{"id":11748,"date":"2022-02-02T21:26:34","date_gmt":"2022-02-02T21:26:34","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11748"},"modified":"2022-02-02T21:26:34","modified_gmt":"2022-02-02T21:26:34","slug":"tanzania-acquisition-of-3d-seismic-survey-over-ruvuma-psa-will-commence-in-2-weeks","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-acquisition-of-3d-seismic-survey-over-ruvuma-psa-will-commence-in-2-weeks\/","title":{"rendered":"TANZANIA: Acquisition of 3D Seismic Survey over Ruvuma PSA will Commence in 2 Weeks"},"content":{"rendered":"<p>Ruvuma PSA JV partner Aminex has provided an update to its planned 338km2 3D seismic survey\u00a0 over the Ruvuma PSA<\/p>\n<p>\u2022 Seismic camp fully constructed, and the contractor Africa Geophysical Services Limited (AGS) is completing the mobilization of all necessary equipment to site, which is expected to be completed by mid-February;<br \/>\n\u2022 Acquisition of the 338km2 3D seismic survey will commence upon full equipment mobilization;<br \/>\n\u2022 The 3D seismic survey is an integral step in progressing and de-risking the Ntorya gas discovery ahead of the drilling of the Chikumbi-1 (CH-1) well;<br \/>\n\u2022 The seismic acquisition and subsequent interpretation will seek to refine and confirm the exploitable gas resources of the Ntorya field. Additionally, the survey will provide greater clarity of the potential upside of the discovery as identified by the operator APT, through a reinterpretation of the existing 2D seismic dataset. APT&#8217;s revised mapping and internal management estimates suggest a risked prospective gas in place for the Ntorya accumulation of 3,024 Bcf (gross basis, mean case), in multiple lobes to be tested, and a prospective, risked recoverable gas resource of 1,990 Bcf (gross basis, mean case); and<br \/>\n\u2022 APT continue to progress with well planning for the CH-1 well with key contracting now being undertaken. The operator continues to target a Q3 2022 spud.<\/p>\n<p>Charlie Santos, Executive Chairman of Aminex commented:<br \/>\n<em>\u201cProgress is being made on the seismic programme. Following the award of the seismic contract in Q4 2021 and the ongoing mobilization of the equipment to site, the Joint Venture expects to commence shooting seismic imminently. This will provide the high-quality 3D definition of the subsurface in preparation for the appraisal well to be drilled in Q3 this year. As we enter another important phase of the activity, we thank APT for the progress made and look forward to updating shareholders further in due course.\u201d<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ruvuma PSA JV partner Aminex has provided an update to its planned 338km2 3D seismic survey\u00a0 over the Ruvuma PSA \u2022 Seismic camp fully constructed, and the contractor Africa Geophysical &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-acquisition-of-3d-seismic-survey-over-ruvuma-psa-will-commence-in-2-weeks\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":7118,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[10114,137,6954,6956,6284,2211,2466],"class_list":["post-11748","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-africa-geophysical-services-limited","tag-aminex","tag-ara-petroleum","tag-chikumbi","tag-ntorya-field","tag-ruvuma-psa","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-33u","jetpack-related-posts":[{"id":11288,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ara-commences-1st-phase-of-the-ruvuma-psa-3d-seismic-project\/","url_meta":{"origin":11748,"position":0},"title":"TANZANIA: ARA Commences 1st Phase of the Ruvuma PSA 3D seismic project","author":"","date":"December 3, 2021","format":false,"excerpt":"ARA Petroleum Tanzania Limited (APT) has confirmed that the seismic contractor commenced preparatory works as planned on 15 November 2021, has now established the GPS control points and survey equipment is being calibrated for ground staking. The Joint Venture expects line clearing and mobilisation of the camp to commence next\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":10915,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-africa-geophysical-services-lands-ntorya-seismic-acquisition-contract\/","url_meta":{"origin":11748,"position":1},"title":"TANZANIA: Africa Geophysical Services Lands Ntorya Seismic Acquisition Contract","author":"","date":"September 27, 2021","format":false,"excerpt":"Aminex has announced that the Ruvuma joint venture has awarded the seismic acquisition contract to Africa Geophysical Services Limited. The award follows an extensive tendering exercise conducted by ARA Petroleum Tanzania Limited for the seismic programme during which the joint venture has been able to take advantage of favourable market\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license-2.png?fit=394%2C533&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10776,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-apt-receives-2-years-extension-of-ruvuma-licence\/","url_meta":{"origin":11748,"position":2},"title":"TANZANIA: APT Receives 2 Years Extension of Ruvuma Licence","author":"","date":"August 19, 2021","format":false,"excerpt":"The operator, ARA Petroleum Tanzania Limited (APT) has secured the extension for the Ruvuma PSA from the Ministry of Energy of Tanzania, which is valid for two years from 15 August 2021, and allows for the completion of the following: \u2022 Acquisition of 200 square kilometres (surface coverage) of 3D\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12616,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-half-of-seismic-data-now-acquired-over-the-ntorya-location\/","url_meta":{"origin":11748,"position":3},"title":"TANZANIA:  Half of Seismic Data Now Acquired over the Ntorya location, Ruvuma PSA","author":"","date":"September 5, 2022","format":false,"excerpt":"Aminex is pleased to announce that seismic and commercial activities on the Ruvuma PSC continue to progress under the direction of the operator, ARA Petroleum Tanzania Limited (APT): \u2022 Over half of the seismic data has now been acquired over the Ntorya location. \u2022 The seismic data required to evaluate\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/09\/Ntorya-development-license.png?fit=532%2C443&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":7299,"url":"https:\/\/www.oilnewskenya.com\/index.php\/sakson-awarded-contract-drill-chikumbi-1-well-tanzanias-ruvuma-psa\/","url_meta":{"origin":11748,"position":4},"title":"Sakson Awarded Contract to Drill the Chikumbi-1 Well in Tanzania\u2019s Ruvuma PSA","author":"","date":"December 17, 2018","format":false,"excerpt":"Aminex has advanced drilling and seismic programmes over the Ruvuma PSA acreage while it progresses satisfaction of conditions required to close out a farm-out agreement signed with the Zubair Group in early July 2018 according to its latest update. The Company has finalised the Chikumbi-1 executive drilling and completions programmes,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9302,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-aminex-ara-petroleum-complete-ruvuma-farm-out\/","url_meta":{"origin":11748,"position":5},"title":"TANZANIA: Aminex, ARA Petroleum Complete Ruvuma Farm-out","author":"","date":"October 23, 2020","format":false,"excerpt":"Aminex has announced the Completion of the Ruvuma Farm-Out. The Company, through its wholly owned subsidiary, Ndovu Resources Limited, has transferred a 50% interest in, and operatorship of, the Ruvuma PSA to ARA Petroleum Tanzania Limited (APT). Aminex had earlier has borrowed US$3 million (advance) and received a loan of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/07\/Ruvuma-PSA.jpg?fit=535%2C694&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11748"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11748\/revisions"}],"predecessor-version":[{"id":11749,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11748\/revisions\/11749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/7118"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}