a funnel of transition energy and renewable power opportunities that all have the potential to offer attractive returns for the Company whilst playing an important role in strengthening energy security of supply and decarbonisation. I am particularly pleased that we have been able to do so within an embedded culture of capital discipline which has only been possible through the commitment, focus, abilities and energy of our team&#8221;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8211;\u00a0\u00a0\u00a0\u00a0 mLNG equipment and services provider Italfluid, has confirmed the issuance of purchase orders for the gas processing and liquefaction packages together with the LNG storage tank; &#8211;\u00a0\u00a0\u00a0\u00a0 Site preparation &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-provides-tendrara-phase-1-mlng-development-update\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":8449,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[10367,8819,10182,1629,10368,10366,7689,10365],"class_list":["post-12129","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-endrara-phase-2","tag-italfluid","tag-mlng","tag-morocco","tag-semel","tag-sidi-moktar-exploration","tag-sound-energy","tag-sound-energy-sustainables-limited","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1280%2C720&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-39D","jetpack-related-posts":[{"id":9618,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-enters-into-a-letter-of-exclusivity-extension-of-lng-heads-of-terms-in-tendrara-phase-1-development\/","url_meta":{"origin":12129,"position":0},"title":"MOROCCO: Sound Energy Enters into a Letter of Exclusivity &#038; Extension of LNG Heads of Terms in Tendrara Phase 1 Development","author":"","date":"January 3, 2021","format":false,"excerpt":"Sound Energy has provided an update in relation to the proposed micro liquefied natural gas (mLNG) phase 1 development project for the TE-5 Horst (the Phase 1 Development) at the Tendrara Production Concession.\u00a0 Letter of Exclusivity\u00a0 Sound Energy Morocco East Limited (SEMEL), the Company's wholly owned subsidiary, has entered into\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11854,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-issues-of-notice-to-proceed-for-tendrara-concession-phase-1-development\/","url_meta":{"origin":12129,"position":1},"title":"MOROCCO: Sound Energy  Issues of Notice to Proceed for Tendrara Concession Phase 1 Development","author":"","date":"February 17, 2022","format":false,"excerpt":"\u00a0 Sound Energy has announced the issue to Italfluid Geoenergy S.r.l. of notice to proceed in respect of the project contract for the Tendrara Concession mLNG Facilities Onshore, Kingdom of Morocco, between the Group and the Contractor.\u00a0 The Notice to Proceed has been issued to the Contractor by Sound Energy's\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":10644,"url":"https:\/\/www.oilnewskenya.com\/index.php\/sound-energy-enters-lng-spa-with-afriquia-gaz\/","url_meta":{"origin":12129,"position":2},"title":"Sound Energy Enters LNG SPA with Afriquia Gaz","author":"","date":"July 29, 2021","format":false,"excerpt":"Sound Energy has provided the following update in relation to the Company's micro liquified natural gas (mLNG) phase 1 development plan for the TE-5 Horst development\u00a0 at the Tendrara Production Concession.\u00a0 Highlights\u00a0 \u00b7\u00a0\u00a0\u00a0\u00a0Ten (10) year take or pay LNG sale and purchase agreement entered into with Afriquia Gaz \u00b7\u00a0\u00a0\u00a0\u00a0\u00a32 million\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11477,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-announces-phase-1-development-loan-note-financing-and-lng-sale-purchase-agreement\/","url_meta":{"origin":12129,"position":3},"title":"MOROCCO: Sound Energy Announces Phase 1 Development Loan Note Financing and LNG Sale &#038; Purchase Agreement","author":"","date":"January 1, 2022","format":false,"excerpt":"Sound Energy, the energy transition company, is delighted to announce the entry of binding conditional agreements in respect of a US$18 million Phase 1 Tendrara LNG Development loan note financing and that, with the other remaining conditions precedent to the Phase 1 LNG gas sales agreement announced by the Company\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12883,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-reports-micro-lng-development-progress-amendment-of-italfluid-project-contract\/","url_meta":{"origin":12129,"position":4},"title":"MOROCCO: Sound Energy Reports on Micro LNG Development Progress &#038; Amendment of Italfluid Project Contract","author":"","date":"November 29, 2022","format":false,"excerpt":"Sound Energy has provided a progress update on its Phase 1 micro LNG development and announced an amendment to the project contract entered into between Italfluid Geoenergy S.r.l. \u00a0and Sound Energy and\u00a0together with the Contractor in respect of the design, procurement, construction, operation and maintenance of Tendrara Concession micro LNG\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":15407,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-sound-energy-announces-first-commissioning-gas-at-the-tendrara-gas-development\/","url_meta":{"origin":12129,"position":5},"title":"MOROCCO: Sound Energy Announces First Commissioning Gas at the Tendrara Gas Development","author":"","date":"December 8, 2025","format":false,"excerpt":"Sound Energy has announced that it has received notification from the operator of the Tendrara Production Concession, Mana Energy Ltd (55%), of the commencement of the initial commissioning activities for the TE-5 Horst development project in the Tendrara Production Concession\u00a0that first gas has entered the gas gathering system (GGS) in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/06\/Morocco-Tendrara.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=12129"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12129\/revisions"}],"predecessor-version":[{"id":12130,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/12129\/revisions\/12130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/8449"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=12129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=12129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=12129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}