{"id":11460,"date":"2021-12-23T06:57:39","date_gmt":"2021-12-23T06:57:39","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11460"},"modified":"2021-12-23T06:57:39","modified_gmt":"2021-12-23T06:57:39","slug":"gambia-bambo-1-well-disappoints","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-bambo-1-well-disappoints\/","title":{"rendered":"GAMBIA: Bambo-1 Well Disappoints"},"content":{"rendered":"<p>FAR has announced that it will plug and abandon Bambo-1 well and Bambo-1ST1 side-track well after drilling operations failed to encounter oil.<\/p>\n<p>Far said it had concluded the drilling and formation evaluation operations for the Bambo-1ST1 well offshore the Gambia. Bambo-1 was initially drilled to a depth of 3216m MDBRT and wireline logging data was obtained. The Bambo1 well was then plugged and the Bambo-1ST1 (side-track) well drilled to a depth of 3317m MDBRT after which, wireline loggings were conducted.<\/p>\n<p>The drilling and logging data obtained on the main well and the side-track well indicates that several target intervals in the well had oil shows, confirming a prolific oil source is present in the area. Samples were recovered from several levels. According to FAR the presence or otherwise of any oil will be confirmed by laboratory analysis.<\/p>\n<p>The side-track well was planned to be drilled to the final total depth through all target reservoirs and also to intersect zones of interest from the main well in a different location which will provide additional data and to sample potential oil. Interpretation of the cuttings and wireline logging information indicates that these zones have been charged with oil in rather poor-quality reservoirs and in traps that might have been breached,<br \/>\nleaving behind some residual oils in the reservoirs.<\/p>\n<p>The side-track well also intersected oil shows in the Soloo Deep units not previously encountered by the original well or other wells in the area. The oil shows encountered were persistent over several hundred metres, confirming access to the prolific oil-generative kitchen is present which may open additional material exploration opportunities and running room in both the A2 and A5 Blocks.<\/p>\n<p>Cath Norman, FAR Managing Director said, \u201cAlthough no moveable oil was interpreted, FAR is encouraged to have encountered good oil shows and potential reservoirs in the Bambo-1 well and Bambo-1ST1 side-track. The project has provided significant geological information, including new play types, that reaffirms the potential of further hydrocarbon prospects in the A2 and A5 blocks in the Gambia. Bambo-1 and the side-track have confirmed that all of the requisite petroleum system elements are present in the area and the technical team is already busy integrating the new data and high-grading future prospects.\u201d<\/p>\n<p>\u201cThe drilling conditions for the Bambo-1 well presented some technical challenges, but we completed the well and the side-track operations safely and within our amended budget. We thank our drilling team at Exceed and Stena for working co-operatively with FAR in completing this program.\u201d<\/p>\n<p>\u201cFAR looks forward to working with its co-venturer Petronas and the Government of The Gambia on the next steps in realising the exploration potential in country.\u201d<\/p>\n<p>FAR is Operator and a 50% interest holder in the A2 Licence, offshore The Gambia in which the Bambo well has been drilled. The well fulfills the minimum work obligation of drilling one exploration well for the Initial Exploration Periods for both the A2 and A5 Licences.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>FAR has announced that it will plug and abandon Bambo-1 well and Bambo-1ST1 side-track well after drilling operations failed to encounter oil. Far said it had concluded the drilling and &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/gambia-bambo-1-well-disappoints\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":10998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7444],"tags":[9953,9954,8415,867,950,2024,9952],"class_list":["post-11460","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-west-africa","tag-a2-licence","tag-a5-licence","tag-bambo-1","tag-far","tag-gambia","tag-petronas","tag-soloo-deep","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2YQ","jetpack-related-posts":[{"id":11644,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-far-concludes-drilling-formation-evaluation-operations-for-the-bambo-1-well-bambo-1st1-in-block-a2\/","url_meta":{"origin":11460,"position":0},"title":"GAMBIA: FAR concludes drilling &#038; Formation Evaluation Operations for the Bambo-1 well &#038; Bambo-1ST1 in Block A2","author":"","date":"January 19, 2022","format":false,"excerpt":"FAR concluded the drilling and formation evaluation operations for the Bambo-1 well and Bambo-1ST1 sidetrack well in Block A2, offshore The Gambia. Bambo-1 was initially drilled to a depth of 3216m MDBRT (measured depth below rotary table) and wireline logging data was obtained. The Bambo-1 well was then plugged and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Gambia-Bambo-1.png?fit=533%2C596&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11307,"url":"https:\/\/www.oilnewskenya.com\/index.php\/bambo-1-well-to-be-side-tracked-driving-costs-far\/","url_meta":{"origin":11460,"position":1},"title":"GAMBIA: Bambo-1 Well  to be Side Tracked Driving Costs &#8211; FAR","author":"","date":"December 6, 2021","format":false,"excerpt":"FAR advises that the Bambo-1 well has drilled 3216m MDBRT (measured depth below the rotary table) of a total planned depth of 3450m MDBRT. Oil indications have been detected in rock cuttings and hydrocarbons have been interpreted across several intervals in the well from LWD data (logging whilst drilling). Further\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11867,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-far-completes-review-of-the-prospectivity-of-blocks-a2-and-a5\/","url_meta":{"origin":11460,"position":2},"title":"GAMBIA: FAR Completes Review of the Prospectivity of Blocks A2 and A5","author":"","date":"February 21, 2022","format":false,"excerpt":"FAR\u00a0 has completed a review of the prospectivity of the A2 and A5 blocks offshore the Gambia, following the Bambo drilling campaign in late 2021. The drilling and logging data obtained on the main well (Bambo-1) and the side-track well (Bambo-ST1) confirmed both the presence of a prolific oil source\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/02\/Gambia-Block-A2-A5.png?fit=382%2C427&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10621,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-bambo-1-well-oncourse-for-spudding-in-q4-of-2021\/","url_meta":{"origin":11460,"position":3},"title":"GAMBIA: Bambo-1 well Oncourse for Spudding in Q4 of 2021","author":"","date":"July 22, 2021","format":false,"excerpt":"FAR has contracted Exceed\u2019s wells management team in Aberdeen to assist with the planning and execution of the well. The contract for the drillship was executed during the quarter and rig owner and operator, Stena, has advised the window for mobilisation of the Stena IceMax drillship to Gambia to be\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/Gambia-Bambo-1-well.jpg?fit=378%2C400&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10446,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-far-drilling-of-bambo-1-well-on-target-for-q4\/","url_meta":{"origin":11460,"position":4},"title":"Gambia: FAR drilling of Bambo-1 well on target for Q4","author":"","date":"June 17, 2021","format":false,"excerpt":"FAR Limited has locked in the timetable for drilling the Bambo-1 well offshore The Gambia by executing a contract with Stena Drillmax Ice Limited to commence drilling operations in Q4 of this year. The Bambo-1 well in Block A2 offshore The Gambia, is designed to drill into 3 prospects with\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":11137,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gambia-bambo-1-well-drilling-commences-offshore-block-a2\/","url_meta":{"origin":11460,"position":5},"title":"GAMBIA: Bambo-1 Well Drilling Commences Offshore Block A2","author":"","date":"November 15, 2021","format":false,"excerpt":"FAR Gambia advises that drilling has commenced on the Bambo-1 exploration well in Block A2, offshore The Gambia. The Stena IceMax drillship arrived on site on 12 November Gambian time and after completing preparations, has successfully spudded the well. The Bambo-1 well is located approximately 85km offshore The Gambia, in\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Bambo-1.png?fit=534%2C352&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11460","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11460"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11460\/revisions"}],"predecessor-version":[{"id":11461,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11460\/revisions\/11461"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/10998"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}