{"id":11023,"date":"2021-10-22T09:33:50","date_gmt":"2021-10-22T09:33:50","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=11023"},"modified":"2021-10-22T09:33:50","modified_gmt":"2021-10-22T09:33:50","slug":"nigeria-decklar-resources-completion-operations-for-the-oza-1-well","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-completion-operations-for-the-oza-1-well\/","title":{"rendered":"NIGERIA: Decklar Resources Completion Operations for the Oza-1 well"},"content":{"rendered":"<p>Decklar Resources\u00a0has announced the commencement of completion operations for the\u00a0Oza-1 well re-entry.<\/p>\n<p>As previously announced, the Oza-1 well re-entry has been successfully flow-tested in the three target zones (L2.2, L2.4, and L2.6). The final well completion design and procurement has been concluded, with all completion equipment now having arrived on location at the Oza-1 well. Completion operations on the well have commenced, which include running 2 7\/8\u201d tubing, production packers, sliding sleeves and gas lift equipment, with all activities anticipated to conclude within 7 to 10 days. The well will be initially configured for production from the L2.6 zone, which tested at rates up to 2,463 bopd as previously announced.<\/p>\n<p>All early production facilities have been installed and function tested including a 5,000 bopd three phase separator, crude oil storage tanks and export pumps.<\/p>\n<p>Duncan Blount, CEO of Decklar Resources, remarked<em>\u00a0&#8216;We look forward to completing the Oza-1 well and bringing the Oza Field into full time commercial production for the first time since its discovery in the 1970s. This is an exciting milestone for us at Decklar as we transition to being an oil producing company. With oil prices at a seven year high, this is a very exciting time for the commencement of production for the company. From here, we will continue with full field development at Oza, and also look forward to pursuing similar re-entry strategies at our Asaramatoru and Emohua Fields.&#8217;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Decklar Resources\u00a0has announced the commencement of completion operations for the\u00a0Oza-1 well re-entry. As previously announced, the Oza-1 well re-entry has been successfully flow-tested in the three target zones (L2.2, L2.4, &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-completion-operations-for-the-oza-1-well\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":10382,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7444],"tags":[9695,9443,9696,9323],"class_list":["post-11023","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-west-africa","tag-asaramatoru","tag-decklar-resources","tag-emohua-field","tag-oza-1-well","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2RN","jetpack-related-posts":[{"id":10718,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-continues-re-entry-operations-at-the-oza-1-well-site\/","url_meta":{"origin":11023,"position":0},"title":"NIGERIA: Decklar Resources Continues Re-entry Operations at the Oza-1 Well Site","author":"","date":"August 12, 2021","format":false,"excerpt":"Re-entry operations at the Oza-1 well site continue to progress with the completion of critical initial work activities including pulling the existing tubing and the 5 \u00bd inch casing that was inside the 9 \u215d inch casing. The 9 \u215d inch casing has been scrapped and circulated clean and over\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10457,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-provides-oza-1-well-re-entry-update\/","url_meta":{"origin":11023,"position":1},"title":"NIGERIA: Decklar Resources Provides Oza-1 Well Re-Entry Update","author":"","date":"June 17, 2021","format":false,"excerpt":"Rig On-site at Oza-1 Preparing to Commence Operations Decklar has made significant progress in preparation for the Oza-1 well re-entry with the arrival of the drilling rig, camp, and all associated equipment at the site. The drilling rig has been installed and is in the final rigging up stage, and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":10959,"url":"https:\/\/www.oilnewskenya.com\/index.php\/san-leon-energy-announces-successful-oza-1-well-re-entry-testing\/","url_meta":{"origin":11023,"position":2},"title":"San Leon Energy announces Successful Oza-1 Well Re-entry &#038; Testing","author":"","date":"October 6, 2021","format":false,"excerpt":"Oza-1 Well Re-Entry and Testing Highlights The initial flow testing of the L2.4 sand resulted in a flow rate of 10.3 million standard cubic feet of natural gas per day (mmscfpd). The initial flow testing of the L2.2 sand resulted in a flow rate of 1,361 barrels of oil per\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/OML-18.jpg?fit=750%2C598&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/OML-18.jpg?fit=750%2C598&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/OML-18.jpg?fit=750%2C598&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/OML-18.jpg?fit=750%2C598&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10604,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-to-participate-in-asaramatoru-oil-field-in-oml-11\/","url_meta":{"origin":11023,"position":3},"title":"NIGERIA: Decklar Resources to Participate in Asaramatoru Oil field in OML 11","author":"","date":"July 20, 2021","format":false,"excerpt":"Decklar Resources has announced the completion of a Share Purchase Agreement to purchase all of the issued and outstanding ordinary shares of Purion Energy Limited , a Nigerian entity that has entered into a Risk Finance and Technical Services Agreement\u00a0 with Prime Exploration and Production Limited, the Operator of the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10381,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-oza-1-well-re-entry-on-coursewith-the-supporting-infrastructure-installed-operational\/","url_meta":{"origin":11023,"position":4},"title":"NIGERIA: Oza-1 well Re-entry On-coursewith the Supporting Infrastructure Installed &#038; Operational","author":"","date":"May 30, 2021","format":false,"excerpt":"Decklar has said it continues to make considerable progress on the Oza-1 well re-entry with the camp and all associated infrastructure fully installed and operational. The major components of the drilling rig equipment are being transported to the field this week and it is anticipated the rig will be completely\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12241,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-inc-commences-shipment-of-crude-oil-to-market-from-oza-oil-field\/","url_meta":{"origin":11023,"position":5},"title":"NIGERIA: Decklar Resources Inc. Commences Shipment of Crude Oil to Market From Oza Oil Field","author":"","date":"May 10, 2022","format":false,"excerpt":"Decklar and its co-venturer Millenium Oil & Gas Company Limited have commenced loading crude oil into trucks at the Oza Oil Field from storage tanks for delivery to the UPIL crude handling facilities for further transfer to the SPDC Joint Venture Forcados Oil Export Terminal via the Umugini Pipeline. The\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=11023"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11023\/revisions"}],"predecessor-version":[{"id":11024,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/11023\/revisions\/11024"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/10382"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=11023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=11023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=11023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}