{"id":11376,"date":"2021-12-14T08:33:22","date_gmt":"2021-12-14T08:33:22","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11376"},"modified":"2021-12-14T08:33:22","modified_gmt":"2021-12-14T08:33:22","slug":"gabon-vaalco-spuds-first-well-in-2021-2022-drilling-campaign","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-spuds-first-well-in-2021-2022-drilling-campaign\/","title":{"rendered":"GABON: Vaalco Spuds First Well in 2021\/2022 Drilling Campaign"},"content":{"rendered":"<p>VAALCO Energy has announced that it has commenced its 2021\/2022 drilling campaign offshore Gabon with the Etame 8H-ST well.<\/p>\n<p align=\"justify\">Under a drilling contract announced by VAALCO in early summer, a jack-up rig provided by Borr West Africa Assets Inc., an affiliate of Borr Drilling Limited was recently deployed to the Etame platform and has commenced activities on the Etame 8H-ST development well which is expected to be completed in January with production expected later in the first quarter of 2022. This sidetrack of an existing well is targeting existing Gamba hydrocarbons in the Etame field that have not previously been produced by prior wells, and is the first well of a four-well campaign.<\/p>\n<p align=\"justify\">George Maxwell, VAALCO\u2019s Chief Executive Officer, commented, \u201cEnhancing our production, reducing our costs and extending the economic life at Etame has been the driving force for VAALCO\u2019s continued success. This summer we secured a jack-up rig for our 2021\/2022 drilling campaign and began drilling our first well, the Etame 8H-ST, this week. We believe that executing another successful drilling campaign with the goal of adding material production and reserves will significantly improve our size and scale, further enhancing our ability to execute on our accretive future growth initiatives. The objective of the drilling campaign is to increase production by 7,000 to 8,000 barrels of oil per day gross, which would have a material impact on VAALCO\u2019s net production and cashflow given it\u2019s 63.6% interest in the licence. We are confident we can achieve these objectives given our drilling track record at Etame. We are excited to get our next drilling campaign underway and will continue to provide updates throughout the program.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>VAALCO Energy has announced that it has commenced its 2021\/2022 drilling campaign offshore Gabon with the Etame 8H-ST well. Under a drilling contract announced by VAALCO in early summer, a &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-spuds-first-well-in-2021-2022-drilling-campaign\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":9241,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,11,7444],"tags":[9888,8952,9887,944,8731],"class_list":["post-11376","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-top-news","category-west-africa","tag-borr-west-africa-assets","tag-etame","tag-etame-8h-st","tag-gabon","tag-vaalco-energy","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/10\/GABON-ETAME.jpg?fit=376%2C485&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2Xu","jetpack-related-posts":[{"id":15420,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabonn-vaalco-energy-spuds-first-well-in-phase-three-drilling-program\/","url_meta":{"origin":11376,"position":0},"title":"GABON: VAALCO Energy, Spuds First Well in Phase Three Drilling Program","author":"","date":"December 13, 2025","format":false,"excerpt":"VAALCO Energy has announced that it has commenced its Phase Three Drilling Program offshore Gabon with the spudding of the ET-15 infill well on the Etame platform. George Maxwell, Vaalco\u2019s Chief Executive Officer, commented, \u201cWe are excited to commence our drilling campaign in offshore Gabon and are beginning the near-term\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Borr-Gerd.webp?fit=800%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Borr-Gerd.webp?fit=800%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Borr-Gerd.webp?fit=800%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Borr-Gerd.webp?fit=800%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":15710,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-energy-announces-encouraging-initial-well-results-on-the-etame-14h-well\/","url_meta":{"origin":11376,"position":1},"title":"GABON: Vaalco Energy Announces Encouraging Initial Well Results on the Etame 14H well","author":"Samuel Kamau Mbote","date":"April 21, 2026","format":false,"excerpt":"VAALCO Energy has announced positive operational updates in Gabon regarding the ongoing drilling program, including encouraging initial well results on the Etame 14H well and mobilized the rig to the Ebouri platform. Additionally, the Company provided updates on the timing of bringing the Baobab field in CI-40 block, offshore C\u00f4te\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/VAALCO.png?fit=1200%2C735&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/VAALCO.png?fit=1200%2C735&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/VAALCO.png?fit=1200%2C735&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/VAALCO.png?fit=1200%2C735&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/03\/VAALCO.png?fit=1200%2C735&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":10453,"url":"https:\/\/www.oilnewskenya.com\/index.php\/vaalco-secures-rig-for-2021-2022-drilling-campaign\/","url_meta":{"origin":11376,"position":2},"title":"VAALCO Secures Rig for 2021\/2022 Drilling Campaign","author":"","date":"June 17, 2021","format":false,"excerpt":"VAALCO Energy has announced it has executed a contract with Borr Jack-Up XIV Inc., an affiliate of Borr Drilling Limited, to drill two development wells and two appraisal wellbores with options to drill additional wells. The contract provides, among other things, that the drilling rig can be on location as\u2026","rel":"","context":"In \"Borr Drilling Limited\"","block_context":{"text":"Borr Drilling Limited","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/borr-drilling-limited\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":10812,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-announces-binding-loi-for-fso-at-etame\/","url_meta":{"origin":11376,"position":3},"title":"GABON: VAALCO Announces Binding LoI for FSO at Etame","author":"","date":"August 26, 2021","format":false,"excerpt":"VAALCO Energy has signed a binding letter of intent with World Carrier Offshore Services Corp.\u00a0 to provide and operate a Floating Storage and Offloading (FSO) unit at VAALCO\u2019s Etame Marin field offshore Gabon for up to eight years with additional option periods available upon the expiration of the current Floating\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/10\/GABON-ETAME.jpg?fit=376%2C485&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":15664,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-energy-provides-operational-update-on-offshore-drilling-program\/","url_meta":{"origin":11376,"position":4},"title":"GABON: VAALCO Energy Provides Operational Update on Offshore Drilling Program","author":"Samuel Kamau Mbote","date":"March 12, 2026","format":false,"excerpt":"VAALCO Energy has provided an operational update on its Phase Three Drilling Program offshore Gabon. Vaalco has completed drilling the Etame West ET-14P exploration well. While the well encountered 10 meters of high-quality Gamba sands, in line with pre-drill predictions, the target zone was water-bearing. The lower portion of the\u2026","rel":"","context":"In \"ET-14H\"","block_context":{"text":"ET-14H","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/et-14h\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/GABON-ETAME.jpg?fit=376%2C485&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12317,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-vaalco-energy-announces-successful-drilling-of-south-tchibala-1hb-st-well\/","url_meta":{"origin":11376,"position":5},"title":"GABON: VAALCO Energy Announces Successful Drilling of South Tchibala 1HB-ST Well","author":"","date":"June 6, 2022","format":false,"excerpt":"VAALCO Energy has completed the\u00a0successful drilling of the South Tchibala 1HB-ST well that was drilled from the Avouma platform in the Etame field, offshore Gabon. Highlights Discovered significant columns of multiple hydrocarbon bearing sands in the Dentale; Completing the Dentale D1 sand (18 meters net hydrocarbons) interval, which is analogous\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/GABON-ETAME.jpg?fit=376%2C485&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11376"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11376\/revisions"}],"predecessor-version":[{"id":11377,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11376\/revisions\/11377"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/9241"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}