{"id":11597,"date":"2022-01-13T11:31:11","date_gmt":"2022-01-13T11:31:11","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11597"},"modified":"2022-01-13T11:34:07","modified_gmt":"2022-01-13T11:34:07","slug":"egypt-kuwait-energy-commences-production-at-the-al-jahraa-13-well","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-at-the-al-jahraa-13-well\/","title":{"rendered":"EGYPT: Kuwait Energy Commences Production at the Al Jahraa-13 well"},"content":{"rendered":"<p class=\"de\"><strong><span class=\"df\">Highlights<\/span><\/strong><\/p>\n<p class=\"dg\"><span class=\"dh\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"di\">Well tested with flow rates of:<\/span><\/p>\n<p class=\"dj\"><span class=\"dk\">&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"di\">897 bopd and 0.95 mmscf\/d gas (c. 1,087 boepd gross; 239 boepd net) on a 64\/64&#8243; choke<\/span><\/p>\n<p class=\"dj\"><span class=\"dk\">&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"di\">623 bopd and 0.47 mmscf\/d gas (c. 717 boepd gross; 158 boepd net) on a 32\/64&#8243; choke<\/span><span class=\"dm\">\u00a0<\/span><\/p>\n<p class=\"dn\"><span class=\"do\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"di\">The well has now been tied into the existing facilities and brought on stream at an initial rate of c. 600 bopd gross on a 48\/64&#8243; choke. This is less than eight days from completion, rapidly adding additional production and revenue to the Company<\/span><span class=\"dd\">\u00a0<\/span><\/p>\n<p class=\"dn\"><span class=\"dq\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"di\">The ECDC-6 rig will now move to drill the ASD-2 development well, the first well in the 2022 campaign<\/span><span class=\"dr\">\u00a0<\/span><\/p>\n<p class=\"dc\"><span class=\"dd\">As previously announced, the AJ-13 well, which is a follow up to the successful Al Jahraa-8 well, safely reached a TD of 3,840m, several days ahead of schedule and under-budget. The well has been logged and interpreted to have encountered 17.5m of net oil pay across the Upper and Lower Bahariya reservoir targets, in line with the range of pre-drill expectations.<\/span><span class=\"dd\">\u00a0<\/span><\/p>\n<p class=\"dc\"><span class=\"dd\">The AJ-13 well is the fifth and final well in the Abu Sennan 2021 drilling programme. The ECDC-6 rig, used to drill the AJ-13 well, will now move to commence the 2022 drilling programme, starting with the ASD-2 development well. The ASD-2 well follows on from the exploration success that was made in 2021 with the ASD-1X well. It will target the Abu Roash reservoirs in a more northerly part of the same structure, aiming to access the upside reserves and accelerate production from this field. \u00a0<\/span><span class=\"dd\">\u00a0<\/span><\/p>\n<p class=\"dc\"><span class=\"dd\">The Abu Sennan licence is operated by Kuwait Energy Egypt (25%), with Global Connect Ltd (25%) and Dover Investments (28%) United Oil and Gas (22%) the other partners in the Joint Venture.\u00a0<\/span><\/p>\n<p class=\"de\"><span class=\"dt\">United&#8217;s Chief Executive Officer,\u00a0Brian Larkin\u00a0commented:<\/span><\/p>\n<p class=\"de\"><span class=\"du\">&#8220;AJ-13 has been brought on stream in less than eight days from completion using the existing facilities and generating production and revenue for the Company. With initial gross production rates of 600 bopd we expect the well to pay back in under nine months, similar to previous wells.<\/span><\/p>\n<p class=\"de\"><span class=\"du\">&#8220;Following the exceptional drilling success achieved in 2021 we look forward to beginning our 2022 development and exploration drilling programme. The ECDC-6 rig will now move to drill the ASD-2 development well, the first well in our 2022 drilling programme, which is due to spud in the coming weeks.&#8221;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highlights \u00b7\u00a0\u00a0\u00a0\u00a0Well tested with flow rates of: &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0897 bopd and 0.95 mmscf\/d gas (c. 1,087 boepd gross; 239 boepd net) on a 64\/64&#8243; choke &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0623 bopd and 0.47 mmscf\/d gas &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-at-the-al-jahraa-13-well\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":11598,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[8712,10023,10025,9692,709,10024,8878],"class_list":["post-11597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-abu-sennan-licence","tag-al-jahraa-13-well","tag-dover-investments","tag-ecdc-6-rig","tag-egypt","tag-global-connect","tag-united-oil-and-gas","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/01\/Egypt-Abu-Sennan-1.png?fit=874%2C581&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-313","jetpack-related-posts":[{"id":10284,"url":"https:\/\/www.oilnewskenya.com\/index.php\/united-oil-and-gas-asd-1x-well-test-update-submission-of-notice-of-commercial-discovery\/","url_meta":{"origin":11597,"position":0},"title":"United Oil and Gas ASD-1X Well Test Update &#038; Submission of Notice of Commercial Discovery","author":"","date":"May 5, 2021","format":false,"excerpt":"United Oil & Gas has provide the following update on the testing of the ASD-1X exploration well in the Abu Sennan concession, onshore Egypt and the spudding of the AJ-8 development well. United holds a 22% non-operating interest in Abu Sennan, which is operated by Kuwait Energy Egypt (\"KEE\").\u00a0 Highlights\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10663,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-united-oil-and-gas-announces-successful-testing-of-al-jahraa-8-development-well\/","url_meta":{"origin":11597,"position":1},"title":"EGYPT: United Oil and Gas Announces Successful Testing of Al Jahraa-8 Development Well","author":"","date":"August 2, 2021","format":false,"excerpt":"United Oil & Gas has provided the following update on the testing of the Al Jahraa-8 (\"AJ-8\") development well in the Abu Sennan concession, onshore Egypt (the \"Licence\"). United holds a 22% working interest in the Licence, which is operated by Kuwait Energy Egypt.\u00a0 Highlights from AJ-8 Well-testing: \u00b7\u00a0\u00a0\u00a0\u00a0Preliminary short-term\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9967,"url":"https:\/\/www.oilnewskenya.com\/index.php\/united-oil-and-gas-provides-ash-3-well-test-update\/","url_meta":{"origin":11597,"position":2},"title":"EGYPT: United Oil and Gas Provides ASH-3 Well Test Update","author":"","date":"February 23, 2021","format":false,"excerpt":"United Oil & Gas has provided the following update on the testing of the ASH-3 development well in the Abu Sennan concession, onshore Egypt. United holds a 22% non-operating interest in Abu Sennan, which is operated by Kuwait Energy Egypt.\u00a0 Highlights \u00b7\u00a0\u00a0\u00a0\u00a0Preliminary results from the ASH-3 well-test indicate a maximum\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Egypt-Abu-Sennan.jpg?fit=750%2C406&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12098,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-from-the-asd-2-well\/","url_meta":{"origin":11597,"position":3},"title":"EGYPT: Kuwait Energy Commences Production from the ASD-2 well","author":"","date":"March 28, 2022","format":false,"excerpt":"United Oil & Gas PLC has announced an update on the ASD-2 development well in the Abu Sennan licence, onshore Egypt. United holds a 22% working interest in the licence, which is operated by Kuwait Energy Egypt.\u00a0 Highlights \u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0The ASD-2 well has commenced production at an initial rate of c.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-Abu-Sennan-2.png?fit=591%2C472&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-Abu-Sennan-2.png?fit=591%2C472&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-Abu-Sennan-2.png?fit=591%2C472&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12820,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-ash-4-well-to-be-tied-into-the-existing-facilities-in-the-abu-sennan-licence\/","url_meta":{"origin":11597,"position":4},"title":"EGYPT: ASH-4 Well to be Tied into the Existing Facilities in the Abu Sennan licence","author":"","date":"November 16, 2022","format":false,"excerpt":"-\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Preliminary test results from the ASH-4 well-test indicate a flow-rate of 2,101 bopd and 3 mmscf\/d (c. 2,700 boepd gross; 594 boepd net) from the Alam El Bueib (AEB) reservoir on a maximum 40\/64\" choke -\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0On a reduced, 32\/64\" choke, which is expected to be more representative of the producing\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/Egypt-Abu-Sennan.png?fit=874%2C581&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13472,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-kuwait-energy-commences-production-from-the-ash-8-well\/","url_meta":{"origin":11597,"position":5},"title":"EGYPT: Kuwait Energy Commences Production from the ASH-8 well","author":"","date":"March 22, 2023","format":false,"excerpt":"United Oil & Gas has announced an update on the ASH-8 development well (ASH-8) in the Abu Sennan licence, onshore\u00a0Egypt. United holds a 22% working interest in the licence, which is operated by Kuwait Energy Egypt. Summary -\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0ASH-8 well commenced production on 16 March at an initial stabilised rate of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Egypt-ASH-8.jpg?fit=750%2C537&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Egypt-ASH-8.jpg?fit=750%2C537&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Egypt-ASH-8.jpg?fit=750%2C537&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Egypt-ASH-8.jpg?fit=750%2C537&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11597"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11597\/revisions"}],"predecessor-version":[{"id":11600,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11597\/revisions\/11600"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/11598"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}