{"id":11294,"date":"2021-12-03T11:26:28","date_gmt":"2021-12-03T11:26:28","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11294"},"modified":"2021-12-03T11:26:28","modified_gmt":"2021-12-03T11:26:28","slug":"angola-start-up-of-clov-phase-2-project","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/angola-start-up-of-clov-phase-2-project\/","title":{"rendered":"ANGOLA: Start-up of CLOV Phase 2 project"},"content":{"rendered":"<p>TotalEnergies, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency (ANPG) have announced the start of production of CLOV Phase 2, a project connected to the existing CLOV FPSO (Floating Production, Storage and Offloading unit). This tie-back project will reach a production of 40,000 barrels of oil equivalent per day in mid-2022.<\/p>\n<p>Located about 140 kilometers from the Angolan coast, in water depths from 1,100 to 1,400 meters, the CLOV Phase 2 resources are estimated at around 55 million barrels of oil equivalent.<\/p>\n<p>Launched in 2018, this project was carried out within budget and planned execution duration, despite the challenges associated with the Covid-19 pandemic.<\/p>\n<p>\u201cThe start of the production of CLOV Phase 2, a few months after Zinia Phase 2, demonstrates our continuous efforts to ensure a sustainable output on Block 17. This project fits within the company\u2019s strategy to focus its upstream investments on low-cost projects which contribute to lower the average GHG emissions intensity of its production\u201d,\u00a0said Henri-Max Ndong-Nzue, Senior Vice-President Africa, Exploration and Production at TotalEnergies. \u201cCLOV Phase 2 start-up also highlights the performance of our teams despite the health crisis \u201c.<\/p>\n<p>Belarmino Chitangueleca, acting President of the ANPG, commented that \u201cCLOV Phase 2 start-up comes at the right time to sustain the national oil production. We value the performance of the operator and the contractor group to keep executing projects despite this crisis period.\u201d<\/p>\n<p>Block 17 is operated by TotalEnergies with a 38% stake, alongside Equinor (22.16%), ExxonMobil (19%), BP Exploration Angola Ltd (15.84%) and Sonangol P&amp;P (5%). The Contractor Group operates four FPSOs in the main production areas of the block, namely Girassol, Dalia, Pazflor and CLOV.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TotalEnergies, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency (ANPG) have announced the start of production of CLOV Phase 2, a project &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/angola-start-up-of-clov-phase-2-project\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":10304,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445,11],"tags":[160,7458,268,346,8736,8733,7135,860,918,8734,8735,2362,9029],"class_list":["post-11294","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","category-top-news","tag-angola","tag-anpg","tag-block-17","tag-bp","tag-clov","tag-dalia","tag-equinor","tag-exxonmobil","tag-fpso","tag-girassol","tag-pazflor","tag-sonangol","tag-total-energies","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/angola-block-17.jpg?fit=750%2C500&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2Wa","jetpack-related-posts":[{"id":10303,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-total-starts-production-from-zinia-phase-2-successful-short-cycle-development-on-block-17\/","url_meta":{"origin":11294,"position":0},"title":"ANGOLA: Total Starts Production From Zinia Phase 2, Successful Short-Cycle Development On Block 17","author":"","date":"May 6, 2021","format":false,"excerpt":"Total, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency, announce the start of production from Zinia Phase 2 short-cycle project, connected to existing Pazflor\u2019s FPSO (Floating Production, Storage and Offloading unit). The project includes the drilling of nine wells and is expected\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/angola-block-17.jpg?fit=750%2C500&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/angola-block-17.jpg?fit=750%2C500&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/angola-block-17.jpg?fit=750%2C500&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/angola-block-17.jpg?fit=750%2C500&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":15036,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-anpg-azule-energy-partners-of-block-15-06-celebrate-arrival-of-fpso-agogo\/","url_meta":{"origin":11294,"position":1},"title":"ANGOLA: ANPG, Azule Energy &amp; Partners of Block 15\/06 Celebrate Arrival of FPSO Agogo","author":"","date":"May 19, 2025","format":false,"excerpt":"The National Oil, Gas and Biofuels Agency (ANPG), Azule Energy and the partners of Block 15\/06, namely Sonangol Exploration and Production and Sinopec, celebrate the arrival, today, of the floating production, storage and offloading vessel (FPSO) Agogo in Angolan waters, with operations scheduled to begin in the second half of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/fpso-agogo-2.jpg?fit=700%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/fpso-agogo-2.jpg?fit=700%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/fpso-agogo-2.jpg?fit=700%2C400&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/05\/fpso-agogo-2.jpg?fit=700%2C400&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9529,"url":"https:\/\/www.oilnewskenya.com\/index.php\/norco-group-lands-a-new-maintenance-contract-with-total\/","url_meta":{"origin":11294,"position":2},"title":"ANGOLA: Norco Lands a New Maintenance Contract with Total E&#038;P Angola","author":"","date":"December 11, 2020","format":false,"excerpt":"An established energy storage equipment manufacturer and service provider,\u00a0Norco Group\u00a0will support\u00a0Uninterruptible Power Supply (UPS) systems and standby battery equipment\u00a0on\u00a0TEP Angola\u2019s assets in offshore Block 17. This includes the\u00a0Dalia, Girassol, Pazflor and CLOV Floating Production, Storage and Offloading facilities (FPSOs). Running for three years with an optional two-year extension, the contact\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Angola-terrestrial-bassins.jpg?fit=1200%2C492&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Angola-terrestrial-bassins.jpg?fit=1200%2C492&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Angola-terrestrial-bassins.jpg?fit=1200%2C492&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Angola-terrestrial-bassins.jpg?fit=1200%2C492&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Angola-terrestrial-bassins.jpg?fit=1200%2C492&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":10059,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ashtead-technology-lands-marine-services-project-awards-in-the-pazflor-and-clove-fields\/","url_meta":{"origin":11294,"position":3},"title":"ANGOLA:\u00a0Ashtead Technology Lands Marine Services Project Award in the\u00a0Pazflor and CLOV fields","author":"","date":"March 21, 2021","format":false,"excerpt":"A new partnership between\u00a0Ashtead Technology\u00a0and\u00a0Ocean Atlantic Petroleum (OAP), has successfully executed its first marine services project in West Africa and has received award for further work. Integrated subsea technology and services specialist, Ashtead Technology entered into a co-operation agreement with inspection and asset integrity company, OAP. Leveraging their joint capabilities,\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Angola-Block-17.png?fit=595%2C425&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Angola-Block-17.png?fit=595%2C425&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/03\/Angola-Block-17.png?fit=595%2C425&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12111,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-eni-achieves-start-up-from-ndungu-ep-development-project-in-the-western-area-of-block-15-06-2\/","url_meta":{"origin":11294,"position":4},"title":"ANGOLA: Eni Achieves Start-up from Ndungu EP Development Project in the Western area of Block 15\/06","author":"","date":"March 29, 2022","format":false,"excerpt":"Eni started production from Ndungu Early Production (EP) development project, in Block 15\/06 of the Angolan deep offshore, via the Ngoma Floating Production Storage and Offloading (FPSO) vessel. The start-up of Ndungu EP is yet another example of how Eni Angola, in full cooperation with Ag\u00eancia Nacional de Petr\u00f3leo, G\u00e1s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Angola-Block-15-06.jpeg?fit=368%2C500&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":14927,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-anpg-totalenergies-begin-work-on-fpso-kaminho\/","url_meta":{"origin":11294,"position":5},"title":"ANGOLA: ANPG, TotalEnergies Begin Work on \u00a0FPSO Kaminho","author":"","date":"April 22, 2025","format":false,"excerpt":"The National Agency of Petroleum, Gas and Biofuels (ANPG) and TotalEnergies Angola began work on Monday, 14 April, on the conversion of the future floating crude oil production unit,\u00a0FPSO Kaminho\u00a0, in the city of Nantong, People\u2019s Republic of China. This is a significant milestone for a pioneering project that represents\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Kaminho.jpg?fit=700%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Kaminho.jpg?fit=700%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Kaminho.jpg?fit=700%2C400&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2025\/04\/Kaminho.jpg?fit=700%2C400&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11294"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11294\/revisions"}],"predecessor-version":[{"id":11295,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11294\/revisions\/11295"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/10304"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11294"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11294"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}