{"id":11536,"date":"2022-01-07T05:51:37","date_gmt":"2022-01-07T05:51:37","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11536"},"modified":"2022-01-07T05:51:37","modified_gmt":"2022-01-07T05:51:37","slug":"kenya-new-kipevu-oil-terminal-to-open-in-april","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-new-kipevu-oil-terminal-to-open-in-april\/","title":{"rendered":"KENYA: New Kipevu Oil Terminal to Open in April"},"content":{"rendered":"<p>President Uhuru Kenyatta on Thursday inspected the ongoing construction of the Shs 40 billion offshore Kipevu Oil Terminal, the largest of its kind in Africa.<\/p>\n<p>The construction of the 770-metre long jetty, currently at 96% complete, is wholly funded by the Kenya Ports Authority (KPA) and implemented by China Communications Construction Company.<\/p>\n<p>When complete in April this year, the offshore facility will be able to load and offload very large sea tankers of up to 200,000 DWT carrying all categories of petroleum products including crude oil, white oils and LPG.<\/p>\n<p>Speaking during the inspection, President Kenyatta, who was accompanied by visiting Chinese Foreign Affairs Minister Mr Wang Yi, said the new jetty will enhance supply and ensure price stability of petroleum products in Kenya and the region by replacing the 50-year old onshore Kipevu Oil Terminal (KOT).<\/p>\n<p>When operational, President Kenyatta noted that the new offshore jetty will save the country in excess of Shs 2 billion annually in demurrage costs incurred by oil shippers thereby contributing to a significant reduction in fuel pump prices.<\/p>\n<p>\u201cOnce complete the new facility will be able to reduce not only the cost of fuel but also to ensure that Kenya is able to consistently have an adequate supply of fuel for our needs and development needs that of our people.<\/p>\n<p>\u201cThis terminal once commissioned in a few weeks time will result in the saving of almost Shs 2 billion that we are currently paying every year because of demurrage occasioned by the long queues of vessels parked outside our harbour waiting to discharge their product,\u201d he said.<\/p>\n<p>The President hailed Kenya&#8217;s development partnership with China saying the arrangement had helped deliver key infrastructure projects, adding that the populous Asian nation was progressively opening up its expansive domestic market to Kenyan exports.<\/p>\n<p>\u201cOur partnership with China is not a partnership based on China telling us what to do. It is a partnership of friends, working together to meet Kenya\u2019s socio-economic agenda.<\/p>\n<p>\u201cThe old Kipevu Oil Terminal which for many years we have struggled with, was not able to meet the demands of increasing population, to meet the demands of the growing economy.<\/p>\n<p>&#8220;We needed this facility to be able to cater for those demands and China was there when we asked for partnership in developing it,&#8221; the President said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>President Uhuru Kenyatta on Thursday inspected the ongoing construction of the Shs 40 billion offshore Kipevu Oil Terminal, the largest of its kind in Africa. The construction of the 770-metre &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kenya-new-kipevu-oil-terminal-to-open-in-april\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":11537,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[9987,538,9985,1277,1332,1458,9986],"class_list":["post-11536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-china-communications-construction-company","tag-crude-oil","tag-jetty","tag-kenya-ports-authority","tag-kipevu-oil-terminal","tag-lpg","tag-white-oils","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/01\/kipevu-oil-terminal-scaled.jpg?fit=2560%2C1600&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-304","jetpack-related-posts":[{"id":850,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-to-use-kshs-10-3-billion-to-relocate-kipevu-oil-terminal\/","url_meta":{"origin":11536,"position":0},"title":"Kenya to use Kshs. 10.3 billion to relocate Kipevu Oil terminal","author":"Samuel Kamau Mbote","date":"April 7, 2014","format":false,"excerpt":"Kenya government has began relocating Kipevu Oil terminal as it tries to increase capacity and reduce the frequent oil shortages. According to the Kenya Ports Authority chairman Danson Mungatana the $120 million facility will take five years to be completed and will serve to reduce fuel prices as the country\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/kpc.jpg?fit=595%2C300&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/kpc.jpg?fit=595%2C300&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/kpc.jpg?fit=595%2C300&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4750,"url":"https:\/\/www.oilnewskenya.com\/index.php\/amec-foster-wheeler-wins-field-development-project-contract-in-mozambique\/","url_meta":{"origin":11536,"position":1},"title":"Amec Foster Wheeler wins Field Development Project contract in Mozambique","author":"","date":"June 14, 2016","format":false,"excerpt":"Amec Foster Wheeler has announced the award of a detailed design and engineering contract by Sasol Petroleum Mozambique Limitada for Phase 1 Tranche 1 of the PSA development for surface facilities, located at Temane, 600km north of Maputo in Mozambique. The scope of work and contract is for a new\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/AMECFW.jpg?fit=1170%2C600&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/AMECFW.jpg?fit=1170%2C600&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/AMECFW.jpg?fit=1170%2C600&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/AMECFW.jpg?fit=1170%2C600&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/AMECFW.jpg?fit=1170%2C600&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":762,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenyan-government-plans-to-increase-petroleum-products-storage-capacity\/","url_meta":{"origin":11536,"position":2},"title":"Kenyan government plans to increase petroleum products storage capacity","author":"Samuel Kamau Mbote","date":"March 21, 2014","format":false,"excerpt":"Kenya hopes to increase its storage capacity of petroleum products by 22 percent in the next 3 years in anticipation of increasing demand and increased product from a new pipeline from Mombasa expected to be complete by 2016. The four tanks to be constructed by the Kenya Petroleum company (KPC)\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/terminals_vttikenya_image_2.jpg?fit=380%2C260&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4763,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-cautiously-optimistic-of-commencing-oil-exports-in-2017\/","url_meta":{"origin":11536,"position":3},"title":"Kenya Government \u2018Cautiously Optimistic\u2019 Of Commencing Oil Exports in 2017","author":"","date":"June 17, 2016","format":false,"excerpt":"The Government of Kenya \u00a0has said it remains cautiously optimistic of exporting crude oil from the lokichar basin by June 2017 having overcome the various challenges that remain including requisite infrastructure, storage and a new jetty according to chair Presidential Delivery unit head and deputy chief of staff in the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"_DSC0054","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054-300x199.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":287,"url":"https:\/\/www.oilnewskenya.com\/index.php\/287\/","url_meta":{"origin":11536,"position":4},"title":"Kenya seeks over 470,000 T oil products for January-February 2013","author":"Samuel Kamau Mbote","date":"December 17, 2013","format":false,"excerpt":"Kenya's oil importers are seeking over 470,000 tonnes of oil products for delivery over January to February, slightly lower than its previous purchases for November to January, industry sources said on Monday.","rel":"","context":"In &quot;New Discoveries&quot;","block_context":{"text":"New Discoveries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/new-discoveries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/gasfield.jpg?fit=400%2C267&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6839,"url":"https:\/\/www.oilnewskenya.com\/index.php\/technical-attributes-east-africa-crude-oil-pipeline-tanzania-segment\/","url_meta":{"origin":11536,"position":5},"title":"Technical Attributes Of East Africa Crude Oil Pipeline (Tanzania Segment)","author":"","date":"February 14, 2018","format":false,"excerpt":"Tanzania Pipeline Segment \u2013 Uganda Border to Chongoleani peninsula in Tanzania Marine Storage Terminal - 1155 KM of 24\u201d pipe = 96,250 joints : 177,627 Tons - Divided into two Lots: Lot 2 = 614 km Lot 3 = 533 km - 60 main line block valves for sectional isolation\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11536"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11536\/revisions"}],"predecessor-version":[{"id":11538,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11536\/revisions\/11538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/11537"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}