{"id":11827,"date":"2022-02-14T19:00:24","date_gmt":"2022-02-14T19:00:24","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11827"},"modified":"2022-02-14T19:23:50","modified_gmt":"2022-02-14T19:23:50","slug":"kibo-energy-inks-10-year-clean-energy-power-purchase-agreement-on-waste-to-energy-project","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kibo-energy-inks-10-year-clean-energy-power-purchase-agreement-on-waste-to-energy-project\/","title":{"rendered":"Kibo Energy inks 10-Year Clean Energy Power Purchase Agreement on Waste to Energy Project"},"content":{"rendered":"<p class=\"cy\">Kibo Energy has <span class=\"cs\">announced that it has entered into a 10-year take-or-pay conditional Power Purchase Agreement (`PPA&#8217;) to generate baseload electricity from a 2.7 MW plastic-to-syngas power plant. The plant will be constructed, commissioned and operated for an Industrial Business Park Developer (the &#8220;Client&#8221;) in Gauteng, South Africa (&#8220;the Project&#8221;). The Project, is the first project under Sustineri Energy, a joint venture in which Kibo Energy PLC holds 65% and the balance of 35% is held by Industrial Green Energy Solutions PTY LTD (&#8216;IGES&#8217;).<\/span><\/p>\n<p class=\"cy\"><span class=\"cs\">The Project will provide the Client with cleaner electricity, by making use of a high temperature pyrolysis process, where selected non-recyclable plastics will undergo thermal degradation to produce high quality syngas, which will in turn feed gas engines to generate both electricity and heat energy. Additionally, there is potential to sell the heat energy generated as a byproduct from the gas engines directly to customers inside the industrial park.<\/span><\/p>\n<p class=\"cz\"><span class=\"cs\">Project Highlights<\/span><span class=\"cs\">\u00a0<\/span><\/p>\n<p class=\"da\"><span class=\"cm\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"cl\">Compelling financials:\u00a0<\/span><span class=\"ck\">based on the optimised financial model, an EBITDA of c.\u00a0ZAR 388 \u00a0million\u00a0over the life of project is expected, for an installed capacity of 2.7 MW, of which an amount of c.ZAR 252 million\u00a0is attributable to the Company. There is potential to expand the project to c. 8 MW installed capacity in the future.<\/span><\/p>\n<p class=\"db\"><span class=\"cm\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"cl\">Internal Rate of Return: <\/span><span class=\"cl\">an IRR<\/span><span class=\"ci\">\u00a0<\/span><span class=\"cl\">between 11% &#8211; 14% p\/a is projected on the initial installed capacity of 2.7 MW.<\/span><\/p>\n<p class=\"dc\"><span class=\"ch\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ck\">Reducing plastic pollution to produce sustainable energy:<\/span><span class=\"cl\">\u00a0by using selected and<\/span><span class=\"cg\">\u00a0specific high calorific plastic as fuel feedstock, which can under prevailing legislation no longer be dumped at landfill sites, the Project will play an important role and make a significant contribution towards the advancement of clean energy g<span class=\"cs\">eneration.<\/span><\/span><\/p>\n<p class=\"dc\"><span class=\"ch\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ck\">Addressing the energy supply issues:<\/span><span class=\"ck\">\u00a0the Project will assist in alleviating the energy supply crisis faced in\u00a0South Africa\u00a0by providing alternative base load supply.<\/span><\/p>\n<p class=\"dc\"><span class=\"ch\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ck\">Partnerships with industry leaders:<\/span><span class=\"ck\"> Lesedi<\/span><span class=\"ck\">, a leading EPC and Engineering company, has been appointed as the Engineering, Procurement and Construction (EPC) and Operations and Management (O&amp;M) contractors.<\/span><\/p>\n<p class=\"dc\"><span class=\"ch\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ck\">2022 development timelines:<\/span><span class=\"ck\">\u00a0the CAPEX requirement for the Project is expected to be c.\u00a0ZAR 180 million\u00a0with Financial Close expected during Q3 2022.<\/span><\/p>\n<p class=\"dd\"><span class=\"ch\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ck\">Construction and Commissioning:<\/span><span class=\"ck\">\u00a0the Construction Phase is scheduled to commence during Q4 2022 with project commissioning 11 to 14 months thereafter.<\/span><\/p>\n<p class=\"de\"><span class=\"cd\"><span class=\"cs\">NOTE:<\/span><\/span><span class=\"cs\">\u00a0<span class=\"cd\">All the financial numbers stated above remain subject to change until such time as actual production figures are available, following a suitable period of steady state operation.<\/span><\/span><span class=\"cs\">\u00a0<\/span><\/p>\n<p class=\"cw\"><span class=\"cs\">Louis Coetzee, Chief Executive Officer of Kibo, commented<\/span><span class=\"cs\">: &#8220;Following the Company&#8217;s disinvestment from coal, we are excited to have signed our first waste to energy PPA that aligns to our strategy on advancing clean energy in the African market.\u00a0The Project is a first in a pipeline of projects under the Company&#8217;s waste-to-energy portfolio, which we are proud to have worked on together with our partners, IGES.<\/span><span class=\"cs\">\u00a0<\/span><\/p>\n<p class=\"df\"><span class=\"cs\">In the process of getting the PPA ready for signature, the Company has also been doing a large amount of work on procuring funding for the Project and\u00a0 has received a higher than expected level of interest from various institutions, for the provision of project and debt funding at very competitive commercial terms. With the signed PPA now in hand, the Company finds itself in a very good position to advance these discussions with a view on finalising appropriate funding arrangements for the Project in an expeditious manner.&#8221;<\/span><span class=\"cs\">\u00a0<\/span><\/p>\n<p class=\"cw\"><span class=\"cs\">This PPA will guarantee revenue generation over the next 10 years, with the potential to realise significant additional revenue from the sale of heat and other by-products as well, and with the potential to expand up to a facilty of 8 MW after 24 to 26 months.<\/span><span class=\"cs\">&#8220;<\/span><\/p>\n<p class=\"cw\">\n","protected":false},"excerpt":{"rendered":"<p>Kibo Energy has announced that it has entered into a 10-year take-or-pay conditional Power Purchase Agreement (`PPA&#8217;) to generate baseload electricity from a 2.7 MW plastic-to-syngas power plant. The plant &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kibo-energy-inks-10-year-clean-energy-power-purchase-agreement-on-waste-to-energy-project\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":11828,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[480,742,764,4954,10167,9123],"class_list":["post-11827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-coal","tag-energy","tag-engineering","tag-epc","tag-kibo","tag-lesedi","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Kibo-Energy.png?fit=650%2C364&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-34L","jetpack-related-posts":[{"id":12256,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kibo-signs-strategic-five-year-framework-agreement-to-deploy-at-least-1-gigawatt-of-long-duration-energy-storage-in-southern-africa\/","url_meta":{"origin":11827,"position":0},"title":"Kibo Signs Strategic Five-Year Framework Agreement to deploy at least 1 Gigawatt of Long Duration Energy Storage in Southern Africa","author":"","date":"May 17, 2022","format":false,"excerpt":"Kibo Energy has announced that it has signed a rolling 5-year Framework Agreement\u00a0 with Enerox GmbH (CellCube), to develop and deploy CellCube based Long Duration Energy Storage (LDES) solutions in selected target sectors in Southern Africa. Under the Agreement Kibo has been granted conditional exclusive rights, subject to successful Proof\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Kibo-Energy.png?fit=650%2C364&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Kibo-Energy.png?fit=650%2C364&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Kibo-Energy.png?fit=650%2C364&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11203,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mozambique-gl-africa-energy-finalizes-concession-agreement-of-250mw-lng-plant\/","url_meta":{"origin":11827,"position":1},"title":"MOZAMBIQUE: GL Africa Energy Finalizes Concession Agreement of 250MW LNG Plant","author":"","date":"November 22, 2021","format":false,"excerpt":"GL Africa Energy Mozambique and the Ministry of mineral resources and energy have signed a concession agreement for the finance and operationalization of the 250MW lng plant in Nacala district, Nampula province in northern Mozambique. The agreement signed by minister Ernesto Max Elias Tonelo and GL Energy director Michael Kearns\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Concessions-agreement-with-government-of-Mozambique.jpg?fit=624%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Concessions-agreement-with-government-of-Mozambique.jpg?fit=624%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/Concessions-agreement-with-government-of-Mozambique.jpg?fit=624%2C400&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5366,"url":"https:\/\/www.oilnewskenya.com\/index.php\/scatec-solar-norfund-sign-power-purchase-agreement-for-mozambiques-first-large-scale-solar-plant\/","url_meta":{"origin":11827,"position":2},"title":"Scatec Solar, Norfund sign Power Purchase Agreement for Mozambique&#8217;s first large scale Solar Plant","author":"","date":"November 1, 2016","format":false,"excerpt":"Scatec Solar \u00a0and Norfund \u00a0have signed the Power Purchase Agreement securing\u00a0 the sale of solar power over a 25 year period to the state owned utility Electricidade de Mozambique (EDM). The agreement was signed at a ceremony in Maputo yesterday in the presence of the Norwegian Minister of Foreign Affairs,\u2026","rel":"","context":"In &quot;Renewables 2&quot;","block_context":{"text":"Renewables 2","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/Scatec-solar-2.png?fit=600%2C311&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/Scatec-solar-2.png?fit=600%2C311&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/Scatec-solar-2.png?fit=600%2C311&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5188,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ustda-launches-its-largest-single-investment-in-kenyas-energy-sector\/","url_meta":{"origin":11827,"position":3},"title":"USTDA Launches its Largest Single Investment in Kenya\u2019s Energy Sector","author":"","date":"September 21, 2016","format":false,"excerpt":"Today, during the U.S.-Africa Business Forum, the U.S. Trade and Development Agency launched its largest single investment in Kenya\u2019s power sector to date\u00a0 at a ceremony witnessed by the Deputy President of the Republic of Kenya, the Honorable William Ruto, and Power Africa Coordinator Andrew Herscowitz, USTDA Director Leocadia I.\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/USTDA.jpg?fit=960%2C640&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/USTDA.jpg?fit=960%2C640&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/USTDA.jpg?fit=960%2C640&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/USTDA.jpg?fit=960%2C640&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10020,"url":"https:\/\/www.oilnewskenya.com\/index.php\/south-africa-engie-acquires-100-mw-concentrated-solar-power-plant\/","url_meta":{"origin":11827,"position":4},"title":"SOUTH AFRICA: ENGIE acquires 100 MW Concentrated Solar Power plant","author":"","date":"March 2, 2021","format":false,"excerpt":"ENGIE has announced that it has reached an agreement to acquire from Abengoa a 40% equity stake in Xina Solar One, a 100 MW Concentrated Solar plant, as well as 46% of the Operations & Maintenance Company. The plant is equipped with parabolic trough technology and a molten salt storage\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Solar-PV.jpg?fit=929%2C616&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Solar-PV.jpg?fit=929%2C616&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Solar-PV.jpg?fit=929%2C616&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Solar-PV.jpg?fit=929%2C616&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11398,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cameroon-chad-lesotho-scatec-enters-into-multipledeals-to-deliver-hybrid-solar-storage-plants-in-africa\/","url_meta":{"origin":11827,"position":5},"title":"CAMEROON\/CHAD\/LESOTHO: Scatec Enters into Multiple Deals to Deliver Hybrid Solar &#038; Storage Plants in Africa","author":"","date":"December 16, 2021","format":false,"excerpt":"CAMEROON Release by Scatec has entered into a lease agreement with electricity company ENEO in Cameroon to deliver two hybrid solar and storage plants totalling 36 MW solar and 20 MW\/19 MWh storage. The plants will supply low cost, clean and reliable electricity in Maroua and Guider in the Grand-North\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Solar-Energy-2.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Solar-Energy-2.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Solar-Energy-2.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Solar-Energy-2.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Solar-Energy-2.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11827"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11827\/revisions"}],"predecessor-version":[{"id":11833,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11827\/revisions\/11833"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/11828"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}