{"id":11464,"date":"2021-12-24T07:30:38","date_gmt":"2021-12-24T07:30:38","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11464"},"modified":"2021-12-24T07:30:38","modified_gmt":"2021-12-24T07:30:38","slug":"egypt-completion-of-drilling-at-msd-21-well-west-gharib-concession","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-completion-of-drilling-at-msd-21-well-west-gharib-concession\/","title":{"rendered":"EGYPT: Completion of Drilling at Msd-21 Well, West Gharib Concession"},"content":{"rendered":"<p class=\"de\"><span class=\"df\">SDX Energy has announced the completion of drilling at the MSD-21 infill development well on the Meseda field in its West Gharib concession,\u00a0\u00a0Egypt. \u00a0MSD-21 encountered the primary top Asl Formation reservoir at 4,040ft MD (-3,251ft TVDSS) and reached a TD of 4,740ft. The well encountered 62.3ft of good-quality, net oil pay sandstone, with an average porosity of 21.3% in the Asl Formation reservoir. MSD-21 will now be tied-in to the existing facilities and flow tested.<\/span><span class=\"df\">\u00a0<\/span><\/p>\n<p class=\"de\"><span class=\"df\">MSD-21 is the first well in a fully-funded, 12-well development campaign on the Meseda and Rabul oil fields in the West Gharib concession, Egyptian Eastern Desert. The development drilling campaign is aimed at growing production from current rates of c. 2,100bbl\/d to c. 3,500 &#8211; 4,000bbl\/d by early 2023.<\/span><span class=\"df\">\u00a0<\/span><\/p>\n<p class=\"de\"><span class=\"df\">The rig will now move to the next well in the campaign, MSD-25, which is expected to spud in early to\u00a0mid-January 2022.<\/span><span class=\"dg\">\u00a0<\/span><\/p>\n<p class=\"dh\"><span class=\"cq\">Mark Reid, CEO of SDX, commented:<\/span><span class=\"cq\">\u00a0<\/span><\/p>\n<p class=\"di\"><span class=\"cq\">&#8220;The logs from MSD-21 are encouraging and the well will now be connected to our infrastructure and flow tested. We will update the market in the coming weeks on production rates. \u00a0With YTD Q3 2021 netback of\u00a0US$35\/bbl at\u00a0US$68\/bbl Brent, West Gharib is currently a very high margin asset in our portfolio and \u00a0MSD-21, and subsequent wells, will boost the production and cashflow from these fields in the coming months.\u00a0 I look forward to updating the market further as the campaign progresses.&#8221;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SDX Energy has announced the completion of drilling at the MSD-21 infill development well on the Meseda field in its West Gharib concession,\u00a0\u00a0Egypt. \u00a0MSD-21 encountered the primary top Asl Formation &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-completion-of-drilling-at-msd-21-well-west-gharib-concession\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":11465,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[7710,709,9684,9685,9956,9957,7626],"class_list":["post-11464","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-eastern-desert","tag-egypt","tag-meseda-field","tag-msd-21","tag-msd-25","tag-rabul-oil-fields","tag-west-gharib","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=2048%2C1405&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2YU","jetpack-related-posts":[{"id":11920,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-completion-of-drilling-at-msd-25-well-west-gharib-oil-concession\/","url_meta":{"origin":11464,"position":0},"title":"EGYPT: SDX Energy Completion Of Drilling At Msd-25 Well, West Gharib Oil Concession","author":"","date":"February 28, 2022","format":false,"excerpt":"SDX Energy has announced the completion of drilling at the MSD-25 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-25 encountered the primary top Asl Formation reservoir at 4,109ft MD (3,361ft TVDSS) and reached a TD of 4,385ft MD. The well encountered 84.8ft of good-quality,\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-Eastern-Desert.jpg?fit=470%2C616&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12333,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-completion-of-drilling-at-msd-24-well-west-gharib-concession\/","url_meta":{"origin":11464,"position":1},"title":"EGYPT : SDX Energy Completion Of Drilling At MSD-24 Well, West Gharib Concession","author":"","date":"June 13, 2022","format":false,"excerpt":"SDX Energy has completed of drilling at the MSD-24 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-24 encountered the primary top Asl Formation reservoir at 4,089ft MD (3,276ft TVDSS) and reached a TD of 4,625 feet MD on 5 June 2022. The well encountered\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12447,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-announces-completion-of-5th-well-in-its-west-gharib-concession\/","url_meta":{"origin":11464,"position":2},"title":"EGYPT: SDX Energy Announces Completion of 5th Well in its West Gharib Concession","author":"","date":"July 15, 2022","format":false,"excerpt":"SDX Energy has announced the completion of drilling at the MSD-23 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-23 encountered the primary top Asl Formation reservoir at 3,909 feet MD (3,112 feet TVDSS) and reached a TD of 4,449 feet MD on 10 July.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11533,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-commencement-of-oil-production-at-msd-21-well-west-gharib-concession\/","url_meta":{"origin":11464,"position":3},"title":"EGYPT: SDX Energy Commencement of Oil Production At Msd-21 Well, West Gharib Concession","author":"","date":"January 6, 2022","format":false,"excerpt":"SDX Energy has announced the commencement of oil production at the MSD-21 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-21, which encountered the primary top Asl Formation reservoir at 4,040ft MD (3,251ft TVDSS) and reached 4,740ft TD, after drilling through 62.3ft of good-quality, net\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-Eastern-Desert.jpg?fit=470%2C616&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12532,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egyptsdx-energy-spuds-msd-27-infill-development-well\/","url_meta":{"origin":11464,"position":4},"title":"EGYPT:SDX Energy Spuds MSD-27 Infill Development Well","author":"","date":"August 2, 2022","format":false,"excerpt":"SDX Energy has announced the spudding of the MSD-27 infill development well on\u00a021 July 2022\u00a0at the Meseda Field, West Gharib concession,\u00a0Egypt. MSD-27 is targeting the primary Asl Formation reservoir at around 3,900 feet MD (3,100 feet TVDSS) and is the sixth well in a fully-funded, 13 well development campaign on\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/Egypt-Meseda-Permit-Map-2048x1405-1.png?fit=1200%2C823&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12050,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-achieves-first-oil-at-msd-25-well-west-gharib-concession\/","url_meta":{"origin":11464,"position":5},"title":"EGYPT: SDX Energy Achieves First Oil At Msd-25 Well, West Gharib Concession","author":"","date":"March 17, 2022","format":false,"excerpt":"SDX Energy has announced the commencement of oil production at the MSD-25 infill development well on the Meseda field in its West Gharib concession, Egypt. MSD-25, which encountered the primary top Asl Formation reservoir at 4,109ft MD (3,361ft TVDSS) and reached 4,385ft TD on 22 February 2022, after drilling through\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/Oil-Pump-Jack.jpg?fit=1024%2C630&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11464"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11464\/revisions"}],"predecessor-version":[{"id":11466,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11464\/revisions\/11466"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/11465"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}