{"id":11084,"date":"2021-11-05T09:12:49","date_gmt":"2021-11-05T09:12:49","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11084"},"modified":"2021-11-05T09:12:49","modified_gmt":"2021-11-05T09:12:49","slug":"zimbabwe-cabora-bassa-seismic-completed","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-cabora-bassa-seismic-completed\/","title":{"rendered":"ZIMBABWE: Cabora Bassa Seismic Completed"},"content":{"rendered":"<p>The Cabora Bassa 2021 seismic survey has been completed with a total of 839.5 km of high-resolution 2D seismic data acquired. A total of 402.2 km of data was acquired in SG 4571 and following approvals, a further 437.1 km of contiguous data was acquired in an existing application area. The CB21 Seismic Survey significantly exceeds the Company\u2019s minimum work program obligations of 300km of 2D seismic data for the current license<br \/>\nthe period which runs to June 2024.<\/p>\n<p>The remaining geophone retrieval was completed on 2nd November and final data harvesting will be completed in the coming days. The demobilization of equipment and personnel has commenced and is expected to be completed in the next week.<br \/>\nThe HSE performance throughout the program has been exceptional, and the project has now exceeded 142,000 hours without a Lost Time Injury (LTI) or recordable incident and is a testament to the Polaris and Invictus teams.<\/p>\n<p>The CB21 Seismic Survey generated nearly 200 direct jobs during the campaign for the local Muzarabani and Mbire communities as well as the procurement of goods and services from local suppliers in keeping with the Company\u2019s strong local content policy.<\/p>\n<p>The Company also implemented a student and lecturer attachment program from the local universities to develop and transfer skills in the oil and gas industry.<\/p>\n<p>Invictus Managing Director Scott Macmillan commented:<br \/>\n\u201cThe completion of the CB21 Seismic Survey is a significant milestone for the Company in our exploration program in the Cabora Bassa Basin. The quality of the high-resolution seismic data we have acquired is excellent and providing great insights into the petroleum potential of the basin. The Company would like to acknowledge Polaris and the local Invictus and One-Gas teams for the outstanding seismic campaign which<br \/>\nhas generated a fantastic dataset and importantly was achieved with excellent health and safety performance with 142,000 hours LTI and incident free.<br \/>\nThe seismic data processing and interpretation is ongoing once completed will enable us to identify and mature additional prospects and leads. The better imaging over the giant Muzarabani structure is very encouraging and once the interpretation of the full dataset is completed, we expect to refine the location for the basin opening Muzarabani-1 well which is scheduled to be drilled in 1H 2022.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Cabora Bassa 2021 seismic survey has been completed with a total of 839.5 km of high-resolution 2D seismic data acquired. A total of 402.2 km of data was acquired &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-cabora-bassa-seismic-completed\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":11085,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7445],"tags":[7808,9731,2272,2767],"class_list":["post-11084","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-southern-africa","tag-cabora-bassa","tag-muzarabani-1-well","tag-seismic","tag-zimbabwe","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/ZIMBABWE-SEISMIC.png?fit=642%2C482&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2SM","jetpack-related-posts":[{"id":10967,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-cabora-bassa-seismic-acquisition-50-complete\/","url_meta":{"origin":11084,"position":0},"title":"ZIMBABWE: Cabora Bassa Seismic Acquisition 50% Complete","author":"","date":"October 7, 2021","format":false,"excerpt":"Invictus Energy operated\u00a0Cabora Bassa 2021 seismic survey\u00a0 campaign in Zimbabwe is ongoing with 220km of data recording and 240km of layout completed to date. The data quality and density being acquired from the CB21 Survey is excellent and a step change from the Invictus previous Mobil survey conducted in 1990.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":10818,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-cabora-bassa-project-2d-seismic-to-commence-this-week\/","url_meta":{"origin":11084,"position":1},"title":"ZIMBABWE: Cabora Bassa Project 2D Seismic to Commence this Week","author":"","date":"August 31, 2021","format":false,"excerpt":"The preparations for the seismic data acquisition have progressed well with 400 km of line clearance completed ahead of the commencement of data acquisition. The maintenance and checks have been completed on the vibroseis units and mobilization to the field camp in Muzarabani is commencing. Data recording is scheduled to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11911,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-cabora-bassa-final-processed-seismic-data-received\/","url_meta":{"origin":11084,"position":2},"title":"ZIMBABWE: Cabora Bassa Final Processed Seismic Data Received","author":"","date":"February 28, 2022","format":false,"excerpt":"Data processing of the 2021 Cabora Bassa 2D Seismic Survey (CB21 survey) and concurrent reprocessing of a legacy Mobil dataset has largely been completed by onshore high resolution data specialists Earth Signal Processing in Calgary, Canada. All key products have been received by Invictus and seismic interpretation is progressing well.\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":10994,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-energy-completes-cabora-bassa-seismic-survey\/","url_meta":{"origin":11084,"position":3},"title":"ZIMBABWE: Invictus Energy Completes Cabora Bassa Seismic Survey","author":"","date":"October 18, 2021","format":false,"excerpt":"The Cabora Bassa 2021 seismic survey has completed 467km of data acquisition and remediation of the completed lines has commenced. The HSE performance throughout the program has been exceptional, and the project has now exceeded 100,000 hours without a Lost Time Injury (LTI). The preliminary processing of test Line 05\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11818,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-awards-well-services-contract-to-baker-hughes\/","url_meta":{"origin":11084,"position":4},"title":"ZIMBABWE: Invictus Awards Well Services Contract to Baker Hughes","author":"","date":"February 11, 2022","format":false,"excerpt":"Invictus has announced that Baker Hughes has been awarded the integrated well services contract for drilling of the Muzabarani-1 well in the Cabora Bassa basin following the completion of the tender and evaluation process. A Letter of Intent has been executed and the contract is expected to be finalized and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/Zimbabwe-Cabora-Bassa.jpg?fit=570%2C797&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11125,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zimbabwe-invictus-reports-encouraging-preliminary-seismic-results\/","url_meta":{"origin":11084,"position":5},"title":"ZIMBABWE: Invictus Reports Encouraging Preliminary Seismic Results","author":"","date":"November 12, 2021","format":false,"excerpt":"Invictus Energy Limited has provided an update on the activities of its 80% owned and operated Cabora Bassa Project in Zimbabwe. CB21 Seismic Survey Preliminary Results Encouraging Following the completion of the Cabora Bassa 2021 seismic survey (CB21 Survey) in early November which acquired a total of 839.3km of high\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/ZIMBABWE-Cabora-Basa-Seismic-Map.png?fit=879%2C372&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/ZIMBABWE-Cabora-Basa-Seismic-Map.png?fit=879%2C372&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/ZIMBABWE-Cabora-Basa-Seismic-Map.png?fit=879%2C372&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/ZIMBABWE-Cabora-Basa-Seismic-Map.png?fit=879%2C372&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11084","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11084"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11084\/revisions"}],"predecessor-version":[{"id":11086,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11084\/revisions\/11086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/11085"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}