{"id":11533,"date":"2022-01-06T12:30:19","date_gmt":"2022-01-06T12:30:19","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11533"},"modified":"2022-01-06T12:30:19","modified_gmt":"2022-01-06T12:30:19","slug":"egypt-sdx-energy-commencement-of-oil-production-at-msd-21-well-west-gharib-concession","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-commencement-of-oil-production-at-msd-21-well-west-gharib-concession\/","title":{"rendered":"EGYPT: SDX Energy Commencement of Oil Production At Msd-21 Well, West Gharib Concession"},"content":{"rendered":"<p class=\"dd\"><span class=\"de\">SDX Energy has announced the commencement of oil production at the MSD-21 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-21, which encountered the primary top Asl Formation reservoir at 4,040ft MD (3,251ft TVDSS) and reached 4,740ft TD, after drilling through 62.3ft of good-quality, net oil pay sandstone with an average porosity of 21.3%. The well has now been successfully perforated, tied in to the existing facilities, and flow tested. It is expected that post-cleanup, the well will achieve a stabilized gross production rate of c.300bbl\/d which is in line with pre-drill estimates.<\/span><span class=\"de\">\u00a0<\/span><\/p>\n<p class=\"dd\"><span class=\"de\">MSD-21 is the first well in a fully-funded, 12-well development campaign at the Meseda and Rabul oil fields in the West Gharib concession, Egyptian Eastern Desert. The development drilling campaign is aiming to grow gross production from current rates of c.2,100bbl\/d to c.3,500 &#8211; 4,000bbl\/d by early 2023.<\/span><span class=\"de\">\u00a0<\/span><\/p>\n<p class=\"dd\"><span class=\"de\">The rig is now in the process of moving to the next well in the campaign, MSD-25, which is expected to spud by mid-January.<\/span><span class=\"df\">\u00a0<\/span><\/p>\n<p class=\"dg\"><span class=\"cp\">Mark Reid, CEO of SDX, commented:<\/span><span class=\"cp\">\u00a0<\/span><\/p>\n<p class=\"dh\"><span class=\"cp\">&#8220;We are pleased to get MSD-21 successfully perforated and connected to our infrastructure. The well is now producing and, when it has fully cleaned-up, we expect it to contribute c.300bbl\/d of gross oil production. This campaign provides a low-cost, highly beneficial exposure to the oil price and with a netback of\u00a0US$35\/bbl at\u00a0US$68\/bbl Brent in the first nine months of 2021, West Gharib is a very high margin asset in our portfolio. MSD-21 and subsequent wells are expected to significantly boost the production and cashflow from these fields in the coming months and I look forward to updating the market further as the campaign progresses.&#8221;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SDX Energy has announced the commencement of oil production at the MSD-21 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-21, which encountered the primary &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-commencement-of-oil-production-at-msd-21-well-west-gharib-concession\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":10686,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[7710,709,7627,9983,7628,7820,9984],"class_list":["post-11533","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-eastern-desert","tag-egypt","tag-meseda","tag-msd-21-well","tag-rabul","tag-sdx-energy","tag-west-gharib-concession","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-Eastern-Desert.jpg?fit=470%2C616&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-301","jetpack-related-posts":[{"id":12050,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-achieves-first-oil-at-msd-25-well-west-gharib-concession\/","url_meta":{"origin":11533,"position":0},"title":"EGYPT: SDX Energy Achieves First Oil At Msd-25 Well, West Gharib Concession","author":"","date":"March 17, 2022","format":false,"excerpt":"SDX Energy has announced the commencement of oil production at the MSD-25 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-25, which encountered the primary top Asl Formation reservoir at 4,109ft MD (3,361ft TVDSS) and reached 4,385ft TD on 22 February 2022, after drilling through\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12389,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-msd-23-infill-development-well-commences-production-from-msd-24\/","url_meta":{"origin":11533,"position":1},"title":"EGYPT: SDX Energy Spuds MSD-23 infill development well, Commences Production from MSD-24","author":"","date":"June 29, 2022","format":false,"excerpt":"SDX Energy has announced the spudding of the MSD-23 infill development well on 24 June 2022 at the Meseda Field, West Gharib concession, Egypt. MSD-23 is targeting the primary Asl Formation reservoir at around 4,000 feet MD (3,200ft TVDSS). MSD-23 is the fifth well in a fully funded, 13-well development\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11920,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-completion-of-drilling-at-msd-25-well-west-gharib-oil-concession\/","url_meta":{"origin":11533,"position":2},"title":"EGYPT: SDX Energy Completion Of Drilling At Msd-25 Well, West Gharib Oil Concession","author":"","date":"February 28, 2022","format":false,"excerpt":"SDX Energy has announced the completion of drilling at the MSD-25 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-25 encountered the primary top Asl Formation reservoir at 4,109ft MD (3,361ft TVDSS) and reached a TD of 4,385ft MD. The well encountered 84.8ft of good-quality,\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-Eastern-Desert.jpg?fit=470%2C616&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":11007,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-msd-21-well-at-west-gharib-concession\/","url_meta":{"origin":11533,"position":3},"title":"EGYPT: SDX Energy Spuds MSD-21 Well at West Gharib Concession","author":"","date":"October 18, 2021","format":false,"excerpt":"SDX Energy has announced the spudding of the MSD-21 infill development well on the Meseda field. This well is the first, in a fully funded, 12 well development campaign on the Meseda and Rabul oil fields in the West Gharib concession, Egyptian Eastern Desert. The development drilling campaign is aimed\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/West-Gharib-Meseda.png?fit=519%2C493&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12333,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-completion-of-drilling-at-msd-24-well-west-gharib-concession\/","url_meta":{"origin":11533,"position":4},"title":"EGYPT : SDX Energy Completion Of Drilling At MSD-24 Well, West Gharib Concession","author":"","date":"June 13, 2022","format":false,"excerpt":"SDX Energy has completed of drilling at the MSD-24 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-24 encountered the primary top Asl Formation reservoir at 4,089ft MD (3,276ft TVDSS) and reached a TD of 4,625 feet MD on 5 June 2022. The well encountered\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12447,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-announces-completion-of-5th-well-in-its-west-gharib-concession\/","url_meta":{"origin":11533,"position":5},"title":"EGYPT: SDX Energy Announces Completion of 5th Well in its West Gharib Concession","author":"","date":"July 15, 2022","format":false,"excerpt":"SDX Energy has announced the completion of drilling at the MSD-23 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-23 encountered the primary top Asl Formation reservoir at 3,909 feet MD (3,112 feet TVDSS) and reached a TD of 4,449 feet MD on 10 July.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11533","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11533"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11533\/revisions"}],"predecessor-version":[{"id":11534,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11533\/revisions\/11534"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/10686"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11533"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11533"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}